S.No | Click Here To Download NIT | Uploading Date | Closing Date | Circle | Address | Classification | Description | Corrigendum / Downloads |
---|---|---|---|---|---|---|---|---|
1. | 03/UJVNL/ DGM(Civil-Arakot-Tiuni-Plasu)/TP/2023-24 | 24-04-2024 | 08-07-2024 | Dehradun | Office of the Dy. General Manager (Civil), Arakot-Tiuni & Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun | Dy. General Manager | Construction of Power House Building, Tail Race Channel, Switch yard and other associated work of Power House site of Tiuni-Plasu HEP (72 MW) on River Tons in District Dehradun of Uttarakhand |
|
2. | 02/UJVNL/ DGM(Civil-Arakot-Tiuni-Plasu)/TP/2023-24 | 24-04-2024 | 08-07-2024 | Dehradun | Office of the Dy. General Manager (Civil), Arakot-Tiuni & Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun | Dy. General Manager | Construction of Head Race Tunnel, Adits, Surge Shaft, Excavation of penstock of Tiuni-Plasu HEP (72 MW) on River Tons in District Dehradun of Uttarakhand |
|
3. | 01/UJVNL/ DGM(Civil-Arakot-Tiuni-Plasu)/TP/2023-24 | 24-04-2024 | 08-07-2024 | Dehradun | Office of the Dy. General Manager (Civil), Arakot-Tiuni & Tiuni Plasu Project, UJVN Limited, Dakpathar, Dehradun | Dy. General Manager | Construction of Barrage, Intake and its appurtenant works including River Diversion of Tiuni-Plasu HEP (72 MW) on River Tons in District Dehradun of Uttarakhand |
|
4. | 01/EE(Civil)/HT/2023-24 | 15-03-2024 | 01-06-2024 | Dehradun | Office of the Executive Engineer (Civil), Arakot-Tiuni, UJVNLtd., Dakpathar (Dehradun) | Executive Engineer | Providing Consultancy Services & Preparation of Comprehensive & Bankable Detailed Project Report of Hanol-Tiuni Hydro Electric Project on River Tons in District Uttarkashi/Dehradun of Uttarakhand |
Time Extn. 1
|
5. | 32/EE(Civil)/MB-I/TN/2023-24 | 20-03-2024 | 02-05-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Safe closure of adits,tunnels,surge shaft from Gunga Gagnani to TRC site near Pala of Loharinag-Pala HEP(600 MW) discontinued in district Uttarkashi. |
Time Extn. 1
|
6. | 31/EE(Civil)/MB-I/TN/2023-24 | 20-03-2024 | 02-05-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Filling of desilting chamber and desilting tunnel and plugging of adits at barrage site Dabrani of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi. |
Time Extn. 1
|
7. | 30/EE(Civil)/MB-I/TN/2023-24 | 20-03-2024 | 02-05-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Restoration of Bhaghirathi river in its original stream and filling of diversion channel at barrage site of Loharinag-Pala HEP (600 MW) discontinued in district Uttarkashi. |
Time Extn. 1
|
8. | 11/EE(Civil-II)/LMP/2023-24 | 12-03-2024 | 23-04-2024 | Dehradun | Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun. | Executive Engineer | Annual Cleaning, upkeeping, Gardening and other miscellaneous work of field Hostel (near inspection house) of Lakhwar project at Dakpathar, Dehradun (Year 2024-25) |
Time Extn. 1
|
9. | 27/EE-II (E&M)/LP/2023-24 | 22-03-2024 | 22-04-2024 | Dakpathar | Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar, UJVN Ltd | Executive Engineer-II | Detailed Engineering & Designing, Procurement, Manufacturing, inspection, Transportation, site erection, installation, testing & commissioning of Early Warning System and Surveillance System of Lakhwar MPP |
|
10. | 07/EE(Civil)/KB/2023-24 | 05-03-2024 | 22-04-2024 | Dakpathar | Office of the Executive Engineer (Civil), Katapathar Barrage, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Providing Consultancy Services for preparation of EPC tender documents and tender stage drawing for Katapathar Barrage on river Yamuna at Katapathar, Dist. Dehradun in Uttarakhand. |
Time Extn. 1
|
11. | 14/EE (Civil)/Lohiahead/Khatima/2023-24 | 02-03-2024 | 20-04-2024 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer | Construction of Type- IV residences in residential complex at Sharda Power House, Lohiahead Khatima Udham Singh Nagar |
Time Extn. 1
|
12. | 32/EE/PCM-DKP/TN/2023-24 | 27-02-2024 | 20-04-2024 | Dakpathar | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Special repair of spillway & roller bucket of bay no 3, 4 & 5, CC Blocks beyond the roller buckets of all spillway and pitching/retaining wall of approach road of Ichari dam |
Time Extn. 1
|
13. | 37/EE(M)/VP/2023-24 | 22-03-2024 | 19-04-2024 | Dakpathar | Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd | Executive Engineer | Zinc coating of Draft tube gates, TRC gates, TRC outfall gates, Surge shaft gates and coating of outer periphery of MIV Inlet Outlet pipe surface at Vyasi HEP, Hathiyari. |
|
14. | 36/EE(M)/VP/2023-24 | 22-03-2024 | 19-04-2024 | Executive Engineer | Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar, UJVN Ltd | Executive Engineer | Supply and application of coating material on Spiral casing inner surface, Stay Vane & Stay ring surface and inlet pipe inner surface of one unit of Vyasi power house, Hathiyari |
|
15. | 28e/EE(G)/CPH/2023-24 | 15-03-2024 | 19-04-2024 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Supply, Installation, Testing and Commissioning of Generator Transformer (75 MVA, 11/220 KV, 3-ø, 50Hz) with all accessories, including dismantling of the existing transformer at 4x60 MW Chibro Power House |
|
16. | 36/EE(Civil)/MB-I/TN/2023-24 | 21-03-2024 | 19-04-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Protection works at Power house site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi. |
Corrigendum 1
|
17. | 35/EE(Civil)/MB-I/TN/2023-24 | 21-03-2024 | 19-04-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Protection works at Surge shaft site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi. |
Corrigendum 1
|
18. | 34/EE(Civil)/MB-I/TN/2023-24 | 21-03-2024 | 19-04-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Protection works at Dabrani and Gunga Adit site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi.. |
Corrigendum 1
|
19. | 33/EE(Civil)/MB-I/TN/2023-24 | 21-03-2024 | 19-04-2024 | Uttarkashi | Office of the Executive Engineer (Civil) Maneri Bhali Stage – Ist , Maneri, Uttarkashi | Executive Engineer | Protection works at Barrage site of Loharinag Pala HEP (600 MW) discontinued in district Uttarkashi. |
Corrigendum 1
|
20. | 03/EE(Civil-IV)/LMP/2023-24 | 25-03-2024 | 18-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-IV), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer | Repair/Reconstruction of motor road from Dam top to Mussorrie bend (Km 9.0 to Km 11.0) at left bank of river Yamuna of Lakhwar MPP |
|
21. | 16/EE(E&M-I)/LP/2023-24 | 26-03-2024 | 18-04-2024 | Dakpathar | Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar | Executive Engineer | Supply of Stationery items for the offices of E&M wing Lakhwar Multi Purpose Project, Dakpathar, Dehradun |
|
22. | T-08/EE(Solar)//2023-24 | 18-03-2024 | 17-04-2024 | Dehradun | Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun | Executive Engineer | Supply, Installation, Testing & Commissioning work of 100 KW(AC) Grid connected Roof Top Solar Power Plant on new office and two Solar Tree at “Ujjwal”, Maharani Bagh GMS Road, Dehradun |
|
23. | PDD-19/2023-24 | 16-03-2024 | 15-04-2024 | Dakpathar | Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Executive Engineer | Supply and fixing of 33 KV LA, earthing of CT/PT and concreting of four pole structure of 33 KV Dhakrani-Chibro feeder at Mazri. |
Download Tender |
24. | 21/EE(Civil-III)/LMP/2023-24 | 20-03-2024 | 15-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer | Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 11.00 to 15.20) at left bank of river Yamuna of Lakhwar MPP |
|
25. | 20/EE(Civil-III)/LMP/2023-24 | 20-03-2024 | 15-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-III), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer | Repair/ Reconstruction of motor road from Dam top to Mussorrie bend (Km 6.2 to Km 9.00 upto Doligad) at left bank of river Yamuna of Lakhwar MPP |
|
26. | 20/2023-24/EE(C-M)Vyasi Project | 09-02-2024 | 15-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Levelling of land & Demarcation of plots at Village Dhaira Khadar,Kalsi Distt. Dehradun for Rehabilitation of Vyasi HEP affected village Lohari |
Time Extn. 1
Time Extn. 2
Time Extn. 3
|
27. | 02/EE(Quality)/LMP/2023-24 | 19-03-2024 | 13-04-2024 | Dehradun | Office of the Executive Engineer (Quality), Lakhwar Project, Dakpathar, Dehradun | Executive Engineer | Construction of 04 nos. C-Type residences for Lakhwar Project at Dakpathar, Dehradun |
|
28. | 01/EE(Quality)/LMP/2023-24 | 18-03-2024 | 12-04-2024 | Dehradun | Office of the Executive Engineer (Quality), Lakhwar Project, Dakpathar, Dehradun | Executive Engineer | Construction of 04 nos. B-Type residences for Lakhwar Project at Dakpathar, Dehradun |
|
29. | 26/EE-II (E&M)/LP/2023-24 | 13-03-2024 | 12-04-2024 | Dakpathar | Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar | Executive Engineer-II | Supply of Lighting and wiring materials for M&R of Lakhwar offices, field hostel, officer club & residential quarters of Lakhwar project at Dakpathar, Distt Dehradun. |
|
30. | 28/EE-II (E&M-LWR)/LP/2023-24 | 13-03-2024 | 12-04-2024 | Dakpathar | Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar | Executive Engineer-II | Repairing, Maintenance & fencing work of 33/11 kV Substation Hathiyari, under Lakhwar MPP. |
Download Tender |
31. | 26/EE-II (E&M)/LP/2023-24 | 13-03-2024 | 12-04-2024 | Dakpathar | Office of the Executive Engineer-II (E&M), Lakhwar Project, Dakpathar | Executive Engineer-II | Supply of Lighting and wiring materials for M&R of Lakhwar offices, field hostel, officer club & residential quarters of Lakhwar project at Dakpathar, Distt Dehradun. |
|
32. | e-04/UJVNL/IT/EE(EM-II)/2023-24 | 16-03-2024 | 10-04-2024 | Dehradun | Office of the Executive Engineer (E&M-II), IT, “UJJWAL”, Maharani Bagh, GMS Road, Dehradun | Executive Engineer | Supply, installation, testing & commissioning of Advance Training System in Training Hall, UJVN Limited, “Ujjwal”, GMS Road, Dehradun |
|
33. | CH(Maint.)- 40/2023-24 | 20-03-2024 | 10-04-2024 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Overhauling of TGB assembly (Including one set supply of T.G.B pads) of 60 MW Chibro Turbine |
Download Tender |
34. | 48/EE(Pathri)/2023-24 | 20-03-2024 | 10-04-2024 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Design, Manufacturing, Supply, Erection, Testing & Commissioning of one no. Hydraulically Operated Trash Rack Cleaning Machine at Pathri Power House |
|
35. | 25 /EE(C&M)/MB-II/Joshiyara/2023-24 | 13-03-2024 | 10-04-2024 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer | Reconstruction of Damaged Road from Police Line Gyansu to Darbar band at right bank of Joshiyara Barrage MB-II Reservoir, Uttarkashi. |
|
36. | 18/EE(Civil-I)/LMP/2023-24 | 16-03-2024 | 08-04-2024 | Dehradun | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer | Construction of Transit camp at Lakhwar SubStation Kandriyan |
|
37. | 17/EE(Civil-I)/LMP/2023-24 | 16-03-2024 | 08-04-2024 | Dehradun | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer | Repair and maintenance of Sub-Station Building and protection of switchyard at Kandriyan. |
|
38. | 29/EE(G)/CPH/2023-24 | 16-03-2024 | 08-04-2024 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Annual contract for cleaning, & up keeping of switchyard and Chibro Power House complex |
Download Tender |
39. | NCB/10/EE (E&M)/Asan Barrage/ 2023-24 | 07-03-2024 | 08-04-2024 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun | Executive Engineer | Repair & Overhauling of hoisting arrangement of Barrage gates (1 to 14) of Asan Barrage |
|
40. | NCB/09/EE (E&M)/Asan Barrage/ 2023-24 | 07-03-2024 | 08-04-2024 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun | Executive Engineer | Repairing and Major Overhauling of Head Regulator (HR) gates (1 to 5) at Asan Barrage |
|
41. | 26/EE(Gen)/Khodri/2023-24 | 15-03-2024 | 06-04-2024 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun), | Executive Engineer | Supply, Erection, Testing and Commissioning of Collector Assy. 1219 mm diameter (48” slip Ring Assembly) of 31 MVA of Generator of unit no. 3 at Khodri Power Station |
Download Tender |
42. | 25/EE(Gen)/Khodri/2023-24 | 15-03-2024 | 06-04-2024 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Procurement of Electrical Consumable items at Khodri Power Station |
|
43. | 28/2023-24/EE(C-M)Vyasi Project | 15-03-2024 | 06-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Balance Slope Protection Work near Potheadyard and Balance Shotcreting work in Backslope at Hathiyari Power House, Vyasi HEP (120MW), Dehradun |
|
44. | 27/2023-24/EE(C-M)Vyasi Project | 15-03-2024 | 06-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Landscaping & protection work on the right bank of river Yamuna at Vyasi HEP dam site at Juddo, Distt. Dehradun |
|
45. | 21/EE(C-M)/DDN/2023-24 | 21-02-2024 | 06-04-2024 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | Comprehensive annual maintenance contract (CAMC) of 03 Nos. Kone Make lifts installed at the New Corporate Office Building G.M.S. Road, Ujjwal Dehradun |
Time Extn. 1
Download Tender |
46. | 26/2023-24/EE(C-M)Vyasi | 14-03-2024 | 05-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Annual Repair and maintenance of residences allotted to officers/employees of Vyasi HEP at Dakpathar, Dehradun |
|
47. | 25/2023-24/EE(C-M)Vyasi | 14-03-2024 | 05-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Annual Repair and maintenance of Vyasi Dam & Allied structures of Vyasi Project at Juddo (Dehradun) |
|
48. | 24/2023-24/EE(C-M)Vyasi | 14-03-2024 | 05-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Annual Maintenance and Repair of Power House and allied structures of Vyasi HEP (2X60MW) at Hathiyari, Dehradun |
|
49. | 31/2023-24/EE(C)/Pashulok Barrage | 15-03-2024 | 04-04-2024 | Rishikesh | For and on behalf of UJVN Ltd, Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | Construction of Approach Road at Divine College of Nursing & Paramedical Sciences, Shyampur Kangri, Haridwar under CSR |
Download Tender |
50. | 16/EE(Test)/DKP/2023-24 | 15-03-2024 | 04-04-2024 | Dakpathar | Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar | Executive Engineer | Miscellaneous works and supply of items. |
Download Tender |
51. | 11/EE(E&M)/AB/2023-24 | 14-03-2024 | 04-04-2024 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun | Executive Engineer | AMC of barrage control & monitoring systems |
Download Tender |
52. | 73/EE(M)/MB-II/23-24 | 13-03-2024 | 04-04-2024 | Uttarkashi | The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of Turbine Shaft Rubber Seal for 76MW Turbine at Dharasu Power House MB-II, Chinyalisaur |
|
53. | 72/EE(M)/MB-II/23-24 | 13-03-2024 | 04-04-2024 | Uttarkashi | The office of Executive Engineer (Maintenance), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of consumable items at Dharasu Power House, MB-II Chinyalisaur |
|
54. | e-T.No.10/EE(Test)/DKN/2023-24 | 05-03-2024 | 04-04-2024 | Dhakrani | Office of the Executive Engineer (Test), Dhakrani | Executive Engineer | Design, Engineering, Manufacturing, Fabrication, Assembly, Supply, Installation, Testing and commissioning of pre-wired complete Numerical relay panels for Generator, Generator Transformer and unit Auxiliary Transformer protection after dismantling of existing panels at Kulhal Powerhouse |
|
55. | 17/EE(E&M)/Vyasi Dam/2023-24 | 27-02-2024 | 04-04-2024 | Dakpathar | Office of the Executive Engineer (E&M), Vaysi Dam, Juddo Dakpathar, UJVN Ltd | Executive Engineer | Supply of T&P Items at Vyasi Dam, Juddo, Dehradun |
Corrigendum 1
Time Extn. 1
|
56. | 28/UJVNL/EE(M&G)/KPS/2023-24 | 13-03-2024 | 03-04-2024 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulha | Executive Engineer | Installation of one No. new Bore well with all necessary supply at Intake of Kulhal Power station |
Download Tender |
57. | 35/EE(M&G)/MPH/2023-24 | 14-03-2024 | 03-04-2024 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Hiring of One non AC Vehicle for School going Children and Power house work at Mohammadpur Power House for one year. |
|
58. | 24/EE(Gen)/Khodri/2023-24 | 12-03-2024 | 03-04-2024 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer | Fabrication of Iron Ramps & Iron trench covers of various sizes at Khodri Power Station, Khodri.. |
Download Tender |
59. | 19/EE(G)/2023-24 | 13-03-2024 | 02-04-2024 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | Flushing of Strainers and Flushing of Filtration Plant of Chilla Power House |
Download Tender |
60. | 18/EE(G)/2023-24 | 13-03-2024 | 02-04-2024 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer | Supply and Fixing of Gear based easy movable mechanism system of store gate of electrical section store at Chilla Power House |
Download Tender |
61. | 16/EE(Civil-I)/LMP/2023-24 | 11-03-2024 | 02-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun), | Executive Engineer | Supply and Installation of Portable Office cabin/container of size 20’ x 10’ x 8.5’ (Lift & Shift type) at Lakhwar Multi-Purpose project in District Dehradun/Tehri Garhwal. |
|
62. | 15/EE(Civil-I)/LMP/2023-24 | 11-03-2024 | 02-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun), | Executive Engineer | Repair and maintenance of Sub-Station Building and premises at Hathiyari. |
|
63. | 40/EE/PCM/Dhalipur/ 2023-24 | 12-03-2024 | 02-04-2024 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of old M&U office Building Dhalipurat Dhalipur Dehradun |
Download Tender |
64. | 50/EEM&G)DKN/2023-24 | 07-03-2024 | 02-04-2024 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | Refurbishment of Metering & protection of 132 Bus |
Download Tender |
65. | 23/2023-24/EE(C-M)Vyasi Project, | 11-03-2024 | 02-04-2024 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer | Construction of Office Building for Executive Engineer (E&M), Vyasi Dam at Juddo, Dehradun |
|
66. | 38/EE/PCM/Dhalipur/ 2023-24 | 26-02-2024 | 02-04-2024 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Protection work of Tail Race Channel (Asan River side) of Dhalipur Power House at Dhalipur, Dehradun |
Time Extn. 1
|
67. | 35/EE(M)/VP/2023-24 | 05-03-2024 | 01-04-2024 | Dakpathar | Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar | Executive Engineer | Fabrication and fixing of shed over HVAC pump motor set and over HVAC duct cut out on the roof of Vyasi HEP at Hathiyari |
Download Tender |
68. | 34/EE(M)/VP/2023-24 | 05-03-2024 | 01-04-2024 | Dakpathar | Office of the Executive Engineer(Maint.), Vyasi Project, Dakpathar | Executive Engineer | Annual maintenance of Fire Hydrant System of Vyasi HEP at Hathiyari |
Download Tender |
69. | 16/EE(E&M)/Vyasi Dam/2023-24 | 19-02-2024 | 01-04-2024 | Dakpathar | Office of the Executive Engineer (E&M), Vaysi Dam, Juddo Dakpathar, UJVN Ltd. | Executive Engineer | SITC of High Mast lighting and Street Lighting system at Vyasi Dam, Juddo Dehradun |
Time Extn. 1
Corrigendum 1
Corrigendum 2
|
70. | 41/EE (GEN)/MB-II/2023-24 | 08-03-2024 | 30-03-2024 | Uttarkashi | The office of Executive Engineer (Generation), ManeriBhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | SITC of 15 Nos. Capacitive Voltage Transformer including interfacing with existing control, protection and metering scheme and dismantling of existing Capacitive Voltage Transformer installed at 220 kV switchyard of Dharasu Power House |
|
71. | 07/EE(Gen)/Klg/2023-24 | 08-03-2024 | 28-03-2024 | Pauri Garhwal | Office of Executive Engineer (Generation) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Procurement of Consumables. |
|
72. | 19/EE(E&M)/Vyasi Dam/2023-24 | 06-03-2024 | 28-03-2024 | Dakpathar | Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd | Executive Engineer | Work of electrification at new office building of EE(E&M) Near View Point at Vyasi Dam, Juddo Dehradun |
|
73. | 18/EE(E&M)/Vyasi Dam/2023-24 | 06-03-2024 | 28-03-2024 | Dakpathar | Office of the Executive Engineer (E&M ), Vaysi Dam, Juddo Dakpathar | Executive Engineer | SITC of CCTV Camera system at Vyasi Dam, Juddo, Dakpathar, Dehradun |
|
74. | T-47/EEM/2023-24 | 15-03-2024 | 27-03-2024 | Pauri- Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Repair and Painting work of Trash Rack at Chilla Power House |
|
75. | 15/EE(Test)/DKP/2023-24 | 04-03-2024 | 27-03-2024 | Dakpathar | Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar | Executive Engineer | Calibration and certification of Various Testing Instruments & Equipment’s of Chibro and Khodri Power House and Ichari Dam. |
|
76. | PDD-18/2023-24 | 05-03-2024 | 26-03-2024 | Dakpathar | Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Executive Engineer | Dismantling of damaged local communication telephone line at Dakpathar colony. |
|
77. | 17/EE(Generation)/Vyasi/2023-24 | 04-03-2024 | 26-03-2024 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer | Supply and fixing of Sign boards, display board and other works at Vyasi HEP |
|
78. | CH(Maint.)- 39/2023-24 | 05-03-2024 | 26-03-2024 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Supply, Installation, Testing and Commissioning of 10Ton Electric Wire Rope Hoist (Crane) remote operated with Cross Travel at Central Store, Chibro Power Station, Dakpathar. |
|
79. | 04/EE(E/M)/ Arakot Tiuni & Tiuni Plasu /2023-24 | 04-03-2024 | 26-03-2024 | Tiuni Plasu | Office of Executive Engineer (E/M), Arakot Tiuni & Tiuni Plasu | Executive Engineer | Supply, Installation, Testing & Commissioning of 125 KVA, 415V (CPCB-IV Plus approved) Silent Diesel Generator (DG) set at the Project Office of ArakotTiuni & Tiuni-Plasu Projects, Dakpathar |
|
80. | e-28/EE(Gen)/Khodri/2021-22 | 10-01-2022 | 05-03-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Procurement of DC excitation cable. |
Corrigendum 1
Corrigendum 2
Corrigendum 3
Cancellation Notice
|