
S.No | Click Here To Download NIT | Uploading Date | Closing Date | Circle | Address | Classification | Description | Corrigendum / Downloads |
---|---|---|---|---|---|---|---|---|
1. | 05/EE(Pathri)/2023-24 | 13-05-2023 | 03-06-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Annual Contract for operation & maintenance of 500 KWp Solar PV Plant Pathri. |
|
2. | 04/EE(M)/RPSK/2023-24 | 13-05-2023 | 03-06-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Hiring of diving services |
|
3. | NIT-14/EE(M)/MB-II/23-24 | 13-05-2023 | 03-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Re-filling of Fire Extinguisher at Central store at Dharasu Power House |
|
4. | NIT-13/EE (M)/MB-II/2023-24 | 13-05-2023 | 03-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual Cleaning of Grass, bushes and rearrangement of materials in central store area at Dharasu Power house |
|
5. | 04/EE/PCM-DKP/TN/2023-24 | 12-05-2023 | 03-06-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Sweeping, cleaning & upkeep works of Vidyut Bhawan, Project Distribution Division Office & Project Civil Maintenance-Dakpathar Office at Dakpathar, Dehradun. |
|
6. | 06/EE(Gen)/MB-II/2023-24 | 11-05-2023 | 03-06-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Generation) | Re-filling of different type and capacity of Fire extinguisher & Nitrogen cylinder at MB-II, Dharasu Power House. |
|
7. | 05/EE (GEN)/MB-II/2023-24 | 29-04-2023 | 03-06-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Supply, installation, testing & commissioning of 1010 KVA, DG set along with synchronizing panel at MB-II Dharasu Power house. |
|
8. | 04/EE(E&M)/MB-II/Barrage/2023-24 | 27-04-2023 | 03-06-2023 | Joshiyara | Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage | Executive Engineer | Annual Routine Maintenance of Electro Mechanical and Hydro Mechanical Equipment’s of barrage including sweeping and cleaning for the year 2023-24 |
|
9. | 04/EE(Gen)/Khodri/2022-23 | 12-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Supply and Replacement of different types of valves of cooling lines of Khodri Power Station |
|
10. | 03/EE(Gen)/Khodri/2022-23 | 12-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Extension of CCTV system to surge tank area at Khodri Power Station. |
|
11. | 02/EE(Gen)/Khodri/2022-23 | 12-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Supply and Installation of Air filter Assembly for Exciter of 30 MW Generator. |
|
12. | 01/EE(Gen)/Khodri/2022-23 | 12-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Providing of Additional Power Supply to Hydrant System at Khodri Power Station. |
|
13. | 04/EE (Maint)/VP/2023-24 | 13-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun, UJVN Ltd | Executive Engineer (Maint. ) | Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for the office of Dy.GM (O&M), Vyasi Project, Dakpathar for one year period |
|
14. | 03/EE (Maint)/VP/2023-24 | 13-05-2023 | 02-06-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun, UJVN Ltd | Executive Engineer (Maint. ) | Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for Executive Engineer Generation, Vyasi HEP, Hathiyari, Dehradun for one year period |
|
15. | 03/EE/PCM-DKP/TN/2023-24 | 11-05-2023 | 01-06-2023 | Dehradun | Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Door to Door collection of Garbage and sweeping, cleaning and upkeep works of Hydel Colony, Old Yamuna Colony, New Yamuna Colony, main road from Dakpathar Tiraha to New Yamuna Colony and by pass road from Tikona Park to main gate of Play Ground near Barrage at Dakpathar, Dehradun |
|
16. | 02/EE/PCM-DKP/TN/2023-24 | 11-05-2023 | 01-06-2023 | Dehradun | Office of the Executive Engineer, Project Civil Maintenance- Dakpathar, UJVN Ltd., Dakpathar (Dehradun) | Executive Engineer | Door to Door collection of Garbage and sweeping, cleaning and upkeep works of Tons Colony, Gole Market Colony, Colony Behind Post Office and main road from Dakpathar Bus Station to main gate of play ground near Barrage via Nehru Market and GMVN at Dakpathar, Dehradun. |
|
17. | 12/EE(M)/MB-II/23-24 | 11-05-2023 | 01-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of Special Jack and Puller Assembly for Lower Bush Housing at Dharasu Power House, MB-II Uttarkashi. |
|
18. | 11/EE(M)/MB-II/23-24 | 11-05-2023 | 01-06-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of gun metal bush for Turbine at Dharasu Power House, Uttarkashi |
|
19. | 04/EE(Pathri)/2022-23 | 09-05-2023 | 31-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | AMC of CCTV Camera System installed at various places such as in & around side of Andritz Store, Pathri Power House & 500KWp Solar PV Plant, Pathri and Supply, Installation, Testing & Commissioning of 02 nos. CCTV Cameras system in Pathri Power House |
|
20. | 02-EE-Test-Dkp-2023-24 | 10-05-2023 | 31-05-2023 | Dakpathar | Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar | Executive Engineer (Test) | Internet lease line (1:1) for Chibro PH, Khodri PH, Ichari Dam, Dakpathar Barrage and Vidyut Bhawan offices |
Corrigendum 1
|
21. | 01-EE-Test-Dkp-2023-24 | 10-05-2023 | 31-05-2023 | Dakpathar | Office of the Executive Engineer (Test), Vidyut Bhawan, Dakpathar | Executive Engineer (Test) | Hiring of Diesel vehicle with driver for a period of one year |
|
22. | 01/UJVNL/EE (M&G)/KPS/2023-24 | 08-05-2023 | 31-05-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer | Annual Maintenance Contracts (AMC) for Colony Maintenance work (Elec/Mech) at Kulhal Power Station |
|
23. | 01/Manager(A&S)/2023-24 | 08-05-2023 | 30-05-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager (A&S) | Supply, Installation, Testing and Commissioning of 01 No. 750 KVA DG set along with AMF panel at New Office Building, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun |
|
24. | 01/EE (E&M) /DKP BRG/2023-24 | 04-05-2023 | 29-05-2023 | Dakpathar | Dakpathar | Executive Engineer | Hiring of one number non-AC Diesel vehicle (Mahindra Bolero Plus or equivalent) along with driver for Dakpathar Barrage, Dakpathar, Dehradun (excluding the cost of fuel) on contract basis for one year. |
|
25. | 02/EE(G)/2023-24 | 08-05-2023 | 29-05-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Refilling of Fire Extinguishers at Chilla Power House. |
|
26. | 01/EE(G)/2023-24 | 08-05-2023 | 29-05-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Annual maintenance contract (AMC) for computers, printers at Chilla Power House. |
|
27. | 05/EE(M&G)/MPH/2023-24 | 08-05-2023 | 29-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Hiring of one Non AC 7(6+1) seater vehicle for EE(M&G) Office & driver for new purchased ambulance for one year |
|
28. | NIT-02/EE(M)/VP/23-24 | 09-05-2023 | 29-05-2023 | Hathiyari | The office of Executive Engineer (Maint.), Vyasi Project Hathiyari | Executive Engineer (Maint.) | Supply of various submersible pump with accessories for vyasi HEP, Hathiyari |
|
29. | CH(Maint.)– 05/2023-24 | 08-05-2023 | 29-05-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Supply of Self Lubricating Guide vane Bushes (Top, Middle) and lip seal of 60 MW Machines at Chibro Power Station. |
|
30. | 02/EE(Civil)/Lohiahead/Khatima/2023-24. | 08-05-2023 | 29-05-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer | Repair and Protection work of right bank of TRC of Sharda Power House, Lohiahead, (Khatima) |
|
31. | 01/EE(Civil-SHP)/Dharchula/2023-24 | 04-05-2023 | 27-05-2023 | Dharchula | Office of the Executive Engineer (Civil-SHP), Dharchula | Executive Engineer (Civil-SHP) | Hiring of one number diesel driven small vehicle (M&M Bolero or equivalent, non AC) for 12 months along with driver for the office of EE (Civil-SHP), Dharchula |
|
32. | 02/EE(E&M)(SHP)/Rishikesh/2023-24 | 28-04-2023 | 27-05-2023 | Rishikesh | Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Rishikesh, | Executive Engineer | Design, Reverse Engineering, Manufacturing, Supply, Transportation and Repair of Turbine Runner and associated Items of Urgam SHP (2x1500kW) in District Chamoli, Uttarakhand . |
|
33. | 02/EE(E&M-SHP)/Kaliganga-II/2023-24 | 29-04-2023 | 26-05-2023 | Guptkashi | Office of the Executive Engineer (E&M) SHP, UJVN Ltd., Guptkashi | Executive Engineer (E&M) SHP | Annual Operation and Maintenance of Kaliganga-II SHP (2x2.25 MW+15% COL), located in Tehsil Ukhimath District-Rudraprayag |
|
34. | 09/EE(Gen)/Klg/2022-23 | 22-11-2022 | 26-05-2023 | Kalagarh | Executive Engineer (Generation) | Electrical and Mechanical | Design, Engineering, Manufacturing, Supply, Installation, Testing & commissioning of Stator Core, Winding & Re-insulation of Rotor Poles with Class F insulation of Unit # 1 of Ramganga Power Station, Kalagarh. |
|
35. | 01/2023-24/EE(C-M)Vyasi Project | 11-05-2023 | 25-05-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Construction of Storm drain at Bench at El. ± 562.50m above Pothead yard area of Hathiyari Power House of Vyasi HEP |
|
36. | 01/EE(Test)/DKN/2023-24 | 04-05-2023 | 25-05-2023 | Dhakrani | Office of the Executive Engineer (Test), Dhakrani | Executive Engineer (Test) | Retrofitting of Alarm &Annunciation panels with auxiliary relays for all 03 units at Kulhal Powerhouse |
|
37. | 02/EE(C&M)/MB-II/Joshiyara/2023-24 | 03-05-2023 | 25-05-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer (C&M) | Development of Park at right bank of Joshiyara Barrage , MB-II , Uttarkashi |
|
38. | 02/EE(E&M)/Vyasi Dam/2023-24 | 03-05-2023 | 25-05-2023 | Dakpathar | Office of the Executive Engineer (E&M ), Vaysi Dam, Juddo Dakpathar, UJVN Ltd | Executive Engineer (E&M ) | Fabrication of M.S Platform (Chemically coated) for inspection and maintenance of trunnion bracket assembly of orifice radial gates of Vyasi Dam at Juddo, Dehradun |
|
39. | 01/EE(E&M)/Vyasi Dam/2023-24 | 03-05-2023 | 24-05-2023 | Dakpathar | Office of the Executive Engineer (E&M), Vyasi Dam, Juddo, Dakpathar UJVN Ltd | Executive Engineer (E&M) | Shifting of TRCM trash from Dam site to the Dump yard site at Juddo, Dakpathar, District Dehradun |
|
40. | 07/EE(M)/MB-II/23-24 | 26-04-2023 | 24-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Maintenance for HydroMechanical and Electro-Mechanical works of Dharasu Power House for the period of 06 months |
|
41. | 01/EE(Test)/GV/2023-24 | 08-05-2023 | 23-05-2023 | Haridwar | Office of the Executive Engineer (Test), UJVNL, Ganga Valley, Haridwar | Executive Engineer (Test) | Hiring of diesel vehicle with driver for 1 year |
|
42. | 02/EE(Maint.)/Khodri/2023-24 | 02-05-2023 | 23-05-2023 | Dehradun | Dehradun | Executive Engineer | Cleaning & up-keeping of duplex strainer buckets system and other miscellaneous works during monsoon season at Khodri Power Station |
|
43. | 3/EE(M&G)/MPH/2023-24 | 03-05-2023 | 23-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer, (M&G) | Testing & Fault rectification work on 66kv switchyard equipment including procurement of 66kv spares at MPH |
|
44. | 2/EE(M&G)/MPH/2023-24 | 03-05-2023 | 23-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer, (M&G) | Providing, fixing & installation of switchyard electric fencing at MPH |
|
45. | 1/EE(M&G)/MPH/2023-24 | 03-05-2023 | 23-05-2023 | Hardwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer, (M&G) | Supply of Switchgear spares at MPH |
Corrigendum 1
|
46. | 02/EE(M)/2023-24 | 02-05-2023 | 23-05-2023 | Uttarkashi | Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi | Executive Engineer (M) | Procurement of un-armored cable for Tiloth Power House |
Corrigendum 1
|
47. | 03/EE (E&M-II)/LP/2023-24 | 08-05-2023 | 22-05-2023 | Dakpathar | Office of the Executive Engineer-II (EM-LWR),Lakhwar MPP, Dakpathar, UJVN Ltd. | Executive Engineer-II (EM-LWR) | Repairing and Overhauling of 33/11kV, 5MVA & 1.5MVA Transformers and 11kV VCB Panels at Lakhwar Substation |
|
48. | 01/EE(M)/2023-24 | 01-05-2023 | 22-05-2023 | Uttarkashi | Office of the Executive Engineer (M) Tiloth Power House, Uttarkashi | Executive Engineer | Hiring of 1 no. non AC diesel vehicle and 1 no. utility diesel vehicle for power house. |
|
49. | 03/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 29-04-2023 | 22-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual Maintenance of Water Supply System for residential and non residential buildings of Shaktipruam colony, Chinyalisaur, Uttarkashi. |
|
50. | 01/EE(E&M)/MB-II/Barrage/2023-24 | 11-04-2023 | 22-05-2023 | Uttarkashi | Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer (E&M) | Annual cleaning of trash rack through Diving Team at Joshiyara Barrage, Uttarkashi for the period of one year |
|
51. | 03 /EE(C&M)/MB-II/ Joshiyara/2023-24 | 12-05-2023 | 20-05-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II, Joshiyara, Uttarkashi | Executive Engineer (C&M) | Surveying work of Barrage reservoir and project area of Joshiyara Barrage, MB-II, Uttarkashi |
|
52. | 03/EE(Pathri)/2023-24 | 06-05-2023 | 20-05-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Haridwar | Executive Engineer | Hiring of one no. 7 (6+1) seater Non AC diesel vehicle (along with driver’s services) for official use of Executive Engineer (M&G), Pathri Power House & one no. driver for running of departmental ambulance for a period of one year. |
|
53. | 02/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 29-04-2023 | 20-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual sweeping and cleaning work of ShaktipuramColony,MB-II, Chinyalisaur. |
|
54. | 01/ EE(Civil) / MB-II / Chinyalisaur / 2023-24 | 29-04-2023 | 20-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual Civil Maintenance of Dharashu Power House Complex at Dharashu, Uttarkashi. |
|
55. | 03/EE (GEN)/MB-II/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | CLEANING IN 220 KV SWITCHYARD AND OTHER ASSOCIATED WORKS AT DHARASU POWER HOUSE. |
|
56. | 04/EE (GEN)/MB-II/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Painting of Various Electrical Equipment, Panels and Staircase at MB-II, Dharasu Power House. |
|
57. | 02/EE (GEN)/MB-II/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Painting of earthing strip, support structure (towers, gantry and beam), street poles & concrete slabs of cable gallery and other associated work at 220 kV switchyard, MB-II, Dharasu Power House. |
|
58. | 01/EE (GEN)/MB-II/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | General Cleaning work at MB-II, Dharasu Power House. |
|
59. | 03/EE(Civil)/SHP/Maneri/2023-24 | 27-04-2023 | 20-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil) SHP, Maneri, Uttarkashi | Executive Engineer (Civil) SHP | Annual repair & maintenance work of Pilangad (2x1125 KW) SHP in Bhatwari, Distt-Uttarkashi. |
|
60. | 05/EE(E&M)/MB-II/Barrage/2023-24 | 27-04-2023 | 19-05-2023 | Joshiyara | Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage | Executive Engineer | Procurement of Electrical items for Joshiyara barrage colony, Uttarkashi |
|
61. | 01/EE/PCM/Dhalipur/ 2023-24 | 27-04-2023 | 18-05-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Annual M&R works of Office Building at Dhalipur for the year of 2023-24 |
|
62. | 01/EE(Civil)/Lohiahead/Khatima/2023-24 | 26-04-2023 | 18-05-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer (Civil) | Providing & Fixing of Chain Link Fencing from C-16 to RT Bank of TRC Nigam Premises near Temple, at Sharda Power House, Lohiahead, Khatima |
|
63. | 01/EE(E&M)/LP/2023-24 | 17-04-2023 | 18-05-2023 | Dehradun | Office of the Executive Engineer (E&M-II), Lakhwar MPP(3x100MW) Dakpathar, Dehradun | Executive Engineer (E&M-II) | Works of Revamping & Refurbishment of 33/11 kV Lakhwar Substation. Kaldriyan, Tehsil Nain Bagh Tehri Garhwal. |
Corrigendum 1
|
64. | 02/EEM/2023-24 | 03-05-2023 | 17-05-2023 | Chilla | The office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer (M) | Supply and Application of Coating Material over the upper and lower ring wall surfaces of stay ring of Unit #2 of Power House |
|
65. | NIT-09/EE(M)/MBII/23-24 | 26-04-2023 | 17-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repairing of Bowl Assembly of 150HP dewatering pump and other work at Dharasu Power House, M.B.-II, Uttarkashi |
|
66. | NIT-08/EE (M)/MB-II/2023-24 | 26-04-2023 | 17-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repairing of Guide vane leaver assembly at Dharasu Power House |
|
67. | 10/EE(M)/MB-II/23-24 | 26-04-2023 | 17-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of Drainage Pump Spares at Dharasu Power House, MB-II, Uttarkashi |
|
68. | NIT-02/EE(Gen)/Vyasi/23-24 | 25-04-2023 | 17-05-2023 | Dakpathar | he office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer | Annual General Cleaning of 2x60 MW Vyasi Power House at Hathiyari, Dehradun |
|
69. | 01/EE(Pathri)/2023-24 | 25-04-2023 | 17-05-2023 | Haridwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | O&M works of Cooling Water System of Pathri Power House during monsoon period. |
|
70. | PDD-01/2023-24 | 26-04-2023 | 16-05-2023 | Dehradun | Office of the Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Executive Engineer | Supply & Replacement of damaged electrical poles at Dakpathar colony |
|
71. | 02/EE(CM)/DDN/2023-24 | 25-04-2023 | 16-05-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | Construction of overhead water tank along with water purifier and hand washing station at Govt. Primary School, Shastri Nagar, Dehradun. |
|
72. | 01/EE (E&M)/(SHP)/Rishikesh/2023-24 | 13-04-2023 | 16-05-2023 | Rishikesh | The office of the Executive Engineer (E&M-SHP), UJVN Limited, Rishikesh | Executive Engineer | Annual Operation and Maintenance for RPN SHP (2x750kW) Dunao, in District- Pauri Garhwal, Uttarakhand |
|
73. | CH(Maint.)- 04/2023-24 | 22-04-2023 | 15-05-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | Repair & Maintenance work of clean water Supply System at Chibro Power Station |
|
74. | 01/EE (E&M-SHP)/KG-II/2023-24 | 21-04-2023 | 13-05-2023 | GUPTKASHI | Office of Executive Engineer (E&M-SHP), UJVN Limited, GUPTKASHI | Executive Engineer (E&M-SHP) | “Hiring of One no. Light Diesel Commercial vehicle Non-AC (M&M Bolero or equivalent) on rent basis along with driver for D.G.M. (E&M-SHP) Srikot, Srinagar, Garhwal for one year |
|
75. | 01/EE (Civil-III)/LMP/2023-24 | 14-04-2023 | 12-05-2023 | Dakpathar | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (Distt-Dehradun) | Executive Engineer | Supply, erection and design of 85.4 meter span Bailey Suspension Bridge, 24R load class, carriage road width 3.277 m (excluding of Civil works) at River Yamuna at Lakhwar Dam Site Distt. Dehradun |
|
76. | NCB/01/EE(E&M)/PB/2023-24 | 10-04-2023 | 12-05-2023 | Rishikesh | The office of Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer (E&M) | Strengthening of Barrage gates with application of Zinc rich chemical compound at Virbhadra Barrage under DRIP-II. |
|
77. | 2e/EE(G)/CPH/2023-24 | 20-04-2023 | 11-05-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer (Generation) | Annual Contract for miscellaneous work of lighting system, operation and maintenance at Chibro Power House |
|
78. | 01/EE(Maint.)/Khodri/2023-24 | 18-04-2023 | 11-05-2023 | Dehradun | Office of Executive Engineer (Maint.), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | Modification of opening arrangement of Main Inlet Valve (MIV) ofunit no 2,3,4 of Khodri Power House. |
|
79. | 01/EE(CM)/DDN/2023-24 | 19-04-2023 | 10-05-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer | Housekeeping Service for New Corporate Office Building, UJVN Ltd., Ujjwal, Maharani Bagh, G.M.S. Road, Dehradun |
|
80. | 01/SPH/2023-24 | 18-04-2023 | 09-05-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Supply, Installation, Testing & Commissioning of 220 VDC, 250AH and 220 VDC 440AH VRLA Battery Bank at Sharda Power House, Lohiahead, Khatima, (Uttarakhand) |
|
81. | CH (Maint.)- 03/2023-24 | 17-04-2023 | 09-05-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Operation and routine servicing of 50t outlet structure crane during monsoon period at Chibro Power Station |
|
82. | CH (Maint.)- 02/2023-24 | 17-04-2023 | 09-05-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Fixing of Pump at Stage II gallery and Miscellaneous Pipe Line work at Chibro Power Station |
|
83. | CH (Maint.)- 01/2023-24 | 17-04-2023 | 09-05-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer | Repairing of wiring and fixing of lights at miscellaneous site of Chibro Power Station |
|
84. | 01/EE(Civil)/SHP/Maneri/2023-24 | 13-04-2023 | 09-05-2023 | Uttarkashi | Office of the Executive Engineer (Civil) SHP, Maneri, Uttarkashi | Executive Engineer | Construction of Approch Path from near Pilangad Power House to Forebay tank and other associated work of Power House (2x1125 KW) at Bhatwari Distt- Uttarkashi |
Corrigendum 1
|
85. | 01/EE(G)/CPH/2023-24 | 16-04-2023 | 08-05-2023 | Chibro | Office of the Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer (Generation) | Annual contract for cleaning, & up keeping of switchyard and Chibro Power House complex . |
|
86. | 01/EE(Civil)/Kalagarh/Pauri Garhwal/2023-24 | 15-04-2023 | 08-05-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Treatment of Leakage in Penstock Gallery of Unit No. 02 & 03 at Ramganga House Kalagarh |
|
87. | 24/SPH/2022-23 | 31-03-2023 | 08-05-2023 | Khatima | Office of the Executive Engineer (M&G) | Executive Engineer (M&G) | Supply & installation of cable tray and repair & maintenance of clock tower at Sharda Power House Lohiahead |
Corrigendum 1
|
88. | 10/EE(E&M)/ ICHARI/TN/2022-23 | 31-03-2023 | 08-05-2023 | Dehradun | Office of the Executive Engineer (E&M), Ichari Dam, UJVN Ltd. Dakpathar (Dehradun) | Executive Engineer (E&M) | Providing & fixing of Main gate board and other sign board for Ichari Dam |
|
89. | 12/Manager(A&S)/2022-23 | 21-03-2023 | 08-05-2023 | Dehradun | Office of the Manager (A&S), UJJWAL, Maharani Bagh, Dehradun | Manager (A&S) | Hiring of vehicles along with driver for corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun |
|
90. | NIT- 03/EE(E&M)/MB-II/Barrage/2023-24 | 15-04-2023 | 06-05-2023 | Uttarkashi | The Office of the Executive Engineer (E&M), Joshiyara Barrage Joshiyara (Uttarkashi) | Executive Engineer | Epoxy Painting in sedimentation gallery of Joshiyara Barrage, Uttarkashi |
|
91. | 02/EE(E&M)/MB-II/Barrage/2023-24 | 15-05-2023 | 06-05-2023 | Joshiyara | Office of the (Executive Engineer (E&M),MB-II,Joshiyara Barrage | Executive Engineer | Procurements of T&P items at Joshiyara Barrage, MB-II, Uttarkashi |
|
92. | 01/EE(C&M)/MB-II/Joshiyara/2023-24 | 13-04-2023 | 06-05-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer (C&M) | Development of land and other associated civil works at the left bank of Joshiyara barrage reservoir,MB-II, near suspension bridge, Uttarkashi |
|
93. | 01/EE(Generation)/Vyasi/2023-24 | 06-04-2023 | 06-05-2023 | Dakpathar | Office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Supply Installation and Testing of Dielectric Epoxy Coating around Electric Panels at Vyasi HEP LT/HT Panels at Vyasi Power Station |
Corrigendum 1
|
94. | 03/EE(M)/RPSK/2023-24 | 13-04-2023 | 04-05-2023 | Kalagarh | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Repair and modification of water cooling system of Unit-1, 2 and 3 |
|
95. | 03/EE(M)/MB-II/23-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of Lower bush housings for 76 MW Turbines at Dharasu Power House, MB-II Uttarkashi |
|
96. | 01/EE(M)/MB-II/23-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Procurement of general spares for Turbines at Dharasu Power House, MB-II Uttarkashi |
|
97. | NIT- 06/EE (M)/MB-II/2023-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repairing of TGB Housings of 76 MW Turbines at Dharasu Power House, Uttarkashi |
|
98. | NIT- 05/EE (M)/MB-II/2023-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Re-filling of Fire Extinguisher at Central store at Dharasu Power House |
|
99. | NIT-04/EE(M)/MB-II/23-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Repair and Overhauling of One No E.O.T Crane of Capacity 15 Ton at Dharasu Power House, MB-II Uttarkashi. |
|
100. | NIT-02/EE (M)/MB-II/2023-24 | 13-04-2023 | 04-05-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | Annual Cleaning of Grass, bushes and rearrangement of materials in central store area at Dharasu Power house |
|
101. | 21/SPH/2022-23 | 14-03-2023 | 04-05-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | .Internet leased line service at Sharda Power House, Lohiahead for a period of one year. |
|
102. | 03/EEM&G)DKN/2023-24 | 11-04-2023 | 02-05-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | “Miscellaneous procurement for Power House, offices, training center and guest house |
|
103. | 02/EEM&G)DKN/2023-24 | 11-04-2023 | 02-05-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Procurement of Stationery |
|
104. | T-01/EEM/2023-24 | 06-04-2023 | 01-05-2023 | Garhwal | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Providing & Replacement of 500mm dia FLV Pipe Line of Unit No. 2 at Chilla Power House |
|
105. | T-58/EEM/2023-24 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla | Executive Engineer | Procurement of Globe valves at Chilla Power House |
|
106. | T-57/EEM/2023-24 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla | Executive Engineer | Hiring of Light diesel vehicle non AC (Mahindra &Bolero or equivalent) with driver for a period of 12 months for EE (Generation) Chilla. |
|
107. | T-56/EEM/2022-23 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Repairing and overhauling work of water filtration plant of Power House |
|
108. | T-55/EEM/2022-23 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Thermal Insulation work in two units at Power House. |
|
109. | T-54/EEM/2022-23 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Supply of Cleaning Products and Gasket Sealant for Units of Power House |
|
110. | T-53/EEM/2022-23 | 31-03-2023 | 01-05-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Supply & fabrication of rotating shaft sleeve at Power House. |
|
111. | 01/EE (Civil-I)/Srikot/2023-24 | 05-04-2023 | 29-04-2023 | Rudraprayag | Office of the Executive Engineer (Civil-I), UJVN Limited, Guptkashi, Rudraprayag | Executive Engineer (Civil-I) | Providing & fixing Modular type kitchen and allied work at UJVNL Guest House buiding at Srikot Srinagar (Garhwal)” |
|
112. | 22/EE(Gen)/Khodri/2022-23 | 07-04-2023 | 29-04-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | V Dry Type 500 kVA Unit Auxiliary Transformer (UAT) and 11/0.415V Dry Type 800 kVA Station Auxiliary Transformer (SAT) |
|
113. | 52/EEM/2022-23 | 25-03-2023 | 29-04-2023 | Chilla | Office of the Executive Engineer (M), UJVN Ltd. Chilla | Executive Engineer (M) | Design, Engineering, Supply, Installation Testing & Commissioning of dredging Pump & Dredging System structure for Intake of Chila Power Station. |
Corrigendum 1
|
114. | 01/EE(M)/VP/2023-24 | 07-04-2023 | 27-04-2023 | Hathiyari | Office of the Executive Engineer (Maintenance), Vyasi Project, Hathiyar | Executive Engineer (Maintenance) | Annual maintenance contract of Drainage and Dewatering System of Vyasi HEP at Hathiyari |
|
115. | 01/EEM&G)DKN/2023-24 | 06-04-2023 | 27-04-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | “Annual Maintenance Contract (AMC) for Electrical Maintenance works of Dhakrani colony |
|
116. | 09/EE(E&M-SHP)/KG-II/2022-23 | 30-03-2023 | 27-04-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer (E&M-SHP) | Checking/Tightening of all nuts & bolts of towers, riveting/tack welding of bolts up to section A-A, replacement of damaged/punctured insulators of 33 kV transmission (IInd circuit) line from Kaliganga II SHP to Madhyamaheshwar SHP. |
|
117. | 10/EE(E&M-SHP)/KG-II/2022-23 | 30-03-2023 | 27-04-2023 | Guptkashi | Guptkashi | Executive Engineer | Hiring of One no. Light Diesel Commercial vehicle Non-AC (M&M Bolero or equivalent) on rent basis along with driver for D.G.M. (E&M-SHP) Srikot, Srinagar, Garhwal for one year |
Corrigendum 1
|
118. | 08/EE(E&M-SHP)/KG-II/2022-23 | 29-03-2023 | 27-04-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer (E&M-SHP) | Design and supply of Dummy plates/ bulk head gates for MIV & Draft tube at Kaliganga-II SHP (2x2.25 MW +15%COL) near village Kaviltha, tehsil Ukhimath in district Rudraprayag, Uttarakhand. |
|
119. | 19/EE(Civil-I)/LMP/2022-23 | 13-03-2023 | 27-04-2023 | Dehradun | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer (Civil-I) | Construction of chain-link fencing, security huts and other associated works of Lakhwar Multipurpose Project |
|
120. | 18/EE(Civil-I)/LMP/2022-23 | 13-03-2023 | 27-04-2023 | Dehradun | Office of the Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer (Civil-I) | Maintenance of project roads of Lakhwar Multipurpose Project |
|
121. | T-03/EE(Solar)/2022-23 | 03-02-2023 | 27-04-2023 | Dehradun | Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun | Executive Engineer | Setting up of 1.25 MW Ground Mounted/ Canal Bank Grid Connected Solar PV Plant near Pashulok Barrage, Rishikesh, District-Dehradun, Uttarakhand |
|
122. | T-02/EE(Solar)/2022-23 | 03-02-2023 | 27-04-2023 | Dehradun | Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun | Executive Engineer | Setting up of 6.25 MW Ground Mounted/ Canal Bank Grid Connected Solar PV Plant near Dhalipur Power House, Dhalipur, District- Dehradun, Uttarakhand |
|
123. | T-01/EE(Solar)/2022-23 | 03-02-2023 | 27-04-2023 | Dehradun | Office of the EE (Solar), “Ujjwal” Maharani Bagh, G.M.S Road, UJVN Ltd, Dehradun | Executive Engineer | Setting up of 9.5 MW Ground Mounted/ Canal Bank Grid Connected Solar PV Plant near Kulhal Power House, Kulhal, District-Dehradun, Uttarakhand |
Corrigendum 1
|
124. | 01/2023-24/EE(CD-II)/CDH&NP,UJVN Ltd Rishikesh | 01-04-2023 | 24-04-2023 | Dehradun | UJVN Limited, Executive Engineer (CD-II), CDH&NP, UJVN Ltd,Pashulok, Rishikesh, Dehradun | Executive Engineer (CD-II) | Supply/Procurement of MIDAS FEA-NX Software for UJVN Ltd Civil Design and Hydrology Office Rishikesh. |
|
125. | 25/SPH/2022-23 | 31-03-2023 | 24-04-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead | Executive Engineer (M&G) | ”Installation,Testing & Commissioning of 33KV feeder-4 at Sharda Power House,Lohiahead |
Corrigendum 1
|
126. | 12/EE(Civil)/Lohiahead/Khatima/2022-23 | 30-03-2023 | 24-04-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead, Khatima | Executive Engineer (Civil) | Repair and improvement of Sewerage System of Sharda Power House Colony, Lohiahead |
|
127. | 17/EE(G)/Klg/2022-23 | 31-03-2023 | 24-04-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | General Cleaning of Ramganga Power Station, Kalagarh for 12 months |
|
128. | 16/EE(G)/Klg/2022-23 | 31-03-2023 | 24-04-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | Annual Maintenance Contract for Routine Maintenance Activities |
|
129. | 15/EE(G)/Klg/2022-23 | 31-03-2023 | 24-04-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | Fabrication & fixing of stator cooling pipeline of U#3 |
|
130. | 14/EE(IC&CM)/2022-23 | 15-03-2023 | 24-04-2023 | Dehradun | office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Procurement of new Transformer Oil for various Power Stations of UJVN Ltd |
|
131. | 28/EE/M&G/DLR/2022-23 | 01-04-2023 | 21-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Replacement and modification of Generator Transformer water cooling pipe lines of Dhalipur Power Station |
|
132. | 27/EE/M&G/DLR/2022-23 | 01-04-2023 | 21-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Supply installation testing and commissioning of electric winch machine 5 Ton Capacity at Dhalipur power station |
|
133. | 26/EE/M&G/DLR/2022-23 | 01-04-2023 | 21-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Fabrication and fixing of covers for driving mechanism of Intake Gate Hoists of Unit A,B &C of Dhalipur power station. |
|
134. | 11/EE(Generation)/Vyasi/2022-23 | 31-03-2023 | 21-04-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Establishment of Canteen at Vyasi HEP |
|
135. | 15/EE (Maint)/VP/2022-23 | 01-04-2023 | 21-04-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun, UJVN Ltd | Executive Engineer (Maint. ) | “Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for the office of EE(Maintenance), Vyasi Project, Hathiyari, Dehradun for one year period for Executive Engineer, Vyasi Dam, Juddo" |
|
136. | 23/SPH/2022-23 | 29-03-2023 | 21-04-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Supply , installation , testing and commissioning of packaged type air conditioner at Sharda Power House, Lohiahead” |
|
137. | 34/UJVNL/EE (M&G)/KPS/2022-23 | 30-03-2023 | 20-04-2023 | Kulhal | Office of Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | 3 Drawing generation by reverse engineering 3D Scanner Software of Turbine guide bearing and shaft seal assembly and its interfaces of Unit-A at Kulhal Power House |
|
138. | 18/EE(G)/Chilla/2022-23 | 30-03-2023 | 20-04-2023 | Chilla Power House | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Re-insulation of rotor pole coil of chilla power house |
|
139. | CH (MAINT.) - 36/2022-23 | 29-03-2023 | 20-04-2023 | Chibro | Chibro | Chibro | Hiring of Non AC vehicle with round O’ clock driver for maintenance duty of Chibro Power Station |
|
140. | 10/EE(Generation)/Vyasi/ 2022-23 | 28-03-2023 | 19-04-2023 | Dakpathar | Office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Electrical Fitting for equipments at Offices of Vyasi HEP |
|
141. | 27/EE(M)/RPSK/2022-23 | 29-03-2023 | 18-04-2023 | Pauri Garhwal | Office of Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer (M) | Annual Maintenance of Unit-02 |
|
142. | 06/2022-23/EE Test(GV) | 27-03-2023 | 17-04-2023 | Haridwar | Office of the Executive Engineer, Test(Ganga Valley), Mayapur, Haridwar | Executive Engineer | Restoration of Temperature Scanner in U#2 at Chilla Power House |
|
143. | 17/EE(G)/Chilla/2022-23 | 25-03-2023 | 17-04-2023 | Chilla Power House | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Procurement of protective footwear i.e. safety shoes at Chilla Power House. |
|
144. | 16/EE(G)/Chilla/2022-23 | 25-03-2023 | 17-04-2023 | Chilla Power House | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Providing, installation and commissioning of 15 mbps leased line internet service at Chilla Power House and other associated offices. |
|
145. | 35/EEM&G)DKN/2022-23 | 27-03-2023 | 17-04-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Hiring of One No. Non-AC Diesel Vehicle alongwith driver for Executive Engineer (M&G), Dhakrani Power House on annual contract basis |
|
146. | 19/EE(Gen)/Khodri/2022-23 | 22-03-2023 | 17-04-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Procurement of consumable and miscellaneous items of generator maintenance at Khodri Power Station. |
|
147. | 18/EE(Gen)/Khodri/2022-23 | 22-03-2023 | 17-04-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Repairing of Unit Auxiliary (UAT) of machine no. 4 of Khodri Power Station |
|
148. | 21/EE(Gen)/Khodri/2022-23 | 22-03-2023 | 17-04-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Revamping of switchyard by providing and laying of Gravels in 220 kV switchyard at Khodri Power Station-Phase-II |
|
149. | 25/EE/M&G/DLR/2022-23 | 01-04-2023 | 15-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Repair and Dry Out for removing water content in winding of 20 MVA Generator Transformer of Unit B of Dhalipur Power Station |
|
150. | 29/2022-23/EE(C)/Pashulok Barrage | 25-03-2023 | 15-04-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer (Civil) | Cleaning & Maintenance of Hathi Kund 01,02,and 03 at Power Channel HEP |
|
151. | 37/2022-23/EE/PCM(GV)/Mayapur | 23-03-2023 | 13-04-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwa | Executive Engineer | Slope Protection Works Near Confluence of Chilla Power House Tail Race Channel & Mundal Nala at Chilla |
|
152. | 36/2022-23/EE/PCM(GV)/Mayapur | 23-03-2023 | 13-04-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Flood Protection Works at Right Bank of Ghasiram Nala for the Protection of Haridwar-Chilla Power House Road. |
|
153. | 35/2022-23/EE/PCM(GV)/Mayapur | 23-03-2023 | 13-04-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwa | Executive Engineer | Flood Protection Works at Left Bank of Mundal Nala in upstream of Mundal Bridge for the Protection of Transmission Tower |
|
154. | 19/ EE(Civil) / MB-II / Chinyalisaur / 2022-23 | 22-03-2023 | 13-04-2023 | Uttarkashi | Office of the Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Civil) | Construction of Class Rooms for Saraswati Vidya Mandir Inter collage at Shaktipuram Colony, MB-II, Chinyalisaur |
|
155. | 07/EE(E&M-I)/LP/2022-23 | 17-03-2023 | 13-04-2023 | Dakpathar | Office of Executive Engineer (E&M-I), Lakhwar Project, Dakpathar | Executive Engineer (E&M-I) | Electrical wiring of office & residential buildings. |
Corrigendum 1
|
156. | NIT- 27/EE(Gen)/MB-II/22-23 | 10-03-2023 | 13-04-2023 | Uttarkashi | The office of Executive Engineer (Generation), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Generation) | ELCID Testing of Stator Of 76 MW Hydro Generator At MB-II, Dharasu Power House. |
|
157. | 18/EE(M)/2022-23 | 21-03-2023 | 11-04-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer (Maintenance) | Supply of various consumable items for Tiloth Power House, Uttarkashi. |
|
158. | 23/EE(CM)/DDN/2022-23 | 06-03-2023 | 11-04-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Construction of overhead water tank along with water purifier and hand washing station at Govt. Primary School, Shastri Nagar, Dehradun. |
|
159. | 34/EEM&G)DKN/2022-23 | 24-03-2023 | 10-04-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Hiring of One No. AC diesel vehicle (Mahindra Scorpio or equivalent) for General Manager (Yamuna Valley-II) on annual contract basis |
|
160. | 05/UJVNL/ EE(C-SBR)/2022-23 | 20-03-2023 | 10-04-2023 | Munsiyari | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd.Munsiyari | Executive Engineer (Civil) | Hiring of Manpower Services for a Period of One Year on Outsource Basis for the Office of the Dy. G.M. (Civil) and Executive Engineer (Civil), SBR project and hiring of labours for field visit of experts/committees/officials of other departments at Sirkari Bhyol Rupasiabagar HEP site at Munsiyari in Pithoragarh District |
|
161. | 11/EE(Test)/DKN/2022-23 | 18-03-2023 | 10-04-2023 | Dhakrani | Office of the Executive Engineer (Test), Dhakrani | Executive Engineer (Test) | Repair of faulty relays and earth-fault locator at Dhakrani Power House |
|
162. | 13/EE(T)/MB-II/22-23 | 17-03-2023 | 10-04-2023 | Chinyalisaur | The office of Executive Engineer (Test), MB-II, Dharasu Power House, Chinyalisaur | Executive Engineer (Test) | Up Keeping and Maintenance Of GM (BV)/ DGM (HGC) Offices, Officers Club, JE Club,Type-3 club and 11kv/0.4kv Substation in Shaktipuram Colony, Chinyalisaur. |
|
163. | T-51/EEM/2022-23 | 17-03-2023 | 08-04-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Repair and Rewinding of ceiling fans at Chilla Power House. |
|
164. | T-50/EEM/2022-23 | 17-03-2023 | 08-04-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Annual General Cleaning of different places, Officers Club, Guest House, Substations, Central Store and Tube well premises etc. at Chilla Power House, Chilla |
|
165. | 17/EE(M)/2022-23 | 17-03-2023 | 07-04-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer (Maintenance) | Repairing and overhauling of 11 kV panel installed at DPH Heena and Tiloth. |
|
166. | 16/EE(M)/2022-23 | 17-03-2023 | 07-04-2023 | Uttarkashi | Office of the Executive Engineer (Maintenance) Tiloth Power House, Uttarkashi | Executive Engineer (Maintenance) | Replacement of TPMO switch & fuse set at different locations of Tiloth Power House, Uttarkashi |
|
167. | e-23/EE/M&G/DLR/2022-23 | 04-03-2023 | 07-04-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Procurement of Lube oil cleaner for Turbine Governing system of Unit A,B & C of Dhalipur Power station |
|
168. | 07/EE(Civil-II)/LMP/2022-23 | 22-03-2023 | 06-04-2023 | Dehradun | Office of the Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan, Dakpathar, Dehradun | Executive Engineer (Civil-II) | Annual Cleaning Upkeeping, Gardening and other miscellaneous work of field hostel (near inspection house) of Lakhwar Project at Dakpathar, Dehradun |
|
169. | 14/EE(M)/VP/2022-23 | 17-03-2023 | 06-04-2023 | Dakpathar | Office of the Executive Engineer (Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Maintenance) | Annual maintenance contract of Cooling Water System of Vyasi HEP at Hathiyari,Dehradun . |
|
170. | 33/UJVNL/EE (M&G)/KPS/2022-23 | 15-03-2023 | 06-04-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | Design Fabrication Integration Testing and Commissioning of Low Voltage Switchgear and Control gear at Kulhal Power Station |
|
171. | 20/SPH/2022-23 | 02-03-2023 | 06-04-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Supply of new fire extinguishers and other accessories along with refilling of old fire extinguishers at Sharda Power House, Lohiahead. |
|
172. | 16/EE (Civil-I)/Urgam/2022-23 | 21-02-2023 | 05-04-2023 | Rudraprayag | Office of the Executive Engineer (Civil-I), UJVN Limited, Guptkashi, Rudraprayag | Executive Engineer (Civil-I) | Miscellaneous & Repair work at Power House and Thrust block at Urgam SHP (2x1.5 MW) in Distt- Chamoli. |
|
173. | 22 /SPH/2022-23 | 16-03-2023 | 03-04-2023 | Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Annual Horticulture Maintenance, development of lawn and clearing grass at learning center/guest house”, of Sharda Power House, Lohiahead |
|
174. | 04/EE (Civil-III)/LMP/2022-23 | 14-03-2023 | 03-04-2023 | Dehradun | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer (Civil-III) | Construction and Design of (Abutment, protection and appurtenant civil works) for 85.4 meter span Bailey Suspension Bridge, 24R load class, carriage road width 3.277m with all civil works at River Yamuna at Lakhwar Dam Site Distt. Dehradun |
|
175. | 28/EE (GEN)/MB-II/2022-23 | 10-03-2023 | 03-04-2023 | Chinyalisaur | Office of the (Executive Engineer, Generation, Dharasu Power House, Chinyalisaur | Executive Engineer (Generation | Routine maintenance work of LT and Switchyard at MB-II, Dharasu Power House. |
|
176. | 35/EE/PCM/Dhalipur/ 2022-23 | 22-02-2023 | 03-04-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of Damaged Power Channel from Skew Bridge to Intake of Dhalipur Power House. |
Corrigendum 1
|
177. | 34/EE/PCM/ Dhalipur/ 2022-23 | 22-02-2023 | 03-04-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of Damaged Power Channel from Court Bridge up to Skew Bridge. |
Corrigendum 1
|
178. | 33/EE/PCM/Dhalipur/2022-23 | 22-02-2023 | 03-04-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of Damaged Power Channel from Bhimawala Bridge to Court Bridge. |
Corrigendum 1
|
179. | 32/EE/PCM/Dhalipur/2022-23 | 22-02-2023 | 03-04-2023 | Dehradun | Office of the Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Refurbishment of Damaged Power Channel from Dakpathar silt ejector to Bhimawala Bridge. |
Corrigendum 1
|
180. | 01/DGM(SHP)/PITHORAGARH/2022-23 | 24-03-2023 | 02-04-2023 | Pithoragarh | Office of the Deputy General Manager (SHP), Cantt. Road, Jakhni, Distt-Pithoragarh | General Manager (SHP) | Supply, Transportation, Installation, Commission & Testing of Line Reactor, Capacitor Bank etc. for (2X2.5 MW) Suringad SHP in Tehsil Munsyari District Pithoragarh |
|
181. | (1) 08/EE(Generation)/Vyasi/ 2022-23 | 10-03-2023 | 31-03-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Gen) | Supply & Installation of Easy Movable Gates & Other Fabrication work in (2x60 MW) Vyasi Power Station |
|
182. | NIT-09/EE(Gen)/Vyasi/22-23 | 10-03-2023 | 31-03-2023 | Dakpathar | The office of Executive Engineer (Generation), Vyasi Power Station, Dakpathar | Executive Engineer (Generation) | Supply of stationary items for Vyasi HEP |
Corrigendum 1
|
183. | 43/EE(M)/MB-II/22-23 | 09-03-2023 | 30-03-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Procurement of vacuum breaking valve with sealing seat for turbine of Dharasu power House MB-II, Uttarkashi |
|
184. | 42/EE(M)/MB-II/22-23 | 09-03-2023 | 30-03-2023 | Uttarkashi | The office of Executive Engineer (Maintenance), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer (Maintenance) | Repair and Rewinding of 90kW Flygt Make Cooling Water Pumps of Dharasu Power House |
|
185. | 04/EE(Civil-II)/Guptkashi/2022-23 | 27-01-2023 | 30-03-2023 | Guptkashi | Executive Engineer (Civil-II) SHP, UJVN Limited, Guptkashi | Executive Engineer | Hiring of one number Light diesel Pool vehicle Mahindra & Mahindra Bolero (Non - AC) or equivalent with driver for one year on rent basis under O/o Executive Engineer (Civil-II) SHP, Guptkashi in District- Rudraprayag. |
|
186. | 17/EE (Civil-I)/Dunao/2022-23 | 24-02-2023 | 29-03-2023 | Rudraprayag | Office of the Executive Engineer (Civil-I), UJVN Limited, Guptkashi, Rudraprayag | Executive Engineer (Civil-I) | Protection and Power Channel covering work at Ram Prasad Nautiyal, Dunao SHP (2x0.75 MW) in Distt- Pauri Garhwal |
|
187. | 20/EE(Gen)/Khodri/2022-23 | 06-03-2023 | 28-03-2023 | Dehradun | Office of the Executive Engineer (Generation), Khodri Power Station, Dakpathar (Dehradun) | Executive Engineer (Generation) | Various works related to Hydrant System at Khodri Power Station |
|
188. | 33/EEM&G)DKN/2022-23 | 06-03-2023 | 28-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Repairing of 33/ 11 kV 1 MVA transformer |
|
189. | 32/EEM&G)DKN/2022-23 | 06-03-2023 | 28-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Repairing of drainage /dewatering Pumps |
|
190. | 31/EEM&G)DKN/2022-23 | 06-03-2023 | 28-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani Power House | Executive Engineer (M&G) | Repair & overhauling of EOT Crane |
|
191. | 18/EE (Civil-I)/Kaliganga-II/2022-23 | 03-03-2023 | 28-03-2023 | Rudraprayag | Office of the Executive Engineer (Civil-I), UJVN Limited, Guptkashi, Rudraprayag | Executive Engineer (Civil-I) | Protection work at Forebay escape of Kaliganga-II SHP (2x2.25 MW) in Distt-Rudraprayag |
|
192. | 09 /EE (Test)/MB-II/2022-23 | 15-12-2022 | 28-03-2023 | Chinyalisaur | Executive Engineer (Test), Maneri Bhali Stage-II | Executive Engineer | Supply, Installation, Testing & Commissioning of 24 VDC, 850AH, VRLA Battery Bank at Dharasu Power House (MB-II), Chinylaisaur (Uttarkashi). |
|
193. | 14/EE(G)/Klg/2022-23 | 07-03-2023 | 27-03-2023 | Kalagarh | Office of the Executive Engineer (Generation), Ramganga Power Station, Kalagarh (Pauri-Garhwal) | Executive Engineer (Generation) | Supply & installation work of LED False Ceiling Lights at Ramganga Power Station, Kalagarh |
|
194. | T-49/EEM/2022-23 | 05-03-2023 | 27-03-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | 1-SITC of gear based easy movable mechanism system of central store gates chilla |
|
195. | CH(Maint.)-35/2022-23 | 04-03-2023 | 27-03-2023 | Dehradun | Office of the Executive Engineer (Maint.), Chibro Power Station, Dakpathar (Dehradun) | Executive Engineer (Maint.) | Refurbishment & Installation & Commissioning of 01 Set of Turbine Guide Bearing Pads of 60 MW Francis Turbine of Chibro |
|
196. | e 13/EE(Gen)/Klg/2022-23 | 14-02-2023 | 27-03-2023 | Kalagarh | Executive Engineer (Generation) Ramganga Power Station | Executive Engineer | Supply, Installation, Testing & Commissioning of 110 V/400 Ah Plante Battery Bank at Ramganga Power Station, Kalagarh, Kalagarh. |
|
197. | 39/EE(Pathri)/2022-23 | 03-03-2023 | 25-03-2023 | Hardwar | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer, (M&G) | Office of the Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar |
|
198. | CH(Maint.)-34/2022-23 | 04-03-2023 | 25-03-2023 | Chibro | Office of the Executive Engineer (Maint.), Chibro Power Station | Executive Engineer (Maint.) | Procurement of spare fasteners of Main Inlet Valve Flange at Chibro |
|
199. | 02/EE(E&M)/Vyasi Dam/2022-23 | 25-02-2023 | 25-03-2023 | Dakpathar | Office of the Executive Engineer (E&M ), Vaysi Dam, Juddo Dakpathar | Executive Engineer | Annual operation of Dam related control system & associated equipment of Vyasi HEP at juddo |
|
200. | 38/EE(Pathri)/2022-23 | 31-01-2023 | 25-03-2023 | Hardwar | Executive Engineer, (M&G) Pathri Power House, Bahadrabad | Executive Engineer | Design, Supply, Erection, Installation of Bore well Water System at Pathri Power House. |
|
201. | 24/EE/M&G/DLR/2022-23 | 04-03-2023 | 24-03-2023 | Dhalipur | Office of the Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Enhancing fencing security system of Dhalipur Power House Providing. |
|
202. | 13/EE (Maint)/VP/2022-23 | 04-03-2023 | 24-03-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun | Executive Engineer (Maint.) | Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for the office of EE(Maintenance), Vyasi Project, Hathiyari, Dehradun for one year period for Executive Engineer |
|
203. | 12/EE (Maint)/VP/2022-23 | 04-03-2023 | 24-03-2023 | Dehradun | Office of the Executive Engineer (Maint. ), Vaysi Project Hathiyari, Dehradun | Executive Engineer (Maint.) | Hiring of one number Light diesel vehicle (M&M Bolero or Equipment) along with driver for the office of EE(Maint.), Vyasi Project, Hathiyari, Dehradun for one year period for pool vehicle |
|
204. | e-NIT/13/EE (E&M)/Asan Barrage/2022-23 | 02-03-2023 | 24-03-2023 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bwawan, Dhakrani, Dehradun | Executive Engineer (E&M) | Major overhauling of silt ejector gate at Asan Barrage |
|
205. | 03/EE (Civil-III)/LMP/2022-23 | 02-03-2023 | 24-03-2023 | Dehradun | Office of The Executive Engineer (Civil-III), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer (Civil-III) | Repair/ Maintenance and other miscellaneous civil work of Ambari store of Lakhwar project at Dakpathar (Dehradun) |
|
206. | 22/EE(CM)/DDN/2022-23 | 02-03-2023 | 23-03-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Outer Painting & associated repair work of Type-III residences of UJVN Limited at Yamuna Colony, Dehradun |
|
207. | 21/EE(CM)/DDN/2022-23 | 02-03-2023 | 23-03-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Outer Painting & associated repair work of Type-I residences of UJVN Limited at Yamuna Colony, Dehradun. |
|
208. | T-48/EEM/2023-24 | 02-03-2023 | 23-03-2023 | Chilla | Office of the Executive Engineer, Maintenance Chilla | Executive Engineer (M), Chilla Power House | Hiring of Light diesel vehicle non AC (Mahindra Bolero & Equivalent ) with driver for a period of 12 months for EE (Generation) Chilla |
|
209. | 31/EE/PCM-DKP/TN/2022-23 | 01-03-2023 | 23-03-2023 | Dehradun | Office of the Executive Engineer, PCM-Dakpathar, UJVNLtd., Dakpathar (Dehradun) | Executive Engineer | Repair of drain in front of switchyard at Khodri Power House, Khodri (Dehradun) |
|
210. | 15/EE (Civil-I)/LMP/2022-23 | 26-02-2023 | 23-03-2023 | Dehradun | Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Cleaning and Up-keeping of site offices of Lakhwar MPP |
|
211. | 20/EE(C&M)/MB-II/ Joshiyara/2022-23 | 01-03-2023 | 22-03-2023 | Uttarkashi | Office of the Executive Engineer (C&M) MB-II Joshiyara, Uttarkashi | Executive Engineer (C&M) | Reconstruction of drain near playground at MB-II Joshiyara Uttarkashi. |
|
212. | 32/UJVNL/EE (M&G)/KPS/2022-23 | 28-02-2023 | 21-03-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | Rectification of problem followed by AMC of Hydro-Mechanical governors installed at Kulhal Power Station along with other associated works |
|
213. | 31/UJVNL/EE (M&G)/KPS/2022-23 | 28-02-2023 | 21-03-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | Shifting of 33 KV line, Khara no 4 and Khara no 5 under Kulhal Power House, Kulhal |
|
214. | 30/UJVNL/EE (M&G)/KPS/2022-23 | 28-02-2023 | 21-03-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | Cleaning of drain water sump, sealing water tank, penstock gallery flushing of cooling water strainer and Bye pass gate charging pit for the period of one year of Kulhal Power House.” |
|
215. | 29/UJVNL/EE (M&G)/KPS/2022-23 | 28-02-2023 | 21-03-2023 | Kulhal | Office of the Executive Engineer (M&G) Kulhal Power Station, Kulhal | Executive Engineer (M&G) | SITC of new 12.5 HP Submersible Pump at Kulhal Old Colony, Kulhal Power House |
|
216. | 28/2022-23/EE(C)/Pashulok Barrage | 26-02-2023 | 21-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | External Painting Work of Type-I Residences of New Hydel Colony at Pashulok, Rishikesh. |
|
217. | 27/2022-23/EE(C)/Pashulok Barrage | 26-02-2023 | 21-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh. | Executive Engineer | External Painting Work of Type-A Residences of Barrage Colony, Type-II & Type-III Residences of New Hydel Colony at Pashulok, Rishikesh. |
|
218. | 26/2022-23/EE(C)/Pashulok Barrage | 26-02-2023 | 21-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | Internal Painting work of Type-I, Type-II & Type-III Residences of New Hydel Colony at Pashulok, Rishikesh |
|
219. | 30/EEM&G)DKN/2022-23 | 25-02-2023 | 21-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Repair & overhauling of Trash rack Cleaning Machine |
|
220. | 29/EEM&G)DKN/2022-23 | 25-02-2023 | 21-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Replacement of rubber seals of Draft Tube gates |
|
221. | 28/EEM&G)DKN/2022-23 | 25-02-2023 | 21-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Supply, Installation, Testing and Commissioning of 33 kV Vacuum Circuit Breakers |
|
222. | 09/2022-23/EE(C-M) | 05-03-2023 | 20-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Annual Repair and maintenance of Juddo Dam of Vyasi HEP at Juddo (Dehradun) |
|
223. | 24/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 25-02-2023 | 20-03-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal. | Executive Engineer | Interior painting work of Type-II Residences at Hydel Colony Kalagarh |
|
224. | 23/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 25-02-2023 | 20-03-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer | Exterior painting work of Type-II Residences at Hydel Colony Kalagarh. |
|
225. | NIT-01/EE(E&M)/Vyasi Dam/22-23 | 07-02-2023 | 20-03-2023 | Dakpathar | Executive Engineer (E&M), Vyasi Dam Juddo | Executive Engineer | Supply of various Electrical Spare parts for Dam site Juddo, Dakpatthar (Dehradun). |
|
226. | 12/EE(G)/Klg/2022-23 | 19-01-2023 | 20-03-2023 | Pauri-Garhwal | Executive Engineer (Generation), Ramganga Power Station, Kalagarh | Executive Engineer | Providing and fixing work of emergency exit sign boards, Safety Posters. |
|
227. | 27/EEM&G)DKN/2022-23 | 24-02-2023 | 18-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Supply, Installation, Testing and Commissioning of Rolling Shutters |
|
228. | 26/EEM&G)DKN/2022-23 | 24-02-2023 | 18-03-2023 | Dhakrani | Office of the Executive Engineer (M&G) Dhakrani | Executive Engineer (M&G) | Oil testing of various transformers. |
|
229. | 01/GM(SHP)/UJVNL/2022-23 | 21-02-2023 | 18-03-2023 | Rishikesh | Office of the General Manager (SHP), UJVN Ltd., Maneri Bhali Colony Rishikesh | EXECUTIVE ENGINEER (A)SHP Rishikesh | Hiring of one number Light diesel vehicle with AC (Scorpio/Creta or equivalent) with driver for one year on rent basis for GM (SHP) UJVN Limited, Maneri Bhali colony, Rishikesh. |
Corrigendum 1
|
230. | 25/EE(M&G)/DKN/2022-23 | 15-02-2023 | 18-03-2023 | Dhakrani | Executive Engineer (M&G), Dhakrani Power House | Executive Engineer | Supply, Installation, Testing and Commissioning of 36 kV Isolators at 132/33 kV Switchyard of Dhakrani Power Station. |
|
231. | 08/2022-23/EE(C-M)Vyasi Project | 04-03-2023 | 17-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Annual Cleaning, Sweeping and other associated works in open area of Power House Building, HRT and Surge Shaft of Vyasi HEP at Hathiyari, Dehradun |
|
232. | 07/2022-23/EE(C-M)Vyasi Project | 04-03-2023 | 17-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Annual Upkeeping and other works related to offices of Civil-Maintenance, Vyasi Project, Dakpathar, Dehradun |
|
233. | 06/2022-23/EE(C-M)Vyasi Project | 04-03-2023 | 17-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Granite stone fixing work at staircase Lift opening area in Dam at Juddo, Vyasi HEP (2X60MW) |
|
234. | 12 /EE (Test)/MB-II/2022-23 | 17-02-2023 | 17-03-2023 | Uttarkashi | Executive Engineer (Test), Maneri Bhali Stage-II, Chinyalisaur (Uttarkashi) | Executive Engineer | AMC of Computer & IT Equipments & procurement of spares for GM office, DGM office, Account office, Joshiyara Barrage and Dharasu Power House MB-II |
|
235. | CH(Maint.)-32/2022-23 | 14-02-2023 | 17-03-2023 | Dakpathar | Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Servicing of 100 Ton Syphon Tunnel Crane at Chibro. |
|
236. | 11 / प्रबन्धक (प्र TTO एवं सु ) / 2022-23 | 24-02-2023 | 16-03-2023 | देहरादून | उज्ज्वल, महारानी बाग,जीएमएस रोड, देहरादून | प्रबन्धक (प्रशासन एवं सुरक्षा) | उज्ज्वल, महारानी बाग,जीएमरोड,देहरादून परिसर के बाग बहार(वर्श 2023-24)की बिकी |
|
237. | 02/2022-23/EE(HM-I)/CD&H,Rishikesh | 23-02-2023 | 16-03-2023 | Dehradun | For and on behalf of UJVN Limited, Executive Engineer (HM-I), CD&H, Pashulok, Rishikesh, Dehradun | Executive Engineer (HM-I) | Hiring of one no. light non-AC diesel vehicle (M&M Bolero or equivalent) along with driver on rent basis for 12 months for DGM(CD-I)Pashulok, Rishikesh.”, |
|
238. | 04/2022-23/EE(C-M)Vyasi | 17-02-2023 | 16-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Hiring of one number vehicle (Mahindra Scorpio, AC (diesel)/equivalent along with driver for General Manager(Civil maintenance) Vyasi Project cum GM (Civil) Arakot-Tiuni &Tiuni Plasu, Dakpathar, Dehradun for one year.” |
|
239. | 25/2022-23/EE | 16-02-2023 | 16-03-2023 | Rishikesh | Office of the Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh | Executive Engineer (Civil) | Protection Work in Left Bank at Just Upstream of Bin Super Passage. |
|
240. | 15 /EE(G)/2022-23 | 23-02-2023 | 15-03-2023 | Chilla | Office of the Executive Engineer (G), Chilla Power House | Executive Engineer (G) | Procurement of printed log books and various stationary items for chilla power house |
|
241. | 14/EE(G)/2022-23 | 23-03-2023 | 15-03-2023 | Chilla | Office of the Executive Engineer (G), Chilla | Executive Engineer (G) | Supply, laying & fixing of 11kV Power Cable for 800 kVA SAT No-1 at Chilla Power House. |
|
242. | 05/ EE(Civil)/SHP/Maneri /2022-23 | 23-02-2023 | 15-03-2023 | Uttarkashi | Office of the Executive Engineer (Civil)/SHP/Maneri Uttarkashi | Executive Engineer (Civil)/SHP/Maneri | Hiring of one no. Non A.C Diesel vehicle Such as Mahindra Bolero or equivalent with driver for office of Executive Engineer (Civil),SHP Maneri,Uttarkashi for one year, |
|
243. | 22/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 17-02-2023 | 15-03-2023 | Pauri Garhwal | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer (Civil) | Providing & Laying new Granite Stone and Kota Stone flooring in Ramganga Power House Kalagarh. |
|
244. | 07/EE(E&M-SHP)/KG-II/2022-23 | 16-02-2023 | 15-03-2023 | Guptkashi | Office of the Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer (E&M-SHP) | Supply, Installation, Testing and Commissioning of CCTV & its accessories at Kaliganga-II SHP near village Kaviltha, tehsil Ukhimath in district Rudraprayag, Uttarakhand. |
|
245. | 15/EE(M)/2022-23 | 28-01-2023 | 15-03-2023 | Uttarkashi | Executive Engineer (Maintenance) Tiloth Power House | Executive Engineer | Different maintenance works of 5 MT capacity single girder EOT crane at Tiloth Power House, Uttarkashi. |
|
246. | 16/EE (Civil-I)/LMP/2022-23 | 28-02-2023 | 14-03-2023 | Dehradun | Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (Distt-Dehradun | Executive Engineer (Civil-I) | Repair/Reconstruction of Project approach roads of Lakhwar MPP |
|
247. | 09/EE(Test)/DKN/2022-23 | 19-01-2023 | 14-03-2023 | Dhakrani | Executive Engineer (Test), Dhakrani | Executive Engineer | Servicing of 220/110 Volt battery banks and battery chargers & Provisioning of standby 48 volt DC source for PLCC panels. |
|
248. | 14/EE (Civil-I)/LMP/2022-23 | 26-02-2023 | 13-03-2023 | Dehradun | Office of The Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (DisttDehradun) | Executive Engineer | Carrying out Miscellaneous Survey work for Lakhwar Multipurpose Project |
|
249. | 32/2022-23/EE/PCM(GV)/Mayapur | 20-02-2023 | 13-03-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer, PCM (GV) | Conversion of Andritz Office in Committee Hall at Pathri Power House. |
|
250. | 31/2022-23/EE/PCM(GV)/Mayapur | 20-02-2023 | 13-03-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer, PCM (GV) | External Painting Work of Type-II Residences of Chilla Colony |
|
251. | 34/2022-23/EE/PCM(GV)/Mayapur | 20-02-2023 | 13-03-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer, PCM (GV) | Painting Work of Residential and Non-Residential Buildings of Mayapur Colony at Haridwar. |
|
252. | 33/2022-23/EE/PCM(GV)/Mayapur | 20-02-2023 | 13-03-2023 | Haridwar | Office of the Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer, PCM (GV) | External Painting Work of Type-I Residences of Chilla Colony. |
|
253. | 04/UJVNL/EE(C-SBR)/2022-23 | 20-02-2023 | 13-03-2023 | Pithoragarh | Office of the Executive Engineer (Civil), SBR Project, UJVN Ltd, Munsiyari, Pithoragarh | (Executive Engineer (C), SBR Project) | Construction of approach path to barrage site of SBR-HEP (120 MW) at tehsil Munsyari in dist. Pithoragarh. |
|
254. | 11/EE(Maint.)/VP/2022-23 | 18-02-2023 | 13-03-2023 | Dakpathar | Office of the Executive Engineer (Maint.), Vyasi Project, Dakpathar | Executive Engineer (Maint.) | Hiring of one no. 11 Seater Van for one year on contract basis for transportation of staff of Vyasi Dam, Juddo, Dehradun |
|
255. | 20/EE(CM)/DDN/2022-23 | 20-02-2023 | 13-03-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Construction of Saraswati Shishu Mandir school building under CSR head at Soda-Siroli, Raipur, Dehradun. |
|
256. | 19/EE(CM)/DDN/2022-23 | 20-02-2023 | 13-03-2023 | Dehradun | Office of the Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony, Dehradun | Executive Engineer (Civil-Maintenance) | Hiring of Diesel Vehicle Bolero or equivalent of model 2021 or later (With Driver) for the Office of the Executive Engineer, Civil Maintenance, Yamuna Colony, UJVN Ltd. Dehradun. |
|
257. | 19/SPH/2022-23 | 16-02-2023 | 13-03-2023 | Lohiahead, Khatima | Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima | Executive Engineer (M&G) | Cleaning of trash rack with the help of labours and disposal of debris from collecting pit of Sharda Power House, Lohiahead. |
|
258. | 21/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 16-02-2023 | 13-03-2023 | Kalagarh, Pauri Garhwal | Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer (Civil) | M&R work of drains and making path along drains in IIIrd type residences at Hydel Colony Kalagarh |
|
259. | 20/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 16-02-2023 | 13-03-2023 | Kalagarh, Pauri Garhwal | Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Executive Engineer (Civil) | Interior and exterior painting work of Type-I & Type-A residences at Hydel colony Kalagarh. |
|
260. | 24/2022-23/EE (Civil)/UJVNL/Pashulok Barrage | 14-02-2023 | 13-03-2023 | Rishikesh | Executive Engineer (Civil), UJVNL, Pashulok Barrage | Executive Engineer | Protection Work in Left Bank Near Vindhyavasini Site at Bin River. |
|
261. | 23/2022-23/EE (Civil)/UJVNL/Pashulok Barrage | 14-02-2023 | 13-03-2023 | Rishikesh | Executive Engineer (Civil), UJVNL, Pashulok Barrage | Executive Engineer | Protection Works of Downstream of Bin Super Passage at Power Channel of Chilla HEP. |
|
262. | NIT- 10/EE(Test)/MB-II/22-23 | 15-02-2023 | 11-03-2023 | Chinyalisaur | Executive Engineer (Test), Maneri Bhali Stage-II | Executive Engineer | Procurement of spare Items for Battery Bank at Dharasu Power House MB-II, Chinyalisaur Uttarkashi -249196. |
|
263. | 11/EE(Test)/MB-II/22-23 | 15-02-2023 | 11-03-2023 | Chinyalisaur | Executive Engineer (Test), Maneri Bhali Stage-II | Executive Engineer | Procurement of Rotary Switches for ASEP & GCP for Dharasu Power House MB-II, Chinyalisaur Uttarkashi. |
|
264. | 05/2022-23/EE(C-M) | 18-02-2023 | 10-03-2023 | Dakpathar | Office of the Executive Engineer (Civil-Maintenance), Vyasi Project, Dakpathar | Executive Engineer (Civil-Maintenance) | Annual Maintenance of Power House and allied structures of Vyasi HEP (2X60 MW) at Hathiyari, Dehradun |
Corrigendum 1
|
265. | 12/EE(IC&CM)/2022-23 | 17-02-2023 | 10-03-2023 | Dehradun | Office of the EE(IC&CM) Ganga Bhawan, Yamuna Colony, Dehradun | EE(IC&CM) | Hindi Translation and Printing of annual financial report of UJVN Ltd. for the F.Y. 2021-22 |
|
266. | 12/EE(E&M)/AB/2022-23 | 16-02-2023 | 10-03-2023 | Dehradun | Office of the Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani, Dehradun | Executive Engineer | Leakage sealing of Barrage Gates and other works |
|
267. | 18/SPH/2022-23 | 15-02-2023 | 10-03-2023 | Lohiahead, Khatima | Office of the Executive Engineer (M&G), Sharda Power House, Lohiahead, Khatima, | Executive Engineer(M&G) | Procurement of 2 nos 36 kV Vacuum Circuit Breakers of rated current 1250 A for 33 kV switchyard at Sharda Power House, Lohiahead” . |
|
268. | 17/EE(Gen)/Khodri/2022-23 | 15-02-2023 | 10-03-2023 | Dakpathar | Executive Engineer (Generation), Khodri Power Station | Executive Engineer | Retrofitting and up gradation of 3X 40 TR DX AC Plant at Khodri Power Station. |
|
269. | 10/EE(G)/Klg/2022-23 | 06-01-2023 | 10-03-2023 | Pauri-Garhwal | Eecutixve Engineer (Generation), Ramganga Power Station, Kalagarh | Executive Engineer | Internet Leased Line Service at Ramganga Power Station, Kalagarh for a period of one year works. |
Corrigendum 1
Corrigendum 2
|
270. | 13/EE(Civil-I)/LMP/2022-23 | 16-02-2023 | 09-03-2023 | Dakpathar | Executive Engineer (Civil-I), Lakhwar Multipurpose Project, UJVN Limited, Dakpathar (Dehradun) | Executive Engineer (Civil-I) | Repair and maintenance of residences of Lakhwar project at Dakpathar (Dehradun) |
|
271. | CH(Maint.)-33/2022-23 | 14-02-2023 | 09-03-2023 | Dakpathar | Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Repairing & overhauling of Drainage & Dewatering pumps system of Chibro. |
|
272. | 21/EE/M&G/DLR/2022-23 | 14-02-2023 | 08-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer (M&G) | Annual Cleaning of Dhalipur Power House Intake Trash Rack, Parks, Power House Campus, Pitching walls, uneven field, Switchyard etc for FY. 2022-23 |
|
273. | 21/EE/M&G/DLR/2022-23 | 14-02-2023 | 08-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Annual Cleaning of Dhalipur Power House Intake Trash Rack, Parks, Power House Campus, Pitching walls, uneven field, Switchyard etc for FY. 2022-23. |
|
274. | 21/EE(M&G)/MPH/2022-23 | 26-02-2023 | 06-03-2023 | Haridwar | Office of the Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan -Hardwar | Executive Engineer | Hiring of One non AC Vehicle for School going Children and Power house work at Mohammadpur Power House for one year |
|
275. | 04/EE/BP/2022-23 | 06-02-2023 | 06-03-2023 | Tehri Garhwal | Executive Engineer, UJVN Ltd., Ghansali, Tehri Garhwal | Executive Engineer | Hiring of one no. Vehicle (M&M Bolero, Non-AC or equivalent) along with driver for one Year. |
|
276. | PDD-12/2022-23 | 18-01-2023 | 05-03-2023 | Dakpathar | Executive Engineer, Project Distribution Division | Executive Engineer | Supply of HT XLPE armored cable of different sizes. |
|
277. | 20/EE(M&G)/MPH/2022-23 | 11-02-2023 | 03-03-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan | Executive Engineer | Overhauling & maintenance of Trash rack cleaning machine at Mohammadpur Power House. |
|
278. | 19/EE(M&G)/MPH/2022-23 | 11-02-2023 | 03-03-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan | Executive Engineer | Annual routine maintenance at Mohammadpur Power house. |
|
279. | 09/EE(E&M-II)/LP/2022-23 | 10-02-2023 | 03-03-2023 | Lakhwar | Office of the Executive Engineer-II (E&M-II), Lakhwar Project, Dakpathar, UJVN Ltd | Executive Engineer | Turfing & Cable Protection work at 33/11 KV, Lakhwar substation, Kaldriyan, Nainbagh, Tehrighwal |
|
280. | 30/EE(G)/CPH/2022-23 | 09-02-2023 | 03-03-2023 | Chibro | Executive Engineer (Generation) Chibro Power House, Chibro | Executive Engineer | Supply & Installation of fire extinguisher equipments and Insulating coating at Chibro Power House .” |
|
281. | 20/EE/M&G/DLR/2022-23 | 08-02-2023 | 02-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Rewinding & Overhauling of various type burnt motor of 3 x 17 MW. Dhalipur Power Station. |
|
282. | 19/EE/M&G/DLR/2022-23 | 08-02-2023 | 02-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Rewinding & Overhauling of Governor pump burnt motor of Unit B of Dhalipur Power Station |
|
283. | 18/EE/M&G/DLR/2022-23 | 08-02-2023 | 02-03-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Refilling of various dry powder extinguisher stored pressure ABC type at Dhalipur Power Station |
|
284. | 15/EE(Civil-I)/Urgam/2022-23 | 06-02-2023 | 02-03-2023 | Rudraprayag | Executive Engineer (Civil-I), UJVN Limited, Guptkashi | Executive Engineer | Protection & Repair work at Intake and water conductor system at Urgam SHP (2x1.5 MW) in Distt- Chamoli. |
|
285. | 31/EE/PCM/Dhalipur/ 2022-23 | 07-02-2023 | 02-03-2023 | Dehradun | Executive Engineer PCM Dhalipur, Dehradun | Executive Engineer | Extension of existing vehicle parking at Dhalipur Power House at Dhalipur, Dehradun. |
|
286. | 02/2022-23/EE(Civil-II)/BP | 03-02-2023 | 02-03-2023 | Garhwal | Executive Engineer (Civil-II) Bhilangna Projects Ghansali Tehri Garhwal | Civil | Hiring of one no. diesel vehicle Non-AC (M&M Bolero or equivalent) along with driver for Executive Engineer (Civil—II), Bhilangna Projects, Ghansali, Tehri Garhwal for twelve Months. |
|
287. | 22/2022-23/EE (Civil)/UJVNL/Pashulok Barrage | 09-02-2023 | 01-03-2023 | Rishikesh | Executive Engineer (Civil), UJVNL, Pashulok Barrage Rishikesh | Executive Engineer | Construction of Drain at Ganga Bhogpur Talla along the Power Channel of Chilla HEP |
Corrigendum 1
|
288. | 29/2022-23/EE/PCM(GV)/Mayapur | 08-02-2023 | 01-03-2023 | Haridwar | Executive Engineer, Project Civil Maintenance(Ganga Valley), Mayapur, Haridwar. | Executive Engineer | Roof Leakage Treatment of Residential Buildings at Pathri Power House Colony. |
|
289. | 21/2022-23/EE(C)/Pashulok Barrage | 07-02-2023 | 01-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | Renovation & Strengthing of Damaged Boundary Wall of New Hydel Colony Rishikesh. |
|
290. | 20/2022-23/EE(C)/Pashulok Barrage | 07-02-2023 | 01-03-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Executive Engineer | Works Related to Barrels and Cross drainage of Chilla HEP Power Channel at Rishikesh. |
|
291. | 18/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 30-01-2023 | 01-03-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh | Executive Engineer | Hiring of Diesel Vehicle Bolero/Sumo or equivalent (Model not older than year 2021) with driver for the office of Executive Engineer (Civil) Kalagarh for 12 months |
|
292. | 17/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 30-01-2023 | 01-03-2023 | Kalagarh | Office of the Executive Engineer (Civil), UJVN Ltd., Kalagarh | Executive Engineer | Repair & Reconstruction of Inspection chambers, Septic tanks and Soak pits in Type IInd Residences at hydel colony Kalagarh |
|
293. | 12/EE (Civil-I)/LMP/2022-23 | 07-02-2023 | 28-02-2023 | Dehradun | Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar (Distt-Dehradun) | Executive Engineer | Cleaning, Up-keeping, Gardening and minor repair works of Lakhwar Bhawan-II at Dakpathar (Dehradun). |
|
294. | 11/EE (Civil-I)/LMP/2022-23 | 07-02-2023 | 28-02-2023 | Dakpathar | Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar | Executive Engineer | Cleaning, Up-keeping, Gardening and minor repair works of Lakhwar Bhawan-I at Dakpathar (Dehradun). |
|
295. | 10/EE (Civil-I)/LMP/2022-23 | 07-02-2023 | 28-02-2023 | Dakpathar | Executive Engineer (Civil-I), Lakhwar Multipurpose Project, Dakpathar | Executive Engineer | Construction of classroom and minor repair of St. Marrys Convent School, Dakpathar under UJVNL CSR. |
|
296. | 30/EE/PCM/Dhalipur/ 2022-23 | 06-02-2023 | 28-02-2023 | Dehradun | Executive Engineer PCM Dhalipur | Executive Engineer | Special Repair and Maintenance works of A, B and D Type residences of Kulhal Power House Colony, Dehradun. |
|
297. | 29/EE/PCM/Dhalipur/ 2022-23 | 06-02-2023 | 28-02-2023 | Dehradun | Executive Engineer PCM Dhalipur | Executive Engineer | Special M&R of Dhalipur P H Building of Dhalipur Power House at Dhalipur, Dehradun. |
|
298. | 19/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 04-02-2023 | 27-02-2023 | Pauri Garhwal | Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwa | Executive Engineer | Balance work of Leakage Treatment of Nissen Sheds, office Staff Shed and Work Shop Shed at Central Store Kalagarh. |
|
299. | PDD-13/2022-23 | 06-02-2023 | 27-02-2023 | Dakpathar | Executive Engineer, Project Distribution Division | Executive Engineer | Supply and fixing of 33 kV Isolators (Pole mounted) and metering unit for 33 kV Dhakrani-Chibro feeder no-01 & 02. |
|
300. | 26/UJVNL/EE (M&G)/KPS/2022-23 | 01-02-2023 | 27-02-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | Contract for operation and maintenance activities at Kulhal Power House. |
Corrigendum 1
|
301. | 21/EE (GEN)MB-11/2022-23 | 04-02-2023 | 27-02-2023 | Chinyalisaur | Executive Engineer (Gen.), MB-II | Executive Engineer | Procurement of 3 phase 11/0.4 kV, 800 KVA Dry Type Cast Resin Unit auxiliary transformer for MB-II Dharasu Power House. |
|
302. | 11/EE(E&M)/AB/2022-23 | 04-02-2023 | 25-02-2023 | Dehradun | Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani | Executive Engineer | Procurement of various type of cartridges. |
|
303. | 10/EE(E&M)/AB/2022-23 | 04-02-2023 | 25-02-2023 | Dehradun | Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani | Executive Engineer | Inspection & Testing (safety audit) of various equipment. |
|
304. | 26/EE(M)/RPSK/2022-23 | 05-03-2023 | 25-02-2023 | Pauri Garhwal | Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh | Executive Engineer | Replacement of neoprene rubber seal and other associated works for draft tube gates of Unit-1 & Unit-2. |
|
305. | CH (MAINT.) - 30/2022-23 | 03-02-2023 | 25-02-2023 | Chibro | Executive Engineer (Maint.) ,Chibro Power Station | Executive Engineer | Casting, Machining & Supply of Breaking Link For 60 Mw Hydro Turbine of Chibro Power Station. |
|
306. | CH (MAINT.) - 31/2022-23 | 03-02-2023 | 25-02-2023 | Chibro | Executive Engineer (Maint.) ,Chibro Power Station | Executive Engineer | Replacement of SS Shaft Sleeve & overhauling of Shaft gland Assembly of 60 MW Hydro Turbine at Chibro Power Station. |
|
307. | 28/UJVNL/EE (M&G)/KPS/2021-22 | 04-02-2023 | 24-02-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station, Kulha | Executive Engineer | Providing, Fixing and Installation of Electric Fencing at 132 KV Switchyard Old & New Colony UJVNL, Kulhal Power Station. |
|
308. | 29/EE(G)/CPH/2022-23 | 03-02-2023 | 24-02-2023 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer | Repair& Re-insulation of Stator Coils & Rotor Pole Coils of 60 MW Generator at Chibro Powerhouse. |
|
309. | 28e/EE(G)/CPH/2022-23 | 03-02-2023 | 24-02-2023 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer | Fabrication, supply, installation & commissioning of 1 set (12 Nos.) bearing coolers for 60 MW Generator Unit2&4 at Chibro Power House. |
|
310. | 08 /EE (GC)/2022-23 | 25-01-2023 | 24-02-2023 | Dehradun | Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony | Executive Engineer | General Overhauling and Maintenance of Generator, Turbine, and OPU of Unit No. # 03 of Galogi SHP. |
|
311. | 27/EE(G)/CPH/2022-23 | 24-01-2023 | 24-02-2023 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer2 | Supply of spares & AMC of CCTV Surveillance System at Chibro Power House. |
|
312. | e- 22/UJVNL/EE (M&G)/KPS/2022-23 | 13-12-2022 | 24-02-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | S.I.T.C of Nitrogen Injection Fire Protection System for 6.6/132 kV, 12.5 MVA Generator Transformer of Unit A & C installed at Kulhal Power Station. |
|
313. | 30/2022-23/EE/PCM(GV)/Mayapur | 08-02-2023 | 23-02-2023 | Haridwar | Executive Engineer, PCM(GV), Mayapur, Haridwar | Executive Engineer | Providing & Laying Interlocking Tiles at various locations of Mohammdpur Colony. |
|
314. | 24/EE(Civil)/MB-I/TN/2022-23 | 03-02-2023 | 23-02-2023 | Uttarkashi | Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri | Executive Engineer | Supply of Inverter, Ceiling Fan and Street Light in Dy. General Manager Office Building, Field Hostel and Officers Transit Camp at Maneri Dam Colony, Maneri, Uttarkashi. |
|
315. | 23/EE(Civil)/MB-I/TN/2022-23 | 03-02-2023 | 23-02-2023 | Uttarkashi | Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri | Executive Engineer | Annual sweeping and cleaning work of DGM(CM-BV) Office and Maneri Dam Colony at Maneri, Uttarkashi. |
|
316. | 22/EE(Civil)/MBI/TN/2022-23 | 03-02-2023 | 23-02-2023 | Uttarkashi | Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri | Executive Engineer | Annual Operation and Maintenance of 4KLD STP based at Maneri Dam, Maneri, Uttarkashi. |
|
317. | 21/EE(Civil)/MBI/TN/2022-23 | 03-02-2023 | 23-02-2023 | Uttarkashi | Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri | Executive Engineer | Electrical work in Dy. General. Manager office building, Field Hostel & Offiers Transit Camp at Maneri Dam Colony, Maneri, Uttarkashi. |
|
318. | 20/EE(Civil)/MBI/TN/2022-23 | 03-02-2023 | 23-02-2023 | Uttarkashi | Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri | Executive Engineer | Annual Electrical work at Maneri Dam Colony, Maneri, Uttarkashi. |
|
319. | 19/EE(Civil)/MBI/TN/2022-23 | 03-02-2023 | 23-02-2023 | Uttarkashi | Executive Engineer (Civil) Maneri Bhali Stage – Ist Maneri | Executive Engineer | Annual maintenance & repair of Maneri Dam Colony, Maneri, Uttarkashi. |
|
320. | 27/UJVNL/EE (M&G)/KPS/2022-23 | 03-02-2023 | 23-02-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | Design Fabrication Integration Testing and Commissioning of Low Voltage Switchgear and Control gear at Kulhal Power Station. |
Corrigendum 1
Corrigendum 2
|
321. | 03/EE/BP/2022-23 | 25-01-2023 | 23-02-2023 | Tehri Garhwal | Executive Engineer, Bhilangna Projects, UJVN Ltd., Ghansali | Executive Engineer | Development of Play Ground at Samangaon, Block-Bhilangna, TehriGarhwal. |
|
322. | 02/EE/BP/2022-23 | 25-01-2023 | 23-02-2023 | Tehri Garhwal | Executive Engineer, Bhilangna Projects, UJVN Ltd., Ghansali | Executive Engineer | Construction of a Computer Class Room & Toilets at Govt. Upper Primary School Samangaon, Block-Bhilangna, TehriGarhwal. |
|
323. | e-17/EE/M&G/DLR/2022-23 | 01-02-2023 | 22-02-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Supply of one number 132/11 kV, 20 MVA Generator Transformer for (3x17 MW) Dhalipur Power Station, Dehradun. |
|
324. | 16/EE/M&G/DLR/2022-23 | 01-02-2023 | 22-02-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | SITC of HV Bushing of 20 MVA , 11/132 KV Generator Transformer of Dhalipur Power Station. |
|
325. | 25/UJVNL/EE (M&G)/KPS/2022-23 | 01-02-2023 | 22-02-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | General Cleaning work at Kulhal Power House for one year. |
|
326. | 24/UJVNL/EE (M&G)/KPS/2022-23 | 01-02-2023 | 22-02-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | Trash Rack Intake Area Cleaning & other Associated work at Kulhal Power House for one year. |
|
327. | 19 /EE(C&M)/MB-II/ Joshiyara/2022-23 | 24-01-2023 | 22-02-2023 | Uttarkashi | Executive Engineer (C&M) MB-IIJoshiyara | Executive Engineer | Emptying of Drainage Sump and cleaning of Sedimentation Gallery No. 02 of Joshiyara Barrage, MB-II, Uttarkashi. |
|
328. | 30/EE/PCM-DKP/TN/2022-23 | 31-01-2023 | 21-02-2023 | Dakpathar | Executive Engineer, Project Civil Maintenance- Dakpathar | Executive Engineer | Civil Repair & Maintenance of stores, workshops, and other non-residential buildings at Dakpathar (Dehradun). |
|
329. | 29/EE/PCM-DKP/TN/2022-23 | 31-01-2023 | 21-02-2023 | Dakpathar | Executive Engineer, Project Civil Maintenance- Dakpathar | Executive Engineer | Civil Repair & Maintenance of CT-Type, P-Type, E-Type and CPT-Type Residences at Dakpathar Colony, Dakpathar (Dehradun). |
|
330. | 16/SPH/2022-23 | 23-01-2023 | 21-02-2023 | Khatima | Executive Engineer (M&G), Sharda Power House, Lohiahead | Executive Engineer | Attending leakages from Top Cover, HV bushing, inspection windows etc. of 40 MVA transformer 1st by application of putty at Sharda Power House, Lohiahead. |
|
331. | 28/2022-23/EE/PCM(GV)/Mayapur | 30-01-2023 | 20-02-2023 | Haridwar | Executive Engineer, PCM(GV), Mayapur | Executive Engineer | Construction of Shed at Janta Inter College, Kamalpur, Sanglakoti, Pauri Garwal. |
|
332. | 27/2022-23/EE/PCM(GV)/Mayapur | 30-01-2023 | 20-02-2023 | Haridwar | Executive Engineer, PCM(GV), Mayapur | Executive Engineer | Providing Chain Link Fencing & Other Misc. Works at Maharishi Dayanand Junior High School, Kherajat, Narsan, Haridwar. |
|
333. | 26/2022-23/EE/PCM(GV)/Mayapur | 30-01-2023 | 20-02-2023 | Haridwar | Executive Engineer, PCM(GV), Mayapur | Executive Engineer | Special Civil M&R Work at Raja Mahendra Pratap Prem Vidyalaya Inter College, Gurukul Narsan, Haridwar. |
|
334. | 17/SPH/2022-23 | 28-01-2023 | 20-02-2023 | Khatima | Executive Engineer (M&G), Sharda Power House, Lohiahead | Executive Engineer | Attending leakages from conservator tank of 40 MVA transformer 1st and procurement of various spares for both 40 MVA, 132/33KV transformers and installations of spares as per scope of work at Sharda Power House, Lohiahead . |
|
335. | 17/EE(M&G)/MPH/2022-23 | 25-01-2023 | 20-02-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan | Executive Engineer | Removal of debris from Trashpit ,forebay and Trashrack of Mohammadpur Power House for one year (excluding canal closure period). |
Corrigendum 1
|
336. | 16/EE(M&G)/MPH/2022-23 | 25-01-2023 | 20-02-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan | Executive Engineer | Supply, Installation, testing & commissioning of 24 nos,12 volt, 65 Ah VRLA, batteries for UPS system of Mohammadpur Power House. |
Corrigendum 1
|
337. | 15/EE(M&G)/MPH/2022-23 | 25-01-2023 | 20-02-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan | Executive Engineer | Testing & Fault rectification work on 66kv switchyard equipment including procurement of 66kv spares at Mohammadpur Power house. |
Corrigendum 1
|
338. | 06/EE(P&C)/2022-23 | 27-01-2023 | 18-02-2023 | Dehradun | Executive Engineer (P&C) Ganga Bhawan | Executive Engineer | Procurement of different Tyres & Tubes for various Power House /Sites vehicles of UJVNL Ltd. |
|
339. | 14/EE(Civil-I)/Guptkashi/2022-23 | 11-01-2023 | 18-02-2023 | Rudraprayag | Executive Engineer (Civil-I), UJVN Limited, Guptkashi | Executive Engineer | Annual maintenance, cleaning and upkeep of UJVNL Office/Field hostel at Kund (Guptkashi) Distt. Rudraprayag. |
|
340. | 10/EE(Maint.)/VP/2022-23 | 27-01-2023 | 17-02-2023 | Dakpathar | Executive Engineer (Maint.), Vyasi Project | Executive Engineer | Hiring of one no. 27 Seater Bus for one year on contract basis for transportation of staff of Vyasi Project, Hathiyari, Dehradun . |
Corrigendum 1
|
341. | 07/EE(GC)/2022-23 | 17-01-2023 | 16-02-2023 | Dehradun | Executive Engineer (Galogi Complex) Ganga Bhawan Yamuna Colony | Executive Engineer | Electrical Rewiring of Residences of UJVN LimitedEmployees/Residences Allotted by UJVN Limited at Yamuna Colony Dehradun. |
|
342. | 11/EE(Civil)/Lohiahead/Khatima/2022-23 | 01-02-2023 | 15-02-2023 | Khatima | Office of the Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima | Executive Engineer | “Repair of damaged and eroded concrete surface of Spiral Casing of UNIT 3 of Sharda Power House at Lohiahead, Khatima |
|
343. | 25/EE(M)/RPSK/2022-23 | 25-01-2023 | 15-02-2023 | Pauri Garhwal | Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh | Executive Engineer | Rewiring and other associated works of erector hostel at Hydel Colony, Kalagarh. |
|
344. | 25/EE(M)/RPSK/2022-23 | 25-01-2023 | 15-02-2023 | Pauri Garhwal | Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh | Executive Engineer | Rewiring and other associated works of erector hostel at Hydel Colony, Kalagarh. |
|
345. | 28/EE/PCM-DKP/TN/2022-23 | 24-01-2023 | 15-02-2023 | Dakpathar | Executive Engineer, PCM-Dakpathar | Executive Engineer | Special repair works of E-Type, P-Type and CPT-Type residences at Dakpathar Colony, Dakpathar, Dehradun. |
|
346. | 27/EE/PCM-DKP/TN/2022-23 | 24-01-2023 | 15-02-2023 | Dakpathar | Executive Engineer, PCM-Dakpathar | Executive Engineer | Special repair works of D-Type, F-Type, FH-Type, CT-Type, LCT-Type residences at Dakpathar Colony, Dakpathar, Dehradun. |
|
347. | 18/EE(M&G)/MPH/2022-23 | 25-01-2023 | 14-02-2023 | Gurukul Narsan -Hardwar | Executive Engineer, (M&G) Mohammadpur Power House | Executive Engineer | Hiring of One non AC Vehicle for SchoolGoing Children and Power house work at Mohammadpur Power House for one year. |
|
348. | 26/EE(G)/CPH/2022-23 | 24-01-2023 | 14-02-2023 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer2 | Hiring of Non AC vehicle with round O-clock driver for emergency duty of Chibro Power House. |
|
349. | 25/EE(G)/CPH/2022-23 | 24-01-2023 | 14-02-2023 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer | Rebabbitting of Guide Bearing Pads (18 Nos.) of 60 MW Generator at Chibro Power House. |
|
350. | 28/EE/PCM/Dhalipur/ 2022-23 | 24-01-2023 | 14-02-2023 | Dehradun | Executive Engineer PCM Dhalipur | Executive Engineer | Cleaning works of Syphons across Power Channel Stage IV during monsoon at Asan Barrage, Kulhal, Dehradun. |
|
351. | 27/EE/PCM/Dhalipur/ 2022-23 | 24-01-2023 | 14-02-2023 | Dehradun | Executive Engineer PCM Dhalipur | Executive Engineer | Special Maintenance and Repair work of Type-I residences of Dhakrani Power House Colony, Dhakrani, Dehradun. |
|
352. | NCB/17/EE(E&M)/MB-II/Barrage/2022-23 | 03-12-2022 | 13-02-2023 | Joshiyara Barrage | (Executive Engineer (E&M),Joshiyara Barrage | Executive Engineer | Design, Manufacturing, Supply, Installation, Testing & Commissioning of Trashrack panels & one no. Hydraulically Operated Movable Trash Rack Cleaning Machine (TRCM) to safely handle rake capacity of 2.0 Tonne as well as log grappler capacity of 2.0 Tonne including dismantling of existing Trash rack panels & TRCM at Joshiyara Barrage, Uttarkashi, Uttarakhand, India |
|
353. | 22/EE (GEN)MB-11/2022-23 | 04-02-2023 | 10-02-2023 | Chinyalisaur | Executive Engineer (Gen.), MB-II | Executive Engineer | Supply, installation, testing & commissioning of 1010 KVA, DG set along with synchronizing panel at MB-II Dharasu Power house. |
|
354. | 18/EE(CM)/DDN/2022-23 | 20-01-2023 | 10-02-2023 | Dehradun | Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony | Civil | Outer Painting & associated repair work in Ganga Bhawan of UJVN Limited at Yamuna Colony, Dehradun. |
|
355. | 26/EE/PCM-DKP/TN/2022-23 | 19-01-2023 | 10-02-2023 | Dakpathar | Executive Engineer, PCM-Dakpathar | Executive Engineer | Special repair work of Vidhyut Bhawan at Dakpathar, Dehradun. |
|
356. | 25/EE/PCM-DKP/TN/2022-23 | 19-01-2023 | 10-02-2023 | Dakpathar | Executive Engineer, PCM-Dakpathar | Executive Engineer | Special repair work of substations, PDD Office, Arakot-Tiyuni Office and Tiyuni Palasu office at Dakpathar, Dehradun. |
|
357. | 11/EE(G)/Klg/2022-23 | 19-01-2023 | 09-02-2023 | Pauri-Garhwal | Executive Engineer (Generation), Ramganga Power Station, Kalagarh | Executive Engineer | Height extension of 02 nos. DG set exhaust pipe lines along with other fabrication works. |
|
358. | 10/EE(Test)/DKN/2022-23 | 19-01-2023 | 09-02-2023 | Dhakrani | Executive Engineer (Test), Dhakrani | Executive Engineer | Servicing of 220/110 Volt battery banks and battery chargers & Provisioning of standby 48 volt DC source for PLCC panels . |
|
359. | 26/EE/PCM/Dhalipur/ 2022-23 | 17-01-2023 | 08-02-2023 | Dehradun | Executive Engineer PCM Dhalipur | Executive Engineer | M&R Work of Power Channel from Silt Ejector Dakpathar to Dhalipur Intake, Dehradun. |
|
360. | 37/EE(Pathri)/2022-23 | 17-01-2023 | 07-02-2023 | Hardwar | Executive Engineer, (M&G) Pathri Power House, Bahadrabad | Executive Engineer | Design, engineering, manufacture, supply, installation, testing and commissioning of Nitrogen gas based Transformer Explosion Prevention and Fire Extinguishing system for 2 No. 12 MVA, 66/11 kV Power Transformers with all fittings, accessories, associated equipment and spares at Pathri Power House. |
|
361. | 24/EE/PCM-DKP/TN/2022-23 | 16-01-2023 | 07-02-2023 | Dakpathar | Executive Engineer, PCM-Dakpathar | Executive Engineer | Repair and maintenance of Saraswati Vidhya Mandir High School at Dakpathar, Dehradun. |
|
362. | 24/EE/PCM-DKP/TN/2022-23 | 16-01-2023 | 07-02-2023 | Dakpathar | Executive Engineer, PCM-Dakpathar | Executive Engineer | Repair and maintenance of Saraswati Vidhya Mandir High School at Dakpathar, Dehradun. |
|
363. | 23/EE/PCM-DKP/TN/2022-23 | 16-01-2023 | 07-02-2023 | Dakpathar | Executive Engineer, Project Civil Maintenance | Civil | Treatment of cracks & seepage in cable gallery of Khodri Power House, Khodri. |
|
364. | 06/EE(E&M-SHP)/KG-I/2022-23 | 12-01-2023 | 07-02-2023 | Guptkashi | Executive Engineer (E&M-SHP), UJVN Ltd., Guptkashi | Executive Engineer | Repair and maintenance of Unit-I of Kaliganga-I, SHP (2x2 MW+15% COL) located in Tehsil Ukhimath, District- Rudraprayag. |
|
365. | 07 /EE (Test)/MB-II/2022-23 | 15-12-2022 | 07-02-2023 | Chinyalisaur | Executive Engineer (Test), Maneri Bhali Stage-II | Executive Engineer | AMC of Computer & IT Equipments & procurement of spares for GM office, DGM office, Account office, Joshiyara Barrage and Dharasu Power House MB-II |
|
366. | 19/2022-23/EE(C)/Pashulok Barrage | 17-01-2023 | 06-02-2023 | Rishikesh | Executive Engineer (Civil), Pashulok Barrage Rishikesh | Civil | Cleaning of Seepage Drain Network Area of Chilla Power Channel. |
|
367. | 24/EE(M)/RPSK/2022-23 | 14-01-2023 | 04-02-2023 | Pauri Garhwal | Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh | Executive Engineer | Annual cleaning and gardening of various offices and central store premises. |
|
368. | 15/SPH/2022-23 | 10-01-2023 | 04-02-2023 | Khatima | Executive Engineer (M&G), Sharda Power House, Lohiahead | Executive Engineer | Annual Operation and upkeeping of residential learning center at Sharda Power House Lohiahead, Khatima. |
|
369. | 25/EE (GEN)/MB-II/2022-23 | 09-01-2023 | 04-02-2023 | Chinyalisaur | Executive Engineer, Generation, Dharasu Power House | Executive Engineer | Procurement of Miscellaneous Consumable items for Generator Maintenance at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
370. | 24/EE (GEN)/MB-II/2022-23 | 09-01-2023 | 04-02-2023 | Chinyalisaur | Executive Engineer (Generation), Maneri Bhali Stage-II | Executive Engineer | Procurement of Communication System Spares for MB-II, Dharasu Power House, Chinyalisaur Uttarkashi. |
|
371. | 23/EE (GEN)/MB-II/2022-23 | 09-01-2023 | 04-02-2023 | Chinyalisaur | Executive Engineer (Generation) Dharasu Power House MB-II | Executive Engineer | ANNUAL MAINTENANCE CONTRACT (AMC) FOR CCTV AND SECURITY RELATED ITEMS AT DIFFERENT LOCATION OF MB-II, DHARASU POWER HOUSE FOR THE PERIOD OF ONE YEAR. |
|
372. | 26/EE (GEN)/MB-II/2022-23 | 09-01-2023 | 04-02-2023 | Chinyalisaur | Executive Engineer (Generation) Dharasu Power House MB-II | Executive Engineer | TESTING OF 220 KV LIGHTNING ARRESTERS THROUGH THIRD HARMONICS RESISTIVE LEAKAGE CURRENT MEASUREMENT AT MB-II DHARASU POWER HOUSE. |
|
373. | 22/EE/PCM-DKP/TN/2022-23 | 12-01-2023 | 03-02-2023 | Dakpathar | Executive Engineer, Project Civil Maintenance- Dakpathar | Executive Engineer | Renovation and modernization of Khodri Power House complex at Khodri. |
|
374. | 23/EE(M)/RPSK/2022-23 | 12-01-2023 | 03-02-2023 | Pauri Garhwal | Executive Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh | Executive Engineer | Annual operation & upkeeping of Erector Hostel and Canteen at Ramganga Power Station, Kalagarh. |
|
375. | 01/DGM(IT)/EE (E&M-I)/2022-23 | 03-01-2023 | 03-02-2023 | Dehradun | EXECUTIVE ENGINEER (E&M-I) “Ujjwal”, IT-Department | Executive Engineer | Rate Contract for Maintenance & Supply work of IT items at various office for UJVN Ltd. located at Dehradun . |
|
376. | 14/SPH/2022-23 | 13-12-2022 | 03-02-2023 | Khatima | Executive Engineer (M&G), Sharda Power House, Lohiahead | Executive Engineer | Design, engineering, manufacture, supply, installation, testing and commissioning of Nitrogen gas based Transformer Explosion Prevention and Fire Extinguishing system for 02X40MVA, 132/33KV, Transformer with all fittings, accessories, associated equipment and spares at 3X13.8 MW at Sharda Power House, Lohiahead, Khatima, Dist. U.S. Nagar (Uttarakhand). |
|
377. | 24e/EE(G)/CPH/2022-23 | 23-12-2022 | 02-02-2023 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer | SITC of 500 kVA, DG set including dismantling of 2*250KW Micro Hydel at Chibro Power House. |
|
378. | 14/EE(M)/2022-23 | 10-01-2023 | 31-01-2023 | Uttarkashi | Executive Engineer (M) Tiloth Power House | Executive Engineer | Hiring of 01 No. 26 + 1 seated, Model 2018 or later bus for Tiloth Power House Uttarkashi. |
|
379. | 10/EE(Civil)/Lohiahead/Khatima/2022-23 | 05-01-2023 | 30-01-2023 | Khatima | Executive Engineer (Civil), UJVN Ltd., Lohiahead Khatima | Civil | Finishing & Development works in newly constructed building of Tara Bal Sanstha at Mundeli, Khatima under CSR. |
|
380. | NCB/17/EE (Civil)/UJVNL/Pashulok Barrage/2022-23. | 30-12-2022 | 30-01-2023 | Rishikesh | Executive Engineer (Civil), UJVNL, Pashulok Barrage | Civil | Construction of New Control Room Building at Virbhadra Barrage, Rishikesh. |
|
381. | 06/EE(E&M-I)/LP/2022-23 | 28-12-2022 | 30-01-2023 | Dakpathar | Executive Engineer (E&M-I), Lakhwar Project | Executive Engineer | Supply & installation of Medium Voltage Line Cover. |
|
382. | 18/2022-23/EE (Civil)/UJVNL/Pashulok Barrage | 07-01-2023 | 28-01-2023 | Rishikesh | Executive Engineer (Civil), UJVNL, Pashulok Barrage | Civil | Annual Civil Maintenance & Repair Works of Virbhadra Barrage at Pashulok, Rishikesh. |
|
383. | 16/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 04-01-2023 | 28-01-2023 | Kalagarh | Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Civil | Providing and Fixing Curtain Rods in Residences at Hydel Colony Kalagarh. |
|
384. | 15/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 04-01-2023 | 28-01-2023 | Kalagarh | Executive Engineer (Civil), UJVN Ltd., Kalagarh, Pauri Garhwal | Civil | Annual M & R Work of Non Residential Buildings at Kalagarh. |
|
385. | 01/EE(Civil-SHP)/Munsyari/2022-23 | 04-01-2023 | 28-01-2023 | Munsyari | Executive Engineer (Civil-SHP), Munsyari | Executive Engineer | Repair and strengthing of headworks of 2X2.5MW Suringad-II SHP. |
|
386. | 24/EEM&G)DKN/2022-23 | 04-01-2023 | 27-01-2023 | Dhakrani | Executive Engineer (M&G) Dhakrani Power House | Executive Engineer | AMC of Mechanical type Governors. |
|
387. | 13/EE(M&G)/MPH/2022-23 | 27-12-2022 | 27-01-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsa | Executive Engineer | SITC of 48 V, 300Ah, VRLA type Battery Bank of Mohammadpur Power House. |
Corrigendum 1
|
388. | 12/EE(M&G)/MPH/2022-23 | 27-12-2022 | 27-01-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsa | Executive Engineer | Annual cleaning & upkeeping of Mohammadpur Power house. |
Corrigendum 1
|
389. | 18/ EE(Civil) / MB-II / Chinyalisaur / 2022-23 | 28-12-2022 | 27-01-2023 | Chinyalisaur | Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Civil | Annual Civil Maintenance work of CP & DP type Residential building at Shaktipuram colony, Chinyalisaur, Uttarkashi. |
Corrigendum 1
|
390. | 17/ EE(Civil) / MB-II / Chinyalisaur / 2022-23 | 28-12-2022 | 27-01-2023 | Chinyalisaur | Executive Engineer (Civil), MB-II, Chinyalisaur (Uttarkashi) | Civil | Annual Civil Maintenance work of AP & BP type Residential & Non Residential building of Shaktipuram colony at Chinyalisaur, Uttarkashi. |
Corrigendum 1
|
391. | 03/2022-23/EE(C-M)Vyasi Project | 11-01-2023 | 25-01-2023 | Dakpathar | Executive Engineer (Civil-Maintenance), Vyasi Project | Executive Engineer | Annual cleaning, Up keeping and Clearing of grass of Steel Store campus at Dakpathar, Dehradun. |
|
392. | 20/EE (GEN)/MB-II/2022-23 | 30-12-2022 | 25-01-2023 | Chinyalisaur | Executive Engineer, Generation, Dharasu Power House | Executive Engineer | Cleaning and removal of wet silt from Cooling line Trench, pits and other areas at MB-II Dharasu Power House. |
|
393. | 22/EE (GEN)/MB-II/2022-23 | 30-12-2022 | 25-01-2023 | Chinyalisaur | Executive Engineer, Generation, Dharasu Power House | Executive Engineer | Supply, installation, testing & commissioning of 1010 KVA, DG set along with synchronizing panel at MB-II Dharasu Power house. |
|
394. | 21/EE (GEN)/MB-II/2022-23 | 30-12-2022 | 25-01-2023 | Chinyalisaur | Executive Engineer, Generation, Dharasu Power House | Executive Engineer | Procurement of 3 phase 11/0.4 kV, 800 KVA Dry type Cast resin Unit auxiliary transformer for MB-II Dharasu Power House. |
|
395. | 36/EE(Pathri)/2022-23 | 27-12-2022 | 25-01-2023 | Hardwar | Executive Engineer, (M&G) Pathri Power House, Bahadrabad | Executive Engineer | Supply of various types of flow meter, Filter regulator & Lubricator and Pressure Switch at Pathri Power House. |
|
396. | 16/ EE(Civil) / MB-II / Chinyalisaur / 2022-23 | 24-12-2022 | 25-01-2023 | Chinyalisaur | Executive Engineer (Civil), MB-II | Civil | Annual Operation and Maintenance of Water Supply System of Power House Complex at Dharasu, Uttarkashi. |
Corrigendum 1
|
397. | 15/ EE(Civil) / MB-II / Chinyalisaur / 2022-23 | 24-12-2022 | 25-01-2023 | Chinyalisaur | Executive Engineer (Civil), MB-II | Civil | Annual Operation and Maintenance of 15 KLD STP based at Dharasu Power House, Dharasu, Uttarkashi. |
Corrigendum 1
|
398. | 02/2022-23/EE(C-M)Vyasi Project | 10-01-2023 | 24-01-2023 | Dakpathar | Executive Engineer (Civil-Maintenance), Vyasi Project | Civil | Annual Cleaning and up keeping of Dam site office (Civil), Vyasi HEP at Juddo Dehradun. |
|
399. | 01/2022-23/EE(C-M)Vyasi Project, Dakpathar | 10-01-2023 | 24-01-2023 | Dakpathar | Executive Engineer (Civil-Maintenance), Vyasi Project | Civil | Cleaning, Upkeeping and other associated works of site office inside Power House complex at Hathiyari, Dehradun. |
|
400. | 02/EE(E&M)/Dharchula/2022-23 | 23-01-2023 | 24-01-2023 | Dharchula | Executive Engineer (E&M), Dharchula | Executive Engineer | Wiring of Transit Hostel at 2x2.5MW Suringad SHP at Munsyari, District Pithoragarh (Uttarakhand) |
|
401. | 11/EE(M&G)/MPH/2022-23 | 27-12-2022 | 24-01-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsan | Executive Engineer | Design, engineering, manufacture, supply, installation, testing and commissioning of Nitrogen gas based Transformer Explosion Prevention and Fire Extinguishing system for 02X8MVA ,66/11KV,Transformers with all fittings, accessories, associated equipment and spares at Mohammadpur Power House. |
Corrigendum 1
|
402. | 14/ EE(Civil) / MB-II / Chinyalisaur / 2022-23 | 23-12-2022 | 24-01-2023 | Chinyalisaur | Executive Engineer (Civil), MB-II | Civil | Hiring of one number M&M Bolero or equivalent Non AC Diesel Vehicle (Model 2021 and onwards) along with driver for E.E.( Civil), MB-II, Chinyalisaur for the period of 12 months. |
|
403. | CH(Maint.)-29/2022-23 | 31-12-2022 | 23-01-2023 | Dakpathar | Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | Replacement of Dewatering pumps Header and associated parts at Chibro. |
|
404. | CH(Maint.)-28/2022-23 | 31-12-2022 | 23-01-2023 | Dakpathar | Executive Engineer (Maint.), Chibro Power Station | Executive Engineer | AMC of various O&M works at different site of Chibro Power Station & Ichari Dam. |
|
405. | 05/EE(P&C)/2022-23 | 29-12-2022 | 23-01-2023 | Dehradun | Executive Engineer (P&C) Ganga Bhawan | Executive Engineer | Procurement of Different Stationery items for various offices of UJVN Ltd. Located at Dehradun. |
|
406. | 10/EE (E&M)/Dakpathar barrage/2022-23 | 23-12-2022 | 23-01-2023 | Dakpathar | Executive Engineer (E&M), Dakpathar barrage | Executive Engineer | Safety audit/Inspection of various equipment of Dakpathar barrage, Distt-Dehradun. |
|
407. | 23e/EE(G)/CPH/2022-23 | 23-12-2022 | 23-01-2023 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer | Supply of Transformer Oil Filtration Machine (5000 LPH) for 69 MVA Generator Transformer at Chibro Power House. |
|
408. | 01/UJVNL/EE(Trg)/Insurance Consultant/2022-23 | 11-11-2022 | 23-01-2023 | Dhakrani | Executive Engineer (Training) | Electrical and Mechanical | Appointment of Insurance Consultant/Composite Broker for risk management of UJVNL. |
Corrigendum 3
|
409. | 22/EE(M)/RPSK/2021-22 | 31-12-2022 | 21-01-2023 | Kalagarh | Engineer (M) Ramganga Power Station, UJVN Limited, Kalagarh, Distt. Pauri Garhwal | Executive Engineer | Annual contract for routing maintenance works. |
|
410. | 47/EEM/2022-23 | 31-12-2022 | 21-01-2023 | Chilla | Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Repairing of safety relief valve, NRV ,Vacuum breaking valve, Servo tube assembly ,Support plates and adjusting bolts /studs ,OCU ,OLU and GOP pumps of Chilla Power House. |
|
411. | 25/2022-23/EE/PCM(GV)/Mayapur | 30-12-2022 | 20-01-2023 | Haridwar | Executive Engineer, PCM(GV), Mayapur | Executive Engineer | Hiring of Diesel Vehicle with Driver for DGM(CM-GV), Mayapur, Haridwar for One Year. |
|
412. | 09/EE (Civil-I)/LMP/2022-23 | 29-12-2022 | 19-01-2023 | Dakpathar | Executive Engineer (Civil-I), Lakhwar Multipurpose Project | Civil | Hiring of one number Ambulance (Maruti Eeco/M&M Bolero/Tata Winger /Force Trax/equivalent model or higher model) along with driver for Lakhwar Project for the period of one year. |
|
413. | 13/EE (Civil-I)/KG-I/2022-23 | 24-12-2022 | 19-01-2023 | Rudraprayag | Executive Engineer (Civil-I), UJVN Limited, Guptkashi | Executive Engineer | Annual Repair & Maintenance work of Civil structures at Kaliganga-I SHP (2x2 MW) in Distt- Rudraprayag. |
|
414. | 08/EE(Test)/MB-11/22-23 | 15-12-2022 | 19-01-2023 | Chinyalisaur | Executive Engineer (Test), Maneri Bhali Stage-ll | Executive Engineer | Procurement of Miscellaneous Items for Dharasu Power House MB-II, Chinyalisaur Uttarkashi. |
|
415. | 08/EE(Test)/DKN/2022-23 | 27-12-2022 | 18-01-2023 | Dhakrani | Executive Engineer (Test), Dhakrani | Executive Engineer | Supply, Installation, and Testing & Commissioning of 48 Volt /20 Amp. Float and float cum boost charger and 48 V/100AH Plant’e Battery Bank for Kulhal Powerhouse. |
|
416. | 41/EE(M)/MB-II/22-23 | 28-12-2022 | 18-01-2023 | Chinyalisaur | Executive Engineer (Maintenance), Maneri Bhali Stage-II | Executive Engineer | Repairing of Air Release Valves of 76 MW Turbine at Dharasu Power House. |
|
417. | 10 /Manager(A&S)/2022-23 | 27-12-2022 | 18-01-2023 | Vasant Vihar | UJJWAL GMS Road ,Dehradun | Civil | Annual Operation, maintenance, cleaning and upkeep of Transit Accommodation at House No. 177/I, Vasant Vihar, Dehradun. |
|
418. | 14/EE(M&G)/MPH/2022-23 | 27-12-2022 | 18-01-2023 | Hardwar | Executive Engineer, (M&G) Mohammadpur Power House, Gurukul Narsa | Executive Engineer | Supply of Logbooks & cartridges at Mohammadpur Power House. |
|
419. | 12/EE(E&M)/Juddo Dam/2022-23 | 26-12-2022 | 18-01-2023 | Dakpathar | Executive Engineer (E&M-1 LWR). Juddo Dam Vyas1 HEP(2x60MW) Juddo. Dakpathar | Executive Engineer | Supply. Installation, testing and commissioning of Automatic Early Warning System (EWS) for Juddo Dam. |
|
420. | e-10/EE/M&G/DLR/2022-23 | 06-12-2022 | 18-01-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Dhalipur | Supply of one number 132/11 kV, 20 MVA Generator Transformer for (3x17 MW) Dhalipur Power Station, Dehradun. |
|
421. | 46/EEM/2022-23 | 27-12-2022 | 17-01-2023 | Garhwal | Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Supply of miscellaneous spare parts for units of Chilla Power House. |
|
422. | 45/EEM/2022-23 | 27-12-2022 | 17-01-2023 | Garhwal | Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Repairing works of 410mm globe & 150mm gate valves at Chilla Power House. |
|
423. | 06/EE(Civil-II)/LMP/2022-23 | 28-12-2022 | 17-01-2023 | Dakpathar | Executive Engineer (Civil-II) Lakhwar Multipurpose Project, Lakhwar Bhawan | Civil | Construction of Boundary Wall & Site Clearance work for Proposed Type B Residential Building Site for Lakhwar Project at Tons Colony, Dakpathar. |
|
424. | 24/2022-23/EE/PCM(GV)/Mayapur | 26-12-2022 | 16-01-2023 | Haridwar | Executive Engineer, PCM(GV), Mayapur | Executive Engineer | Annual Horticulture Upkeeping & Sweeping Cleaning Work of Chilla Power House Premises at Chilla. |
|
425. | 23/2022-23/EE/PCM(GV)/Mayapur | 26-12-2022 | 16-01-2023 | Haridwar | Executive Engineer, PCM(GV), Mayapur | Executive Engineer | Providing Stone Pitching at Right Bank of TRC of Mohammadpur Power House. |
|
426. | 22/2022-23/EE/PCM(GV)/Mayapur | 26-12-2022 | 16-01-2023 | Haridwar | Executive Engineer, PCM(GV), Mayapur | Executive Engineer | Repair of Main Gate & Guard Hut of Mohammadpur Power House. |
|
427. | 21/2022-23/EE/PCM(GV)/Mayapur | 26-12-2022 | 16-01-2023 | Haridwar | Executive Engineer, PCM(GV), Mayapur | Executive Engineer | Annual M&R Work of Road from Chilla Power House to Bhimgoda Barrage. |
|
428. | 13/EE(E&M)/Virbhadra barrage/2022-23 | 24-12-2022 | 16-01-2023 | Executive Engineer | Executive Engineer (E&M), Virbhadra barrage, Pashulok | Civil | Design, Engineering, Supply, Installation, Commissioning and testing of online Discharge monitoring system (Non-Contact Type), All weather System & Water Level Recording and Integration of these system with EWS at control room of Virbhadra Barrage, Pashulok, Rishikesh. |
Corrigendum 2
|
429. | 16/2022-23/EE(Civil)/UJVNL/Pashulok Barrage | 26-12-2022 | 16-01-2023 | Rishikesh | Executive Engineer (Civil), UJVNL, Pashulok Barrage | Civil | Renovation of Bituminous Road along with interlocking Tiles Work of A-Type Residences Road of Barrage Colony at Rishikesh. |
|
430. | 09/EE(E&M)/ICHARI/TN/2022-23 | 22-12-2022 | 16-01-2023 | Ichari | Executive Engineer, (E&M) Ichari dam | Executive Engineer | Design, Engineering, Supply, Installation, Testing and Commissioning of EWS with AWS for Ichari Dehradun Uttarakhand. |
Corrigendum 1
Corrigendum 2
|
431. | 18/EE(E&M)/MB-II/Barrage/2022-23 | 17-12-2022 | 16-01-2023 | Joshiyara Barrage | Executive Engineer (E&M),MB-II,Joshiyara Barrage | Executive Engineer | Design, Engineering, Supply, Installation, Testing and Commissioning of Automatic Early Warning System (EWS) for Joshiyara barrage, Uttarkashi. |
|
432. | 04/EE(E&M)/Maneri Dam/2022-23 | 17-12-2022 | 16-01-2023 | Maneri | Executive Engineer (E&M), Maneri Dam | Executive Engineer | Supply, Installation, testing and commissioning of Automatic Early Warning System (EWS) for Maneri Dam. |
|
433. | 04 /EE(P&C)/2022-23 | 14-12-2022 | 16-01-2023 | Dehradun | Executive Engineer (P&C) Ganga Bhawan | Executive Engineer | Procurement of different Tyres & Tubes for various Power House /Sites vehicles of UJVNL Ltd. |
|
434. | e-NIT/09/EE (E&M)/Asan Barrage/2022-23 | 23-12-2022 | 14-01-2023 | Dhakrani | Executive Engineer (E&M), Asan Barrage, Jal Shakti Bwawan | Executive Engineer | Supply, Installation, Testing and commissioning of Early Warning System (EWS) for Asan Barrage. |
Corrigendum 2
|
435. | NCB/08/EE (E&M)/Asan Barrage/ 2022-23 | 06-12-2022 | 14-01-2023 | Dhakrani | Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan | Executive Engineer | Protective coating on spillway gates & HR gates |
|
436. | 21/EE/PCM-DKP/TN/2022-23 | 23-12-2022 | 13-01-2023 | Dakpathar | Executive Engineer, Project Civil Maintenance- Dakpathar | Executive Engineer | Civil Repair & Maintenance of B-Type Residences of Tons Colony at Dakpathar (Dehradun). |
|
437. | e-18/UJVNL/EE (M&G)/KPS/2022-23 | 23-11-2022 | 13-01-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | Refurbishment of 12.5 MVA 6.6/132 kV Generator Transformer of Unit B at Kulhal Power Station. |
|
438. | 35/EE(Pathri)/2022-23 | 20-12-2022 | 11-01-2023 | Hardwar | Executive Engineer, (M&G) Pathri Power House, Bahadrabad | Executive Engineer | Operation & Maintenance works of Trash Rack Cleaning Machine of Power House. |
|
439. | 34/EE(Pathri)/2022-23 | 20-12-2022 | 11-01-2023 | Hardwar | Executive Engineer, (M&G) Pathri Power House, Bahadrabad | Executive Engineer | Removal of Debris from Intake of Power House. |
|
440. | 23/UJVNL/EE(M&G)/KPS/2022-23 | 19-12-2022 | 11-01-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | Hiring of one no.(28 seater) School Bus Model 2020 or later for academic session 2022-23 for one year on contract basis for transportation of school going children of Hydel Colony, Kulhal Power station, Kulhal. |
|
441. | 21/EE(M)/RPSK/2022-23 | 10-12-2022 | 11-01-2023 | Kalagarh | Executive Engineer (M) Ramganga Power Station | Executive Engineer | Repair and servicing of 2 nos. 125/25 Ton EOT cranes. |
|
442. | 22e/EE(G)/CPH/2022-23 | 08-12-2022 | 11-01-2023 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer | SITC of Mulsifier System with all accessories including dismantling at Chibro Power House. |
|
443. | 21/EE(G)/CPH/2022-23 | 08-12-2022 | 11-01-2023 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer | Testing of oil for 4*69 MVA Transformers at Chibro Power House. |
|
444. | NIT-36/EE(M)/MB-11/22-23 | 02-12-2022 | 11-01-2023 | Chinyalisaur | Executive Engineer (Maintenance), Maneri Bhall Stage- IL | Executive Engineer | Engagement of Underwater Diving Team with camera unit for recovery of runner cone from TRC and other works at Dharasu power House M.B-Il, Uttarkashi. |
|
445. | 44/EEM/2022-23 | 20-12-2022 | 10-01-2023 | Chilla | Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | O&M work of clean water pumping station and AMC of plumbing related works at project colony chilla. |
|
446. | 43/EEM/2022-23 | 20-12-2022 | 10-01-2023 | Chilla | Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Hiring of 01 No. diesel driven ambulance vehicle along with driver for 12 months for Chilla Project Colony . |
|
447. | e-NIT/09/EE (E&M)/Dakpathar Barrage/2022-23 | 20-12-2022 | 10-01-2023 | Dakpathar | Executive Engineer (E&M), Dakpathar Barrage | Executive Engineer | Design, Engineering, Supply, Installation of Non-Contact Type Discharge/EWS monitoring system for Dakpathar Barrage. |
Corrigendum 3
|
448. | 05/EE(E&M-I)/LP/2022-23 | 20-12-2022 | 10-01-2023 | Dakpathar | Executive Engineer (E&M-I), Lakhwar Project | Executive Engineer | Supply & installation of meters. |
|
449. | 12/EE (Civil-I)/Guptkashi/2022-23 | 16-12-2022 | 10-01-2023 | Rudraprayag | Executive Engineer (Civil-I) SHP | Civil | Hiring of one number Light diesel Pool vehicle Mahindra & Mahindra Bolero (Non - AC) or equivalent with driver for one year on rent basis under O/o Executive Engineer (Civil-I) SHP, Guptkashi in District- Rudraprayag. |
|
450. | 09/EE (E&M-II LWR)/VP/2022-23 | 13-12-2022 | 10-01-2023 | Dakpathar | Executive Engineer (E&M –II LWR), Vaysi Project | Executive Engineer | Annual Running & routine Maintenance of 05 KLD MBBR based technology Sewage Treatment Plant (STP), at Dam site Juddo, Dakpatthar (Dehradun). |
|
451. | 08/EE(E&M)/ICHARI/TN/2022-23 | 01-12-2022 | 10-01-2023 | Dakpathar | Executive Engineer (E&M), Ichari Dam | Executive Engineer | Safety audit of tools & equipments at Ichari Dam in district Dehradun |
|
452. | PDD-11/2022-23 | 17-12-2022 | 09-01-2023 | Dakpathar | Executive Engineer, Project Distribution Division, Dakpathar (D.Dun) | Executive Engineer | Supply of CO2 fire extinguishersx |
|
453. | 14/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 09-12-2022 | 09-01-2023 | Pauri Garhwal | Executive Engineer (Civil), UJVN Ltd., Kalagarh | Civil | M&R Work of verandah closing and provision of Kitchen in Type Ist Residences at hydel colony kalagarh. |
|
454. | 17/EE(CM)/DDN/2022-23 | 17-12-2022 | 07-01-2023 | Dehradun | Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony | Civil | Repairing of Boundary wall at residential Building T-33 & T-35 of Type-IV of UJVN Ltd at yamuna colony, Dehradun. |
|
455. | 16/EE(CM)/DDN/2022-23 | 17-12-2022 | 07-01-2023 | Dehradun | Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony | Civil | M&R work of type II (P-II & S.B.C) Residences of UJVN Limited at Yamuna Colony, Dehradun. |
|
456. | 15/EE(CM)/DDN/2022-23 | 17-12-2022 | 07-01-2023 | Dehradun | Executive Engineer (Civil-Maintenance), Yamuna Bhawan, Yamuna Colony | Civil | M&R work of Type IV residences of UJVN Limited at Yamuna Colony, Dehradun. |
|
457. | 11/EE(Civil-I)/Galogi/2022-23 | 13-12-2022 | 07-01-2023 | Rudraprayag | Executive Engineer (Civil-I), Guptkashi, | Civil | Annual Repair & Maintenance work of Civil structures at Galogi SHP 3.5 MW in Distt- Dehradun |
|
458. | 20/EE/PCM-DKP/TN/2022-23 | 16-12-2022 | 06-01-2023 | Dakpathar | Executive Engineer, PCM-Dakpathar | Executive Engineer | Repair of drain in front of switchyard at Khodri Power House, Khodri (Dehradun). |
|
459. | 11/EE(E&M-II, LWR)VP/2022-23 | 15-12-2022 | 05-01-2023 | Dakpathar | Executive Engineer-II (EM-LWR), Vyasi Project | Executive Engineer | Replacement 0f Orifice Radial Gate Rubber Seals at Juddo Dam, Vyasi HEP (2 X 60MW). |
|
460. | 15/EE/M&G/DLR/2022-23 | 13-12-2022 | 05-01-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Annual Repair/Maintenance work (Electrical) of Unit-B of hydro generators at Dhalipur Power Station. |
|
461. | 14/EE/M&G/DLR/2022-23 | 13-12-2022 | 05-01-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Rebabbiting of UGB and LGB of Unit “B” of Dhalipur Power Station. |
|
462. | 13/EE/M&G/DLR/2022-23 | 13-12-2022 | 05-01-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Repairing and Over hauling of Various size Gate valves of Unit “B” of Dhalipur Power Station. |
|
463. | 12/EE/M&G/DLR/2022-23 | 13-12-2022 | 05-01-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Annual Maintenance of Hydro-Mechanical Part of Unit-B of Dhalipur Power Station. |
|
464. | 11/EE/M&G/DLR/2022-23 | 13-12-2022 | 05-01-2023 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Annual Cleaning and up-keeping of Dhalipur Power Station. |
|
465. | 25/EE (GEN)/MB-II/2022-23 | 09-01-2023 | 04-01-2023 | Chinyalisaur | Executive Engineer, Generation, Dharasu Power House | Executive Engineer | Procurement of Miscellaneous Consumable items for Generator Maintenance at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
466. | 19/EE/PCM-DKP/TN/2022-23 | 13-12-2022 | 04-01-2023 | Dakpathar | Executive Engineer, PCM-Dakpathar | Executive Engineer | Civil Maintenance & Repair works of Dakpathar Barrage, Dakpathar, Dehradun. |
|
467. | 40/EE(M)/MB-II/22-23 | 13-12-2022 | 04-01-2023 | Chinyalisaur | Executive Engineer (Maintenance), Maneri Bhali Stage-II | Executive Engineer | Repairing of MIV, bypass valve and seal valve operating system and their actuators at Dharasu Power House, MB-II, Uttarkashi. |
|
468. | 03/EE(Civil)/AT/2022-23 | 30-11-2022 | 04-01-2023 | Dakpathar | Executive Engineer (Civil), Arakot-Tiuni | Civil | Drilling for Geo -Technical Investigations At Arakot- Tiuni HEP in District -Uttarkashi, Uttarakhand. |
|
469. | 15/EE(E&M)/MB-II/Barrage/2022-23 | 23-11-2022 | 04-01-2023 | Joshiyara | Executive Engineer (E&M), Joshiyara Barrage | Executive Engineer | Remote Operation of F.C. Gates and Sirens at Joshiyara Barrage Uttarkashi. |
|
470. | 10/EE (E&M-II LWR)/VP/2022-23-23 | 13-12-2022 | 03-01-2023 | Dakpathar | Executive Engineer (E&M –II LWR), Vaysi Project | Executive Engineer | AMC of 500 KVA DG set Juddo Dam site, Vyasi HEP (2x60 MW), Dakpathar. |
|
471. | 08/EE (E&M-II LWR)/VP/2022-23-23 | 13-12-2022 | 03-01-2023 | Dakpathar | Executive Engineer (E&M –II LWR), Vaysi Project | Executive Engineer | Hiring of One No. Non-AC Diesel Vehicle along with Driver (Mahindra Bolero or equivalent) for Vyasi Project Juddo Dam Site for a period of One year. |
|
472. | 21/UJVNL/EE(M&G)/KPS/2022-23 | 13-12-2022 | 03-01-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | Procurement and testing of Generator Rotor Pole coil at Kulhal Power station. |
|
473. | 20/UJVNL/EE(M&G)/KPS/2022-23 | 13-12-2022 | 03-01-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | Refilling of fire extinguisher & other miscellaneous fire equipment related work at Kulhal Power station. |
|
474. | 19/UJVNL/EE(M&G)/KPS/2022-23 | 13-12-2022 | 03-01-2023 | Kulhal | Executive Engineer (M&G) Kulhal Power Station | Executive Engineer | Gardening and Switchyard cleaning work at Kulahal Power Station |
|
475. | 23/EE(M&G)/DKN/2022-23 | 13-12-2022 | 03-01-2023 | Dhakrani | EE (M&G), Dhakrani Power Station | Executive Engineer | Hiring One no. Non A.C private Jeep along with Driver for insurance and training work for one year. |
|
476. | 39/EE (M)/MB-11/2022-23 | 10-12-2022 | 31-12-2022 | Chinyalisaur | Executive Engineer (Maintenance), Maneri Bhali Stage-II | Executive Engineer | Protective Coating of underwater parts of turbine of Dharasu Power House Uttarkashi. |
|
477. | 33/EE(Pathri)/2022-23 | 09-12-2022 | 31-12-2022 | Hardwar | Executive Engineer, (M&G) Pathri Power House, Bahadrabad, Hardwar | Executive Engineer | Hiring of vehicles for school going children of Pathri Power House Colony. |
|
478. | 19/EE (GEN)/MB-II/2022-23 | 08-12-2022 | 31-12-2022 | Chinyalisaur | Executive Engineer, Generation, Dharasu Power House | Executive Engineer | Procurement of generation log book and stationary items for Dharasu Power House. |
|
479. | PDD-10/2022-23 | 09-12-2022 | 30-12-2022 | Dakpathar | Executive Engineer, Project Distribution Division, Dakpathar | Executive Engineer | Annual contract for Repairing & Rewiring of Dakpathar Residential Colonies . |
|
480. | 20/EE(G)/CPH/2022-23 | 08-12-2022 | 30-12-2022 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer | Printing of various log books and supply of cartridges & stationary at Chibro Power Station. |
|
481. | 38/EE(M)/MB-11/22-23 | 08-12-2022 | 29-12-2022 | Chinyalisaur | Executive Engineer (Maintenance). Maneri Bhali Stage- II | Executive Engineer | Hiring of One No. (6+1) Seater (Mahindra/Tata/equivalent) non A.C. Diesel vehicle along with driver. |
|
482. | 37/EE(M)/MB-11/22-23 | 08-12-2022 | 29-12-2022 | Chinyalisaur | Executive Engineer (Maintenance). Maneri Bhali Stage- II | Executive Engineer | Procurement of MIV Spares at Dharasu power House M.B-11, Uttarkashi. |
|
483. | 19/EE(G)/CPH/2022-23 | 07-12-2022 | 28-12-2022 | Chibro | Executive Engineer (Generation) Chibro Power House | Executive Engineer | Hiring the 1 No. Non-AC vehicle (Bolero or equivalent) along with driver for Executive Engineer (Gen), Chibro Power House. |
|
484. | 18/EE/PCM-DKP/TN/2022-23 | 06-12-2022 | 28-12-2022 | Dakpathar | Executive Engineer, PCM-Dakpathar | Executive Engineer | Civil Maintenance & Repair works of A-Type, LA-Type & P-IV-Type Residences at Dakpathar Colony, Dakpathar, Dehradun. |
|
485. | 10/EE(Test)/DKP/2022-23 | 06-12-2022 | 28-12-2022 | Dakpathar | Executive Engineer (Test) Vidyut Bhawan, Dakpathar, | Executive Engineer | Replacement of Generator CTs in machines at Khodri Power Station. |
|
486. | 09/EE(Test)/DKP/2022-23 | 06-12-2022 | 28-12-2022 | Dakpathar | Executive Engineer (Test) Vidyut Bhawan, Dakpathar, | Executive Engineer | Annual Maintenance and testing activities of all four 4x60MW Chibro Power House units. |
|
487. | 08/EE(Test)/DKP/2022-23 | 06-12-2022 | 28-12-2022 | Dakpathar | Executive Engineer (Test) Vidyut Bhawan, Dakpathar, | Executive Engineer | Supply and Installation of slave Display for Frequency and Voltage at Chibro and Khodri Power House. |
|
488. | 07/EE(Test)/DKP/2022-23 | 06-12-2022 | 28-12-2022 | Dakpathar | Executive Engineer (Test) Vidyut Bhawan, Dakpathar, | Executive Engineer | Calibration services of Measuring instruments and meters for Test Unit. |
|
489. | 04/EE(Civil)/AT/2022-23 | 05-12-2022 | 28-12-2022 | Dakpathar | Executive Engineer (Civil), Arakot-Tiuni, UJVNLtd., Dakpathar (Dehradun), | Civil | Drifting for Geotechnical investigations at Arakot- Tiuni HEP in District -Uttarkashi, Uttrakhand. |
|
490. | CH (Maint.)-27/2022-23 | 06-12-2022 | 27-12-2022 | Chibro | Executive Engineer (Maint.), Chibro Power Station, invites online bids from interested parties. | Executive Engineer (Maint.) | Procurement of Spares for 60 |
|
491. | 12/EE(E&M)/PB/2022-23 | 05-12-2022 | 27-12-2022 | Rishikesh | Executive Engineer (E&M), Pashulok Barrage, Rishikesh | Executive Engineer | Hiring of Light diesel vehicle non AC (Mahindra & Mahindra Bolero) or equivalent with driver for a period of 12 months for EE (E&M), Virbhadra Barrage, Pashulok Rishikesh. |
|
492. | 10/EE (Civil-I)/KG-II/2022-23 | 03-12-2022 | 27-12-2022 | Rudraprayag | Executive Engineer (Civil-I),Guptkashi, Rudraprayag | Executive Engineer | Annual Repair & Maintenance work of Civil structures at Kaliganga-II SHP (2x2.25 MW) in Distt- Rudraprayag. |
|
493. | CH (Maint.) - 26/2022-23 | 03-12-2022 | 26-12-2022 | Dakpathar | Executive Engineer (Maint.), Chibro Power Station, Dakpathar | Executive Engineer | Annual Maintenance Works of Unit No. #1 at Chibro Power Station. |
|
494. | 08/EE(E&M)(SHP)/Rishikesh/2022-23 | 25-11-2022 | 26-12-2022 | Rishikesh | Executive Engineer (E&M) SHP | Executive Engineer | Refilling of Fire Extinguisher Cylinders at Pilangad SHP, District Uttarkashi, Urgam SHP, District Chamoli and RPN SHP Dunao, District Pauri Garhwal . |
|
495. | 04/UJVNL/IT/EE(EM)/2022-23 | 10-12-2022 | 24-12-2022 | Dehradun | Executive Engineer (E&M-II), IT department | Executive Engineer | Miscellaneous work at Server Room of New Corporate Building of UJVN Ltd., Dehradun. |
|
496. | CH(Maint.)-25/2022-23 | 30-11-2022 | 22-12-2022 | Dakpathar | Executive Engineer, Maint., Chibro | Executive Engineer | Replacement of guide shoes and repair of charging valves of surge tank gates at Chibro Power Station. |
|
497. | 06/EE(E&M)/ICHARI/TN/2022-23 | 23-11-2022 | 22-12-2022 | Dakpathar | Executive Engineer | Executive Engineer | Providing & fixing of Main gate board and other sign board for Ichari Dam |
|
498. | 05/EE(E&M)/ICHARI/TN/2022-23 | 23-11-2022 | 22-12-2022 | Dakpathar | Executive Engineer | Executive Engineer | Hiring of one number non-AC diesel vehicle (6+1-seater) such as Mahindra Bolero or equivalent with driver (Excluding cost of fuel) for one year for Emergency & Shift duty in Ichari Dam. |
|
499. | NCB-23/EE/PCM/Dhalipur/ 2022-23 | 17-11-2022 | 22-12-2022 | Dhalipur | Executive Engineer PCM | Civil | Refurbishment of left bank inspection road of Asan Barrage reservoir |
|
500. | 42/EEM/2022-23 | 30-11-2022 | 21-12-2022 | Chilla | Executive Engineer, Maintenance Chilla (Pauri- Garhwal) | Executive Engineer | Re-Babbiting and machining of one set TGB pad of Power House. |
|
501. | 09/EE/M&G/DLR/2022-23 | 30-11-2022 | 21-12-2022 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | Refurbishment of 140/30 Tones capacity Litostroj make EOT crane of Dhalipur Power Station. |
|
502. | 13/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 26-11-2022 | 21-12-2022 | Kalagarh | Executive Engineer (Civil) | Civil | Treatment of Leakage in Switch Yard Area at Ramganga Power House Kalagarh. |
|
503. | 12/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 26-11-2022 | 21-12-2022 | Kalagarh | Executive Engineer (Civil) | Civil | Construction of Oil Barrel platform and other misc. Civil works at central store Kalagarh. |
|
504. | 08/EE/M&G/DLR/2022-23 | 27-11-2022 | 20-12-2022 | Dhalipur | Executive Engineer (M&G) Dhalipur Power House | Executive Engineer | AMC for Colony Electrical works, Including Operation & Maintenance of Colony Tube well. |
|
505. | 25/EE/PCM/Dhalipur/ 2022-23 | 28-11-2022 | 20-12-2022 | PCM Dhalipur | Executive Engineer PCM Dhalipur | Executive Engineer | Repair and Maintenance of Bund and other miscellaneous work at various location along power channel Dhalipur, Dehradun |
|
506. | 13/EE(M)/2022-23 | 13-12-2022 | 19-12-2022 | Uttarkashi | Executive Engineer (Maintenance) Tiloth Power House | Executive Engineer | Different maintenance activities of MIVs of Tiloth Power House. |
|
507. | 12/EE(M)/2022-23 | 28-11-2022 | 19-12-2022 | Executive Engineer (M) | Executive Engineer (M) Tiloth Power House | Executive Engineer | Hiring of 01 no. non AC diesel vehicle. |
|
508. | 18/EE(Civil)/MB-I/TN/2022-23 | 21-11-2022 | 19-12-2022 | Civil | Executive Engineer (Civil) MB-I, Maneri | Civil | Replacement of old Roof of P-II Type Residences of Tiloth Colony, Uttarkashi. |
|
509. | 07/EE(Generation)/Vyasi/2022-23 | 17-11-2022 | 19-12-2022 | Vyasi | Executive Engineer (Generation) | Electrical and Mechanical | Supply, Installation, Testing and Commissioning of Telephone Network cabling at Vyasi Power Station (2 x 60MW), Hathiyari |
|
510. | 11/EE(M)/2022-23 | 26-11-2022 | 17-12-2022 | Tiloth Power House | Executive Engineer (Maintenance) Tiloth Power House | Executive Engineer (Maintenance) | Repair & maintenance of 33 KV transmission line between Tiloth & Heena substation. |
|
511. | 10/EE(M)/2022-23 | 26-11-2022 | 17-12-2022 | Tiloth Power House | Executive Engineer (Maintenance) Tiloth Power House | Executive Engineer (Maintenance) | Annual Operation and maintenance of water supply from tube well plant to CWR Tiloth and CWR Tiloth to Kuteti Devi Colony. |
|
512. | 07/EE(E&M)/AB/2022-23 | 25-11-2022 | 16-12-2022 | Executive Engineer (E&M) | Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani | Executive Engineer (E&M) | AMC of HM gates |
|
513. | 06/EE(E&M)/AB/2022-23 | 25-11-2022 | 16-12-2022 | Executive Engineer (E&M) | Executive Engineer (E&M), Asan Barrage, Jal Shakti Bhawan, Dhakrani | Executive Engineer (E&M) | Hiring of 01 nos. non-AC diesel vehicles |
|
514. | 17/EE/PCM-DKP/TN/2022-23 | 25-11-2022 | 16-12-2022 | Dakpathar | Executive Engineer, PCM-Dakpathar | Civil | Upkeep Works Related to Dakpathar Barrage at Dakpathar (Dehradun). |
|
515. | 24/EE/PCM/Dhalipur/ 2022-23 | 23-11-2022 | 16-12-2022 | Dehradun | Executive Engineer PCM Dhalipur | Executive Engineer | M&R of Asan Barrage, Power Channel and other appurtenant structures at Dhalipur, Dehradun |
|
516. | e- 17/UJVNL/EE (M&G)/KPS/2022-23 | 15-11-2022 | 16-12-2022 | Kulhal | Executive Engineer (M&G) | Electrical and Mechanical | Major overhauling and repair of Unit-A of Kulhal Power Station (3X10 MW) |
|
517. | E-CH (MAINT.) - 24/2022-23 | 17-11-2022 | 16-12-2022 | Dakpathar | E.E.-Maintenance | Electrical and Mechanical | Capital Maintenance Work of 60 MW Hydro Turbine, Generator and Associated Equipments of Unit # 3 |
|
518. | 18/EE(C&M)/MB-II/Joshiyara/2022-23 | 22-11-2022 | 15-12-2022 | Joshiyara | Executive Engineer (C&M) MB-II Joshiyara | Executive Engineer (C&M) | Construction of drain in Joshiyara Parking area in front of Bhagirathi Palace Hotel, at MB-II, Joshiyara, Uttarkashi. |
|
519. | 17/EE(C&M)/MB-II/Joshiyara/2022-23 | 22-11-2022 | 15-12-2022 | Joshiyara | Executive Engineer (C&M) MB-II Joshiyara | Executive Engineer (C&M) | Landscaping, fencing and miscellaneous civil works at right side of Joshiyara barrage reservoir of MB-II project near Mankarnika ghat, in Uttarkashi. |
|
520. | 16/EE(C&M)/MB-II/Joshiyara/2022-23 | 22-11-2022 | 15-12-2022 | Joshiyara | Executive Engineer (C&M) MB-II Joshiyara | Executive Engineer (C&M) | Boring, supply and installation of 01 No. Tube well at D/S of Joshiyara Barrage at MB-II, Uttarkashi. |
|
521. | 09/EE(E&M-II)/VP/2022-23 | 23-11-2022 | 14-12-2022 | Dakpathar | Executive Engineer(E&M -II), Vyasi Project | Executive Engineer | Annual maintenance work of turbine and its accessories equipments of Unit-1 & 2 of Vyasi Project, Hathiyari |
|
522. | 16/EE(E&M)/MB-II/Barrage/2022-23 | 23-11-2022 | 14-12-2022 | Joshiyara | Executive Engineer (E&M), Joshiyara Barrage | Executive Engineer (E&M) | Roadway Lighting Work at Joshiyara Barrage, Uttarkashi. |
|
523. | 07/EE(E&M)/ICHARI/TN/2022-23 | 23-11-2022 | 14-12-2022 | Dakpathar | Executive Engineer | Executive Engineer | Re-filling of fire extinguisher installed at Ichari Dam. |
|
524. | 10/EE(IC&CM)/2022-23 | 22-11-2022 | 14-12-2022 | Dehradun | EE(IC&CM) Ganga Bhawan, Yamuna Colony | EE(IC&CM) | Valuation of scrap material lying at Tiloth Power House, Uttarkashi, Central store Kalagarh and Joshiyara Barrage Uttarkashi of UJVN Ltd. |
|
525. | 03/EE(E&M)/Maneri Dam/2022-23 | 21-11-2022 | 13-12-2022 | Maneri | Executive Engineer | Executive Engineer | Annual operation and routine maintenance contract of Sirror Irrigation lift scheme at Heena, Uttarkashi |
|
526. | 02/EE(E&M)/Maneri Dam/2022-23 | 21-11-2022 | 13-12-2022 | Maneri | Executive Engineer (E&M) | Executive Engineer | Annual Routine Maintenance (ARM) of Hydro-Mechanical and Electro-Mechanical equipment of Maneri Dam, Maneri Uttarkashi. |
|
527. | 12/EE(G)TPH/2022-23 | 12-11-2022 | 13-12-2022 | Uttarkashi | E.E.-Generation | Electrical and Mechanical | Procurement of Stationery |
|
528. | 11/EE(G)TPH/2022-23 | 12-11-2022 | 13-12-2022 | Uttarkashi | E.E.-Generation | Electrical and Mechanical | Procurement of license free wireless communication system. |
|
529. | 09/EE(Civil)/Lohiahead/Khatima/2022-23 | 16-11-2022 | 12-12-2022 | Khatima | Executive Engineer (Civil) | Civil | Repair and maintenance of road from Sukhapul to Polyplex at Lohiahead Khatima |
|
530. | 17/EE(Civil)/MB-I/TN/2022-23 | 19-11-2022 | 09-12-2022 | Civil | Executive Engineer (Civil) MB-I, Maneri | Maneri | Civil Maintenance & repair of Various type of residences at Kuteti Devi Colony, Uttarkashi. |
|
531. | 16/EE/PCM-DKP/TN/2022-23 | 18-11-2022 | 09-12-2022 | Dakpathar | Executive Engineer, Project Civil Maintenance | Civil | Civil Maintenance & Repair of Chibro Power House and its associated structures. |
|
532. | 06/EE(Generation)/Vyasi/ 2022-23 | 17-11-2022 | 09-12-2022 | Dakpathar | Executive Engineer (Generation) | Electrical and Mechanical | Annual Maintenance of 60MW Generators and associated equipment of Unit # 1 &2 of Vyasi Power Station (2 x 60MW), Hathiyari |
|
533. | 15/2022-23/EE(C)/Pashulok Barrage | 17-11-2022 | 08-12-2022 | Rishikesh | Executive Engineer (Civil) | Civil | Operation and Maintenance of UJVNL Officer Transit Camp and Office of General Manager (SHP) at Maneri Bhali-II Colony, Rishikesh. |
|
534. | 14/2022-23/EE(C)/Pashulok Barrage | 17-11-2022 | 08-12-2022 | Rishikesh | Executive Engineer (Civil) | Civil | Roof Treatment, Painting Work & Other Misc. Civil Works of Office of the GM (CDH&NP) at Pashulok, Rishikesh. |
|
535. | 13/2022-23/EE(C)/Pashulok Barrage | 17-11-2022 | 08-12-2022 | Rishikesh | Executive Engineer (Civil) | Civil | Annual Upkeep and Horticulture Works of Virbhadra Barrage Premises & Office at Rishikesh. |
|
536. | 13/ EE(Civil) / MB-II / Chinyalisaur / 2022-23 | 16-11-2022 | 08-12-2022 | Uttarkashi | Executive Engineer (Civil) | Civil | Painting and Distempering work of Power House building and its associated structure at Dharasu Power House, MB-II HEP, Uttarkashi. |
|
537. | 20/2022-23/EE/PCM(GV)/Mayapur | 16-11-2022 | 07-12-2022 | Haridwar | Executive Engineer, PCM(GV) | Civil | Annual M&R Work of Type-III & IV Residences at Chilla Colony for the year 2022-23. |
|
538. | 19/2022-23/EE/PCM(GV)/Mayapur | 16-11-2022 | 07-12-2022 | Haridwar | Executive Engineer, PCM(GV) | Civil | Annual M&R Work of Chilla Power House at Chilla for the Year 2022-23. |
|
539. | 15/EE/PCM-DKP/TN/2022-23 | 15-11-2022 | 07-12-2022 | Dakpathar | Executive Engineer | Civil | Civil Maintenance & Repair of Khodri Power House and its associated structures. |
|
540. | 04/EE(Civil-I)/LMP/2022-23 | 29-10-2022 | 07-12-2022 | Dakpathar | Executive Engineer(Civil),Lakhwar Vyasi Project, Dakpathar | Civil | Repair/Reconstruction of Left Bank Project approach Road of Lakhwar MPP |
|
541. | 18/EE(G)/CPH/2022-23 | 14-11-2022 | 06-12-2022 | Chibro | E.E.-Generation | Electrical and Mechanical | Annual maintenance of generator & associated equipment of unit-1 at Chibro Power House |
|
542. | 13/EE(G)/Chila/2022-23 | 08-11-2022 | 06-12-2022 | Chilla | E.E.-Generation | Electrical and Mechanical | Supply, Installation, Testing and Commissioning works of 220volt, 400AH Plante Battery Set and Battery Charger at Chila Power House. |
|
543. | 14/EE(CM)/DDN/2022-23 | 14-11-2022 | 05-12-2022 | Dehradun | Executive Engineer (Civil-Maintenance) | Civil | M&R work of Non-Residential Buildings of UJVN limited at Yamuna colony, Dehradun. |
|
544. | T-41/EEM/2022-23 | 13-11-2022 | 05-12-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Repair of Drainage & Dewatering Pumps of Power House |
|
545. | 22/EE/PCM/Dhalipur/ 2022-23 | 12-11-2022 | 05-12-2022 | Dehradun | Executive Engineer, PCM | Civil | Supply of Stationary items for Project Civil Maintenance office Dhalipur Dehradun |
|
546. | 05/EE (E&M-SHP)/KALIGANGA-II/2022-23 | 10-11-2022 | 05-12-2022 | Guptkashi | Executive Engineer (E&M-SHP) | Electrical and Mechanical | Annual cleaning,up keeping and g Annual cleaning,up keeping and gardening of the entire area of Kaliganga-II (2x2.25MW) Power House building and other associated areas in VillageKaviltha,Guptkashi, District-Rudraprayag. |
|
547. | 05/EE(Generation)/Vyasi/2022-23 | 04-11-2022 | 05-12-2022 | Dakpathar | Executive Engineer (Generation) | Electrical and Mechanical | Refilling Of Various Types Fire Extinguishers Of Hathiyari Sub Station & Lakhwar Bhawan And R&R Office Building, Dakpathar |
|
548. | 04/EE(E&M-I)/LP/2022-23 | 12-11-2022 | 03-12-2022 | Dakpathar | Executive Engineer (E&M-I) | Electrical and Mechanical | Supply of stationary items |
|
549. | 05/EE(Civil-II)/LMP/2022-23 | 11-11-2022 | 02-12-2022 | Dehradun | Executive Engineer (Civil-II) | Civil | Construction of 04 nos. Type A Residential Building for Lakhwar Multipurpose Project at Dakpatha |
|
550. | 18/2022-23/EE/PCM(GV)/Mayapur | 10-11-2022 | 02-12-2022 | Haridwar | Executive Engineer, PCM(GV) | Civil | River Training Work of Mundal Nala for protection of Chilla Colony at Chilla. |
|
551. | 06/EE (E&M)/(SHP)/Rishikesh/2022-23 | 08-07-2022 | 02-12-2022 | Small Hydro Project | Executive Engineer (E&M)(SHP) Rishikesh | Electrical and Mechanical | Sale of Electro-Mechanical items of Small Hydro Projects located in District Uttarkashi as is where is basis. |
Corrigendum 1
Corrigendum 2
Corrigendum 3
|
552. | 06/EE(Civil-I)/LMP/2022-23 | 29-10-2022 | 01-12-2022 | Dakpathar | Executive Engineer(Civil),Lakhwar Vyasi Project, Dakpathar | Civil | Special Repair and Maintenance of temporary residential building at Lakhwar Project |
|
553. | 05/EE(Civil-I)/LMP/2022-23 | 29-10-2022 | 01-12-2022 | Dakpathar | Executive Engineer(Civil),Lakhwar Vyasi Project, Dakpathar | Civil | Repair/Reconstruction of Project Links Roads and other miscellaneous works of Lakhwar MPP |
|
554. | 10/EE(G)/TPH/2022-23 | 08-11-2022 | 30-11-2022 | Uttarkashi | E.E.-Generation | Electrical and Mechanical | Calibration of various instruments installed at Tiloth |
|
555. | 12/2022-23/EE(C)/Pashulok Barrage | 07-11-2022 | 28-11-2022 | Rishikesh | Executive Engineer (Civil) Pashulok Barrage | Civil | Annual Sweeping and Cleaning Works of Maneri Bhali-II Colony, Rishikesh. |
|
556. | 11/2022-23/EE(C)/Pashulok Barrage | 07-11-2022 | 28-11-2022 | Rishikesh | Executive Engineer (Civil) Pashulok Barrage | Civil | Annual Upkeep Works of the Office of General Manager (CDH&NP) at New Hydel Colony, Pashulok Rishikesh. |
|
557. | 05/EE(Solar)/2022-23 | 13-10-2022 | 28-11-2022 | Dehradun | EE(SOLAR) | Electrical and Mechanical | Preparation of pre-feasibility cum Power Detail Project Report (DPR) for setting up of grid connected Solar Plant on unutilizedland of UJVNL and other Govt Departments/Institutions/corporations etc of Uttarakhand State. |
|
558. | 05/EE(Civil-III)/VP/TN/2022-23 | 12-11-2022 | 26-11-2022 | Dehradun | Executive Engineer (Civil-III) | Civil | Cement Mortar Finishing work in Staircase & OPU rooms of Vyasi Dam at Juddo, Dehradun. |
|
559. | T-40/EEM/2021-22 | 05-11-2022 | 26-11-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Thermal Insulation work in two units at Power House. |
|
560. | T-39/EEM/2021-22 | 05-11-2022 | 26-11-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Removal of silt from drainage/dewatering gallery nearby area at Power House |
|
561. | T-38/EEM/2021-22 | 05-11-2022 | 26-11-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Procurement of various types of fastners for Power House |
|
562. | 05/EE(Test)/GV/2022-23 | 03-11-2022 | 25-11-2022 | Hardwar | Executive Engineer Test Ganga Velly Mayapur Haridwar | Electrical and Mechanical | Calibration of Testing Instruments and Panel Meters of Power Houses under Ganga Valley Haridwar |
|
563. | 22/EE(M&G)/DKN/2022-23 | 03-11-2022 | 25-11-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Annual Operation Contract of 33 kV Sub-Station at Dhakrani Power Station. |
|
564. | 21/EE(M&G)/DKN/2022-23 | 03-11-2022 | 25-11-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Supply and fixing of Labyrinths and Shaft Sleeve at Dhakrani Power Station. |
|
565. | 04/EE(Generation)/Vyasi/2022-23 | 04-11-2022 | 25-11-2022 | Dakpathar | Executive Engineer (Generation) | Electrical and Mechanical | Supply, installation, testing & commissioning of Advanced Early Streamer Emission (ESE) Type of Lighting Arrestors at Vyasi HEP |
|
566. | CH(Maint.)-23/2022-23 | 03-11-2022 | 25-11-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Annual running & upkeeping work of clean water supply to shaft gland of 60 MW turbine at Chibro Power Station |
|
567. | CH(Maint.)-22/2022-23 | 03-11-2022 | 25-11-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Replacement of Cooling & Bypass Pipe Line (Including supply) for Unit 1 & 2 at Chibro Power Station |
|
568. | 19/EE(M)/RPSK/2022-23 | 04-11-2022 | 24-11-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Hiring of one no. diesel driven non AC light motor vehicle (LMV) for a period of twelve months |
|
569. | 03/EE(Civil-II)/Guptkashi/2022-23 | 17-10-2022 | 24-11-2022 | Small Hydro Project | Executive Engineer (Civil-II) | Civil | Finishing work at Powerhouse building and other Miscellaneous works at Madhyamaheshwar SHP (3x5) MW in District-Rudraprayag |
|
570. | 04/EE(Civil-II)/LMP/2022-23 | 02-11-2022 | 23-11-2022 | Dakpathar | Executive Engineer (Civil), Lakhwar Multipurpose Project | Civil | Construction of Office Building for Lakhwar Multipurpose Project (300 MW) at Tons Colony, Dakpathar, Dehradun |
|
571. | 08/EE(Civil)/Lohiahead/Khatima/2022-23 | 29-10-2022 | 23-11-2022 | Lohiahead | EE -Lohia head | Civil | M&R work of residential buildings of Lohiahead colony for the year 2022-23 |
|
572. | 01/EE/BP/2022-23 | 19-09-2022 | 23-11-2022 | Small Hydro Project | Executive Engineer, Bhilangna Projects, Ghansali | Electrical and Mechanical | Hiring of one no. Vehicle (M&M Bolero, Non-AC or equivalent) along with driver for one Year |
|
573. | 08/EE(G)/Klg/2022-23 | 01-11-2022 | 22-11-2022 | Kalagarh | E.E.-Generation | Electrical and Mechanical | Fabrication & fixing of stator cooling pipeline of U#3. |
|
574. | 07/EE(G)/Klg/2022-23 | 01-11-2022 | 22-11-2022 | Kalagarh | E.E.-Generation | Electrical and Mechanical | Overhauling of 5 MVA, 132/33 kV Distribution Transformer. |
|
575. | 07/EE(E&M-II,LWR)VP/2022-23 | 02-11-2022 | 22-11-2022 | Dakpathar | Executive Engineer (E&M-II, LWR) Vyasi Project | Electrical and Mechanical | Cleaning works of reservoir site of Vyasi Dam Juddo HEP(2x60MW). |
|
576. | 17/2022-23/EE/PCM(GV)/Mayapur | 31-10-2022 | 22-11-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | M&R Work of Pathri Power House at Pathri for the year 2022-23. |
|
577. | 08/EE(G)/Klg/2022-23 | 01-11-2022 | 22-11-2022 | Kalagarh | E.E.-Generation | Electrical and Mechanical | Fabrication & fixing of stator cooling pipeline of U#3 |
|
578. | 07/EE(G)/Klg/2022-23 | 01-11-2022 | 22-11-2022 | Kalagarh | E.E.-Generation | Electrical and Mechanical | Overhauling of 5 MVA, 132/33 kV Distribution Transformer |
|
579. | 07/EE (Civil-I)/LMP/2022-23 | 30-10-2022 | 21-11-2022 | Dakpathar | Executive Engineer(Civil),Lakhwar Vyasi Project, Dakpathar | Civil | Repair and Maintenance of Kandriyan field hostel at Lakhwar Project |
|
580. | 01/GM(Civil)/Lakhwar/UJVNL/2021-22 | 30-12-2021 | 21-11-2022 | Dakpathar | Executive Engineer (Civil), Lakhwar Multipurpose Project | Civil | Balance civil works for Construction of 204m high concrete gravity dam, Intake, (3X100 MW) capacity underground Power House and appurtenant works on river Yamuna of Lakhwar Multipurpose Project District- Dehradun/Tehri Garhwal (Uttarakhand). |
Corrigendum 1
Corrigendum 2
Corrigendum 3
|
581. | 08/EE(M)/2022-23 | 27-10-2022 | 18-11-2022 | Uttarkashi | EE-Maintenance Tiloth | Electrical and Mechanical | Annual sweeping cleaning & bush cutting work of different substations. |
|
582. | 07/EE(M)/2022-23 | 27-10-2022 | 18-11-2022 | Uttarkashi | EE-Maintenance Tiloth | Electrical and Mechanical | Repairing & overhauling of L.T. panels |
|
583. | 09/EE(E&M)/AB/2021-22 | 22-10-2022 | 18-11-2022 | Uttarkashi | EE-Generation Tiloth | Electrical and Mechanical | Cutting, digging and uprooting big bushes & grass of 220 kV Switch Yard. |
|
584. | 08/EE(E&M)/AB/2021-22 | 22-10-2022 | 18-11-2022 | Uttarkashi | EE-Generation Tiloth | Electrical and Mechanical | Gardening, Plantation & other associated miscellaneous works. |
|
585. | 09/EE(M)/2022-23 | 22-10-2022 | 15-11-2022 | Uttarkashi | EE-Maintenance Tiloth | Electrical and Mechanical | Hiring of 02 nos. non AC diesel vehicles. |
|
586. | 04/EE(Civil-III)/VP/TN/2022-23 | 30-10-2022 | 14-11-2022 | Dakpathar | Executive Engineer (Civil-III) Vyasi Project | Civil | Supply & Injection of polyurethane based two component injection resin grout, using pneumatic pump, in Dam Galleries & Staircase at Dam site of Vyasi HEP, Juddo, Dehradun |
|
587. | 08/EE(IC&CM)/2022-23 | 22-10-2022 | 14-11-2022 | Dehradun | Executive Engineer (IC&CM) | Electrical and Mechanical | Valuation of scrap material lying at Tiloth Power House, Uttarkashi, Centralstore Kalagarh and Joshiyara Barrage Uttarkashi of UJVN Ltd |
|
588. | 07/EE(G)TPH/2022-23 | 21-10-2022 | 14-11-2022 | Uttarkashi | EE-Generation Tiloth | Electrical and Mechanical | Annual General Cleaning of power house |
|
589. | 06/EE(G)TPH/2022-23 | 21-10-2022 | 14-11-2022 | Uttarkashi | EE-Generation Tiloth | Electrical and Mechanical | Procurement of consumables for 33 kV switchyard. |
|
590. | 01/EE(Civil-IV)/VP/TN/2022-23 | 17-10-2022 | 14-11-2022 | Dakpathar | Executive Engineer (Civil-IV) Vyasi Project Dakpathar, Dehradun | Civil | Supply/Installation and Rectification/Replacement of outstanding works of monitoring instruments and data acquisition system (DAS) at Dam site of Vyasi HEP in district Dehradun (Uttarakhand). |
Corrigendum 1
|
591. | 37/EEM/2022-23 | 20-10-2022 | 11-11-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | : Supply and Application of Coating Material on different Underwater parts in two Units of Power House |
|
592. | 13/SPH/2022-23 | 03-10-2022 | 11-11-2022 | Lohiahead | Executive Engineer, Maint. & Generation | Electrical and Mechanical | In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and accessories of Unit#2 & 3 along with sealing and shifting of draft tube gates and sealing of intake gates of Sharda Power House, Lohiahead as per technical specification |
Corrigendum 1
|
593. | 36/EEM/2022-23 | 20-10-2022 | 10-11-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Hiring of 3 Nos 50/52 Seater School Bus for Chilla Project Colony, Chilla |
|
594. | 16/2022-23/EE/PCM(GV)/Mayapur | 19-10-2022 | 10-11-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | Providing & Laying Interlocking Tiles at various locations of Pathri Power House Colony. |
|
595. | 16/EE(Gen)/Khodri/2022-23 | 18-10-2022 | 09-11-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Annual Contract for Cleaning, up keeping & Maintaining Switchyard and Khodri Power Station Complexat Khodri Power Stationat Khodri Power Station. |
|
596. | 32/EE(Pathri)/2022-23 | 18-10-2022 | 09-11-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Annual contract for operation & maintenance works of water pumping station. |
|
597. | 31/EE(Pathri)/2022-23 | 18-10-2022 | 09-11-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Annual contract for cleaning of offices / club & other places. |
|
598. | 12/EE(G)/Chilla/2022-23 | 17-10-2022 | 09-11-2022 | Chilla | E.E.-Generation | Electrical and Mechanical | Supply of different types of Electrical, consumable and cleaning materials at Chilla Power House. |
|
599. | 10/EE(E&M)/PB/2022-23 | 06-10-2022 | 09-11-2022 | Rishikesh | Executive Engineer (E&M) Pashulok Barrage | Electrical and Mechanical | Annual Routine Trash Cleaning work at Virbhadra Barrage, Pashulok Rishikesh |
Corrigendum 1
|
600. | 08/EE(E&M)/DKP BRG/2022-23 | 18-10-2022 | 08-11-2022 | Dakpathar | EM(E&M) Dakpathar Barrage | Electrical and Mechanical | Annual upkeeping & Maintenance of Inspection House Dakpathar. |
|
601. | 18/EE(M)/RPSK/2022-23 | 17-10-2022 | 07-11-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Supply and fixing of pipe line from new tubewell to existing water supply line. |
|
602. | 17/EE(M)/RPSK/2022-23 | 17-10-2022 | 07-11-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Operation & Maintenance of the drinking water supply system for a period of twelve months at Hydel Colony, Kalagarh. |
|
603. | CH(Maint.)-21/2022-23 | 14-10-2022 | 07-11-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Up-keeping and maintenance of Chibro field hostel |
|
604. | 04/EE(E&M-SHP)/Kaliganga-I/2022-23 | 11-10-2022 | 07-11-2022 | Small Hydro Project | Executive Engineer, (E&M-SHP), UJVNL, Kund (Guptkashi) | Electrical and Mechanical | Annual cleaning, up keeping and gardening of the entire area of Kaliganga-I (2x2 MW) Power House building and other associated areas in Village Khunnu, Guptkashi, District-Rudraprayag. |
|
605. | CH(Maint.)-20/2022-23 | 14-10-2022 | 05-11-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Polysulphide epoxy resin based protective coating of DT stop log gates at Chibro Power Station |
|
606. | 13/EE(CM)/DDN/2022-23 | 19-10-2022 | 04-11-2022 | Dehradun | Executive Engineer(Civil Maint.) | Civil | Supply & Installation of Godrej make furniture at Multi-storey Corporate Office Building at UJJWAL Campus, Dehradun. |
|
607. | 12/EE(CM)/DDN/2022-23 | 13-10-2022 | 04-11-2022 | Dehradun | Executive Engineer(Civil Maint.) | Civil | M&R work of Type- I residences of UJVN Limited at Yamuna colony, Dehradun. |
|
608. | 08/EE(E&M-II)/VP/2022-23 | 12-10-2022 | 03-11-2022 | Dakpathar | Executive Engineer (E&M-II) | Electrical and Mechanical | Removal work of Slit from Dewatering and Drainage sumps/gallery of (2X60 MW) Vyasi Project at Hathiyari |
|
609. | 15/2022-23/EE/PCM(GV)/Mayapur | 11-10-2022 | 02-11-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | Providing Manpower Services for a period of One Year on Outsource basis. |
|
610. | NCB/14/EE(C&M)/MB-II/JOSHIYARA/2022-23 | 17-09-2022 | 02-11-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Construction of Energy dissipation Arrangements (EDA) and appurtenant works at downstream of Joshiyara Barrage of MB-II HEP Joshiyara Uttarkashi under DRIP Phase-II |
Corrigendum 1
Corrigendum 2
|
611. | 07/EE(E&M)/(SHP)/Rishikesh/2022-23 | 14-09-2022 | 02-11-2022 | Small Hydro Project | Executive Engineer (E&M)(SHP) Rishikesh | Electrical and Mechanical | Repair and Maintenance works of Unit-2 Machine at Pilangad SHP (2 X 1125 kW) in District Uttarkashi |
Corrigendum 1
|
612. | 16/UJVNL/EE(M&G)/KPS/2022-23 | 10-10-2022 | 01-11-2022 | Kulhal | E.E.-Maintenance - Generation | Electrical and Mechanical | Laying and stringing of 33 KV medium voltage covered conductors (MVCC) at Dhakrani. |
|
613. | 15/UJVNL/EE(M&G)/KPS/2022-23 | 10-10-2022 | 01-11-2022 | Kulhal | E.E.-Maintenance - Generation | Electrical and Mechanical | Annual Contract for Operation and cleaning work of 33/11 KV Kulhal Substation, Kulhal |
|
614. | 18/EE(GEN)/MB-II/2022-23 | 06-10-2022 | 01-11-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Supply, design, erection and commissioning including civil work of Nitrogen Injection Fire Protection System on 5 MVA, 220/11 kV station transformer at MB-II Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
615. | 08/EE(Civil-II)/Vyasi HEP/2022-23 | 24-09-2022 | 31-10-2022 | Dakpathar | EE(Civil-II)Vyasi Project | Civil | Hiring of one number Non AC diesel Vehicle (mahindra make bolero or equivalent) along with driver for pool vehicle for Present site work at Power House/HRT of Vyasi Project at Dakpathar (Dehradun) for the period of 12 Month. |
Corrigendum 1
Corrigendum 2
|
616. | 07/EE(Civil-II)/Vyasi HEP/2022-23 | 24-09-2022 | 31-10-2022 | Dakpathar | EE(Civil-II)Vyasi Project | Civil | Hiring of one number diesel Vehicle (mahindra make bolero or equivalent) along with driver for Dy. General Manager (Civil-I) Vyasi HE Project for Vyasi Project related works at Dakpathar (Dehradun) for the period of 12 Month. |
Corrigendum 1
Corrigendum 2
|
617. | 01/EE(ISO)/2022-23/ISMS | 23-09-2022 | 31-10-2022 | Dehradun | Executive Engineer (ISO) | Electrical and Mechanical | Services of Certifying Agency for conducting certification audits of ISMS(ISO27001:2013) of Dehradun Offices of UJVN Ltd |
Corrigendum 1
|
618. | 31/EE(M)/MB-II/22-23 | 05-09-2022 | 31-10-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Maintenance for Hydro-Mechanical and Electro-Mechanical works of Dharasu Power House for the period of 06 months. |
Corrigendum 1
Corrigendum 2
|
619. | 10/SPH/2022-23 | 12-09-2022 | 29-10-2022 | Lohiahead | Executive Engineer, Maint. & Generation | Electrical and Mechanical | Calibration of all monitoring and measuring instruments of Sharda Power House, Lohiahead |
Corrigendum 1
|
620. | 11/EE(E&M)/PB/2022-23 | 06-10-2022 | 28-10-2022 | Rishikesh | Executive Engineer (E&M) Pashulok Barrage | Electrical and Mechanical | Annual Routine Sweeping and Cleaning work of Virbhdra Barrage, Pahulok, Rishikesh |
|
621. | 07/EE(Test)/DKN/2022-23 | 04-10-2022 | 28-10-2022 | Dhakrani | EE (Test),Dhakrani | Electrical and Mechanical | Supply of different measuring instruments and other safety items |
|
622. | 05/EE(C)/Tuni–Plasu/2022-23 | 03-10-2022 | 28-10-2022 | Dakpathar | Executive Engineer,(Civil) Tuini Plasu | Civil | Hiring of one diesel driven small vehicle along with the driver ( Mahindra bolero or equivalent make) for the use of Dy. General Manager, Arakot Tiuni & Tiuni Plasu, Dakpathar, Dist. Dehradun for one year |
Corrigendum 1
|
623. | 04/EE(C)/Tuni–Plasu/2022-23 | 03-10-2022 | 28-10-2022 | Dakpathar | Executive Engineer,(Civil) Tuini Plasu | Civil | Hiring of one diesel driven small vehicle along with the driver ( Mahindra bolero or equivalent make ) Pool vehicle for the office of Executive Engineer, TiuniPlasu, Dakpathar& the office of Executive Engineer, ArakotTiuni, Dakpathar , Dist. Dehradun for field & official use for one year |
Corrigendum 1
|
624. | 06/EE(GC)/2022-23 | 26-09-2022 | 28-10-2022 | Dehradun | Executive Engineer (Galogi Complex) Ganga Bhawan | Electrical and Mechanical | Painting of Penstock from Bhatta head works to Galogi SHP Dehradun |
|
625. | 16/EE(M&G)/DKN/2022-23 | 24-09-2022 | 28-10-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Various Electrical Maintenance Work of Machines at Dhakrani Power Station |
Corrigendum 1
|
626. | 16/EE(G)/CPH/2022-23 | 24-09-2022 | 28-10-2022 | Dakpathar | E.E.-Generation Chibhro | Electrical and Mechanical | Annual maintenance of the Coolers & Pumps including replacement of main pipe line of 4*69 MVA Generator Transformers at Chibro Powerhouse |
Corrigendum 1
|
627. | 12/UJVNL/EE(M&G)/KPS/2022-23 | 17-09-2022 | 28-10-2022 | Kulhal | E.E.-Maintenance - Generation | Electrical and Mechanical | S.I.T.C of Nitrogen Injection Fire Protection System for 6.6/132 kV, 12.5MVA Generator Transformer of Unit A & C installed at Kulhal Power Station |
Corrigendum 1
Corrigendum 2
|
628. | 35/EE(M)/MB-II/22-23 | 15-09-2022 | 28-10-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Annual General Electrical Maintenance of colony, L.T and H.T lines at Shaktipuram Colony, Chinyalisaur and Dharasu for the year 2022-23 |
Corrigendum 1
|
629. | 34/EE(M)/MB-II/2022-23 | 14-09-2022 | 28-10-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Servicing of EHG-100/G-40 Governor of Turbine at Dharasu Power House. |
Corrigendum 1
|
630. | T-34/EEM/2021-22 | 06-10-2022 | 27-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | AMC work of 33kV Chilla Bhoopatwala Feeder and Project Colony, Mayapur Haridwar. |
|
631. | 11/EE(CM)/DDN/2022-23 | 04-10-2022 | 27-10-2022 | Dehradun | Executive Engineer(Civil Maint.) | Civil | M&R work in Type-V & OBC residences of UJVN Limited at yamuna colony, Dehradun |
|
632. | 06/EE(E&M-II, LWR)VP/2022-23 | 03-10-2022 | 27-10-2022 | Dakpathar | Executive Engineer (E&M-II, LWR) Vyasi Project | Electrical and Mechanical | Sweeping, Sanitization and upkeeping work at Dam site Vyasi Project Juddo, Dakpathar, Dehradun |
Corrigendum 1
|
633. | 11/EE(G)/Chilla/2022-23 | 06-10-2022 | 25-10-2022 | Chilla | E.E.-Generation | Electrical and Mechanical | Annual Maintenance of electrical works of Chilla Power House. |
|
634. | 07/EE(IC&CM)/2022-23 | 01-10-2022 | 25-10-2022 | Dehradun | Executive Engineer (IC&CM) | Electrical and Mechanical | Supply of CTs and PTs for various power houses/sites of UJVN Ltd. |
|
635. | 12/SPH/2022-23 | 01-10-2022 | 24-10-2022 | Lohiahead | Executive Engineer, Maint. & Generation | Electrical and Mechanical | Procurement of various mechanical spares/consumables at Sharda Power House, Lohiahead, Khatima |
|
636. | T-35/EEM/2022-23 | 14-10-2022 | 23-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Rewinding of 3 MVA transformer at Chilla Project Colony |
Corrigendum 1
|
637. | 15/EE(C&M)/MB-II/Joshiyara/2022-23 | 29-09-2022 | 21-10-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Deployment of one number Retired Tehsildar and one number Revenue Inspector for proper upkeeping of Purchased and Acquired land and land records of M.B-II project at Joshiyara, Uttarkashi. |
|
638. | 02/EE(Civil)/AT/2022-23 | 18-08-2022 | 21-10-2022 | Dakpathar | Executive Engineer(Civil), Arakot-Tiuni, Dakpathar | Civil | Providing Consultancy Services & Preparation of Comprehensive & Bankable Detailed Project Report of Arakot-Tyuni Hydro Electric Project on River Pabar in District Uttarkashi of Uttarakhand. |
Corrigendum 1
Corrigendum 2
Corrigendum 3
|
639. | 13/2022-23/EE/PCM(GV)/Mayapur | 30-09-2022 | 20-10-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | M&R Work of Pathri Colony for the year 2022-23. |
|
640. | 03/UJVNL/EE(C-SBR)/2022-23 | 30-09-2022 | 20-10-2022 | Pithoragarh | Executive Engineer (Civil), SBR Munsiyari, Pithoragarh | Civil | Construction of approach way to power house site of SBR-HEP (120 MW) from Bui pato motor road at tehsil Munsyari in dist. Pithoragarh (Uttarakhand) |
|
641. | CH(Maint.)-19/2022-23 | 27-09-2022 | 20-10-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Procurement & Replacement of 4 Oil Pipe line & its accessories of two units at Chibro |
|
642. | CH(Maint.)-18/2022-23 | 27-09-2022 | 20-10-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Miscellaneous repair & maintenance works of auxiliary systems of 60 MW Turbine of Chibro |
|
643. | 06/EE(IC&CM)/2022-23 | 28-09-2022 | 19-10-2022 | Dehradun | Executive Engineer (GC), Ganga Bhawan, Yamuna Colony, Dehradun | Electrical and Mechanical | Valuation of old scrap vehicles lying at different power houses, stores/sites of UJVN Ltd. |
|
644. | 15/EE(Gen)/Khodri/2022-23 | 27-09-2022 | 19-10-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Work of fabrication & repairing of MS shed for STP & AC Plant at Khodri Power Station |
|
645. | 14/EE(Gen)/Khodri/2022-23 | 27-09-2022 | 19-10-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Hiring of 02 Nos. diesel vehicles along with drivers for Emergency Vehicle (24 Hrs.) & E. E. (Generation) for Khodri Power Station. |
|
646. | 05/EE(E&M-II)/LP/2022-23 | 27-09-2022 | 19-10-2022 | Dakpathar | EE(E&M) Lakwar Project, Dakpather | Electrical and Mechanical | Annual operation & Maintenance Contract for 33/11 KV Lakhwar Sub-Station, Dakpathar, Dehradun. |
|
647. | 05/EE(E&M-II)/LP/2022-23 | 26-09-2022 | 19-10-2022 | Dakpathar | EE(E&M) Lakwar Project, Dakpather | Electrical and Mechanical | Annual operation & Maintenance Contract for 33/11 KV Lakhwar Sub-Station, Dakpathar, Dehradun. |
|
648. | 04/EE(E&M)/ICHARI/TN/2022-23 | 24-09-2022 | 19-10-2022 | Dakpathar | Executive Engineer (E&M)-Ichari Dam,C/O PCM-Dakpathar, Dakpathar | Electrical and Mechanical | Hiring of 01 No. Non-AC diesel vehicle (6+1 Seater) such as Mahindra bolero or equivalent with driver for office of Executive Engineer, (E&M), Ichari Dam, dakpathar, dehradun for period of one year |
|
649. | 02/EE(Civil-II)/Guptkashi/2022-23 | 23-09-2022 | 19-10-2022 | Small Hydro Project | Executive Engineer (Civil-II) | Civil | Construction of community centre for project affected village Mangoli at Madhyamaheshwar SHP (3x5) MW in District-Rudraprayag. |
|
650. | 07/EE(Maint.)/Khodri/202-23 | 20-09-2022 | 19-10-2022 | Dakpathar | E.E.-Maintenance Khodri | Electrical and Mechanical | Annual Maintenance Contrat for Mechanical Auxiliary and Central Store, Khodri |
Corrigendum 1
|
651. | 06/EE(Maint.)/Khodri/2022-23 | 20-09-2022 | 19-10-2022 | Dakpathar | E.E.-Maintenance Khodri | Electrical and Mechanical | Hiring of one number non ac covered body light diesel vehicle for one year for Executive Engineer(Maint.) at khodri power station |
Corrigendum 1
|
652. | CH(Maint.)-17/2022-23 | 26-09-2022 | 18-10-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Supply & Application of Coating Material on Draft Tube Chamber, Draft Tube Window & Stay vanes of Unit No. 04 at Chibro Power Station |
|
653. | 33/EEM/2022-23 | 26-08-2022 | 18-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Procurement of Insulating Material at Chilla Power House. |
|
654. | 03/EE(C)/Tuni–Plasu/2022-23 | 19-09-2022 | 18-10-2022 | Dakpathar | Executive Engineer(Civil), Arakot-Tiuni, Dakpathar | Civil | Supply of Curtain ForAarakot Tiuni&Tiuniplasu Office, Dakpathar office |
Corrigendum 1
|
655. | 05/EE(Test.)/MB-II/2022-23 | 14-09-2022 | 18-10-2022 | Chinyalisaur | Executive Engineer (Test) | Electrical and Mechanical | Procurement of Panel Push Buttons for Dharasu Power House MB-II, Chinyalisaur Uttarkashi |
Corrigendum 1
|
656. | 09/Manager(A&S)/2022-23 | 01-10-2022 | 17-10-2022 | Dehradun | Manager (A & S), Ujjwal ,Dehradun | Electrical and Mechanical | Hiring of vehicles along with driver for corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun. |
|
657. | 20/EE(M&G)/DKN/2022-23 | 26-09-2022 | 17-10-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Dismantling, Rebabitting and assembling of Upper Guide Bearing of Unit B at Dhakrani Power Station. |
|
658. | 19/EE(M&G)/DKN/2022-23 | 26-09-2022 | 17-10-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Inspection and testing of Unit A at Dhakrani Power Station. |
|
659. | 18/EE(M&G)/DKN/2022-23 | 24-09-2022 | 17-10-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | In situ repair of Shaft Journal & Runner Blades, Backfill pressure grouting and other mechanical maintenance work of Unit B & C at Dhakrani power station. |
|
660. | 17/EE(M&G)/DKN/2022-23 | 24-09-2022 | 17-10-2022 | Dhakrani | nil | Electrical and Mechanical | SITC of New valve in drainage circuit, overhauling of other valves and other mechanical works at Dhakrani Power Station. |
|
661. | 17e/EE(G)/CPH/2022-23 | 26-09-2022 | 17-10-2022 | Dakpathar | E.E.-Generation Chibhro | Electrical and Mechanical | Annual maintenance of 60 MW generator & associated equipment of unit 2 & 4 including valve replacement of unit-4 at Chibro Power House |
|
662. | CH(Maint.)-16/2022-23 | 24-09-2022 | 17-10-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Annual Maintenance Works of Unit No. #2, & 4 having capacity of 60 MW at Chibro |
|
663. | 13/EE(Gen)/Khodri/2022-23 | 24-09-2022 | 17-10-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Annual Preventive Maintenance of Generator of Unit No. # 2 & 4 at Khodri Power Station |
|
664. | 11/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 22-09-2022 | 17-10-2022 | Kalagarh | Executive Engineer(Civil) Kalagarh | Civil | Providing and Fixing False Ceiling and Replacement of Doors at Ramganga Power House Kalagarh |
|
665. | 10/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 22-09-2022 | 17-10-2022 | Kalagarh | Executive Engineer(Civil) Kalagarh | Civil | Renovation of Room No. 01, 02, 03, Kitchen and Dining Hall of Erector Hostel Building at Kalagarh. |
|
666. | 09/EE(Civil-I)/Guptkashi/2022-23 | 22-09-2022 | 17-10-2022 | Small Hydro Project | Executive Engineer (Civil-I) Guptkashi, Rudraprayag | Civil | Special Repair & Maintenance work at approach road of Kaliganga-I SHP (2x2 MW) in Distt- Rudraprayag. |
|
667. | 17/EE(GEN)/MB-II/2022-23 | 15-09-2022 | 17-10-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Cleaning and repairing of stator core punching of 76 MW Capacity Hydro Generators of Dharasu Power House, MB-II, Chinyalisaur, Uttarkashi. |
Corrigendum 1
|
668. | 30/EE(Pathri)/2022-23 | 30-09-2022 | 15-10-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Various Electrical repair and maintenance works at 66kV Switchyard at Pathri Power House. |
|
669. | 06/EE(Test)/MB-II/2022-23 | 22-09-2022 | 15-10-2022 | Chinyalisaur | Executive Engineer (Test) | Electrical and Mechanical | AMC of Computer & IT Equipments & procurement of spares for GM office, DGM office, Account office, Joshiyara Barrage and Dharasu Power House MB-II |
|
670. | 11/EE(Maint.)/Khodri/2022-23 | 23-09-2022 | 14-10-2022 | Dakpathar | E.E.-Maintenance Khodri | Electrical and Mechanical | Supply and Installation of Various Size of Gate Valves in Unit 2 and 4 of Khodri Power Station. |
|
671. | 10/EE(Maint.)/Khodri/2022-23 | 23-09-2022 | 14-10-2022 | Dakpathar | E.E.-Maintenance Khodri | Electrical and Mechanical | Annual Maintenance of 30MW Francis turbines and associated equipment of Unit 2&4 of Khodri Power Station. |
|
672. | 09/EE(Maint)/Khodri/2022-23 | 23-09-2022 | 14-10-2022 | Dakpathar | E.E.-Maintenance Khodri | Electrical and Mechanical | Procurement of Polymeric Gland Ring Segment for Khodri Power Station |
Corrigendum 1
|
673. | 08/EE(Maint)/Khodri/2022-23 | 23-09-2022 | 14-10-2022 | Dakpathar | E.E.-Maintenance Khodri | Electrical and Mechanical | Corrosion and abrasion protection of spiral casing with Advanced Ceramics composite in Unit No-2 of Khodri Power Station |
Corrigendum 1
|
674. | 01/EE(Civil-SHP)/Dharchula/2022-23 | 01-09-2022 | 14-10-2022 | Small Hydro Project | Executive Engineer (Civil-SHP), Dharchula | Civil | Miscellaneous repair works at Division Dharchula |
Corrigendum 1
|
675. | 14/UJVNL/EE(M&G)/KPS/2022-23 | 21-09-2022 | 13-10-2022 | Kulhal | E.E.-Maintenance - Generation | Electrical and Mechanical | Annual maintenance of Unit-C of Kulhal Power House (3 X 10 MW) |
|
676. | 13/UJVNL/EE(M&G)/KPS/2022-23 | 21-09-2022 | 13-10-2022 | Kulhal | E.E.-Maintenance - Generation | Electrical and Mechanical | Annual maintenance of Unit-B of Kulhal Power House (3 X 10 MW) |
|
677. | 20/EE/PCM/Dhalipur/2022-23 | 20-09-2022 | 13-10-2022 | Dhalipur | Executive Engineer (PCM ), Dhalipur | Civil | Provision of Temporary Store for Type II residences of Dhalipur Power House Colony at Dhalipur (Dehradun) |
|
678. | 07/Manager(A&S)/2022-23 | 06-09-2021 | 13-10-2022 | Dehradun | Manager (A S) UJJWAL | Electrical and Mechanical | Hiring of vehicles along with driver forcorporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun |
Corrigendum 1
|
679. | 07/EE/M&G/DLR/2022-23 | 27-09-2022 | 12-10-2022 | Dhalipur | E.E.-Maintenance& Generation | Electrical and Mechanical | Cleaning of Intake Trash Rack Bed of Intake Power Channel through out the intake span with the help of Dredger Machine of Dhalipur Power Station |
|
680. | 10/EE(G)/2022-23 | 21-09-2022 | 12-10-2022 | Chilla | E.E.-Generation | Electrical and Mechanical | Supply, Installation, Commissioning & Testing of IP Based Digital EPABX System along with Extensions at Chilla Power House |
|
681. | 09/EE(G)/2022-23 | 21-09-2022 | 12-10-2022 | Chilla | E.E.-Generation | Electrical and Mechanical | Supply and Replacement of PMT make 40/8 kg/cm², Pressure Reducer Valve (PRV) and Related work at Chilla Power House |
|
682. | T-32/EEM/2022-23 | 20-09-2022 | 12-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Hiring of Light diesel vehicle non AC (Mahindra &Bolero or equivalent) with driver for a period of 12 months for EE (Maintenance) Chilla. |
|
683. | T-31/EEM/2022-23 | 20-09-2022 | 11-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Protective coating work over the surface of Penstock its structure and expansion joint of unit no.4 of Power House |
|
684. | T-30/EEM/2022-23 | 20-09-2022 | 11-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Providing& Fixing work of safety lock pin on pump section atPower House |
|
685. | T-29/EEM/2022-23 | 20-09-2022 | 11-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Repairing work of 48 No. strainer buckets at power house |
|
686. | T-28/EEM/2022-23 | 20-09-2022 | 11-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Removal & Replacement work of S.S. broken studs of rotating shaft sleeve ofPower House. |
|
687. | 13/EE(C&M)/MB-II/Joshiyara/2022-23 | 17-09-2022 | 11-10-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Development of road and widening of bend near ujvnl office at Joshiyara , MB-II, Uttarkashi. |
|
688. | 15/EE(G)/CPH/2022-23 | 10-09-2022 | 11-10-2022 | Dakpathar | E.E.-Generation Chibhro | Electrical and Mechanical | Supply, installation, & commissioning of 11 kV cable with 400kVA transformer including dismantling at Chibro Power House |
Corrigendum 1
|
689. | 06/EE(E&M-II)/VP/2022-23 | 01-09-2022 | 11-10-2022 | Dakpathar | Executive Engineer (E&M-II) | Electrical and Mechanical | Routine annual mechanical maintenance work of units & its auxiliaries of Vyasi Project at Hathiyari, Dakpathar,Dehradun |
Corrigendum 1
Corrigendum 2
|
690. | 05/EE(GC)/2022-23 | 10-09-2022 | 10-10-2022 | Dehradun | EE(Galogi Complex) Ganga Bhawan Yamuna Colony | Electrical and Mechanical | Annual General cleaning and up keeping of all building at campus & other Miscellaneous work Galogi SHP. |
|
691. | 09/EE(CM)/DDN/2022-23 | 02-09-2022 | 10-10-2022 | Dehradun | Executive Engineer(Civil Maint.) | Civil | General Cleaning and Sweeping of Ganga Bhawan, Yamuna Bhawan and Yamuna Chettrawas of UJVN Limited at Yamuna Colony, Dehradun. |
Corrigendum 1
|
692. | 08/EE(CM)/DDN/2022-23 | 02-09-2022 | 10-10-2022 | Dehradun | Executive Engineer(Civil Maint.) | Civil | General Cleaning and Sweeping of Residential premises of UJVN Limited at Yamuna Colony, Dehradun |
Corrigendum 1
|
693. | 22/EEM/2022-23 | 08-09-2022 | 09-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Annual Maintenance work of Unit no.1, 3 & 4 and Major Maintenance work of unit no.2 of Chila Power House |
Corrigendum 1
|
694. | 02/UJVNL/IT/EE(IT)/2022-23 | 16-09-2022 | 07-10-2022 | Dehradun | EE (IT), UJVNL | Computers and Software | Vulnerability Assessment and Penetration Testing Audit of IT/ OT/ Scada System. |
|
695. | 15/EE(M&G)DKN/2022-23 | 16-09-2022 | 07-10-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | RE-Rubberisation of water lubricated lower guide bearing of Dhakrani power station |
|
696. | 14/EE(M&G)DKN/2022-23 | 16-09-2022 | 07-10-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Hiring of Dredger Machine for removal of rubbish & sludge from intake of Dhakrani Power Station |
|
697. | 13/EE(M&G)/DKN/2022-23 | 16-09-2022 | 07-10-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Supply and installation of disc fitting for 33kV Switchyard at Dhakrani Power Station |
|
698. | 11/2022-23/EE/PCM(GV)/Mayapur | 15-09-2022 | 07-10-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | Hiring of Diesel Vehicle with Driver for Executive Engineer, PCM(GV), Mayapur for the Year 2022-23. |
|
699. | 10/2022-23/EE/PCM(GV)/Mayapur | 15-09-2022 | 07-10-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | Annual Sweeping & Cleaning Work of Chilla Colony for the year 2022-23 |
|
700. | 14/EE(E&M)/MB-II/Barrage/2022-23 | 14-09-2022 | 07-10-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Repairing and overhauling of 50 ton Gantry Crane at Joshiyara barrage Uttarkashi |
|
701. | 13/EE(E&M)/MB-II/Barrage/2022-23 | 14-09-2022 | 07-10-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Earthing arrangement in Joshiyara Barrage Residential Colony, 11/0.4 kv Substation and Other associated works at Joshiyara Barrage, Uttarkashi |
|
702. | 16/EE(GEN)/MB-II/2022-23 | 09-09-2022 | 07-10-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Repairing of Heat Exchanger of 31 MVA Generator Transformers at Dharasu Power House MB-II Chinyalisaur, Uttarkashi |
|
703. | 14/EE (GEN)/MB-II/2022-23 | 09-09-2022 | 07-10-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Safety audit of various equipments and T&P at MB-II, Dharasu Power House and Joshiyara Barrage. |
|
704. | 01/2022-23/EE(Civil-II)/BP | 06-09-2022 | 07-10-2022 | Small Hydro Project | Executive Engineer (Civil-II), Bhilangna Projects, Ghansali | Civil | Construction of office Building cum Transit Hostel at Ghansali District-Tehri Garhwal. |
|
705. | 12/EE(Gen)/Khodri/2022-232 | 01-09-2022 | 07-10-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Annual Contract for O&M works of Khodri Power Station. |
Corrigendum 1
Corrigendum 2
|
706. | 14/2022-23/EE/PCM(GV)/Mayapur | 30-09-2022 | 06-10-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | Removal of silt from Forebays of Pathri Power House |
|
707. | 08/Manager(A&S)/2022-23 | 20-09-2022 | 06-10-2022 | Dehradun | Manager (A & S), Ujjwal ,Dehradun | Electrical and Mechanical | Annual operation, maintenance, cleaning, and upkeep of Transit camp of UJVN Ltd. at B-39 Sector 14 Noida (UP) |
|
708. | 09/2022-23/EE/PCM(GV)/Mayapur | 14-09-2022 | 06-10-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | M&R Work of Pathri Colony for the year 2022-23 |
Corrigendum 1
|
709. | 08/2022-23/EE/PCM(GV)/Mayapur | 14-09-2022 | 06-10-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | M&R Work of Mayapur Colony at Mayapur for the year 2022-23 |
|
710. | 04/EE(Test.)/MB-II/2022-23 | 14-09-2022 | 06-10-2022 | Chinyalisaur | Executive Engineer (Test) | Electrical and Mechanical | Procurement of Miscellaneous Items for Dharasu Power House MB-II, Chinyalisaur Uttarkashi |
|
711. | 03/EE(Test.)/MB-II/2022-23 | 14-09-2022 | 06-10-2022 | Chinyalisaur | Executive Engineer (Test) | Electrical and Mechanical | SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF FIRE PROTECTION SYSTEM FOR 220V DC (1395 AH) BATTERY BANK AT DHARASU POWER HOUSE, CHINYALISAUR, UTTARKASHI |
|
712. | 12/EE(Civil)/MB-II/Chinyalisaur/2022-23 | 14-09-2022 | 06-10-2022 | Chinyalisaur | E.E (Civil) Chinyalisaur | Civil | Annual upkeeping & cleaning of Badminton Court/ Multipurpose hall at Shaktipuram colony Chinyalisaur, Uttarkashi. |
|
713. | 11/EE(Civil)/MB-II/Chinyalisaur/2022-23 | 14-09-2022 | 06-10-2022 | Chinyalisaur | E.E (Civil) Chinyalisaur | Civil | Miscellaneous civil repair work at office of DGM (HGC) at Shaktipuram Colony, Chinyalisaur (Uttarkashi) |
|
714. | 11/SPH/2022-23 | 12-09-2022 | 06-10-2022 | Lohiahead | Executive Engineer, Maint. & Generation | Electrical and Mechanical | Repair of 4 nos diffusers/ discharge regulators of unit 1 & unit 3 at Sharda Power House, Lohiahead |
|
715. | 15/EE(GEN)/MB-II/2022-23 | 08-09-2022 | 06-10-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Procurement of consumable items for Turbine units at Dharasu power House M.B -II, Uttarkashi. |
|
716. | 05/EE(M)/2022-23 | 29-08-2022 | 06-10-2022 | Uttarkashi | EE-Maintenance Tiloth | Electrical and Mechanical | Different types of structural steel works. |
Corrigendum 1
|
717. | 02/EE(Test.)/MB-II/2022-23 | 23-08-2022 | 06-10-2022 | Chinyalisaur | Executive Engineer (Test) | Electrical and Mechanical | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 220V DC 1395AH Battery SET NO1 AT DHARASU POWER HOUSE |
Corrigendum 1
|
718. | 07/SPH/2022-23 | 23-08-2022 | 06-10-2022 | Lohiahead | Executive Engineer, Maint. & Generation | Electrical and Mechanical | Annual Maintenance Contract for operational safety at Sharda Power House, Lohiahead, Khatima for a period of eleven months |
Corrigendum 1
|
719. | NCB/16/EE(E&M)/MB-II/Barrage/2021-22 | 15-01-2022 | 06-10-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Design, Manufacturing, Supply, Installation, Testing & Commissioning of Trashrack panels & one no. Hydraulically Operated Movable Trash Rack Cleaning Machine (TRCM) to safely handle rake capacity of 2.0 Tonne as well as log grappler capacity of 2.0 Tonne including dismantling of existing Trash rack panels &TRCM at Joshiyara Barrage, Uttarkashi, Uttarakhand, India |
Corrigendum 1
Corrigendum 2
Corrigendum 3
|
720. | T-27/EEM/2022-23 | 13-09-2022 | 04-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | SITC of Movable mechanism system of store gate and repairing of store at Chilla Power House |
|
721. | T-26/EEM/2022-23 | 13-09-2022 | 04-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Procurement of 04 nos S.S. rotating shaft sleeve for the generating units of chilla power house |
|
722. | T-25/EEM/2022-23 | 13-09-2022 | 04-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | AMC of Repairing & Overhauling works of 150HP VT Pump at Chilla Power house. |
|
723. | T-24/EEM/2022-23 | 13-09-2022 | 04-10-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Repair of Various Gate Valves at Chilla Power House. |
|
724. | 12/EE(C&M)/MB-II/Joshiyara/2022-23 | 12-09-2022 | 04-10-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Maintenance and Operation of Vehicle Parking at Joshiyara Barrage MB-II Uttarkashi |
|
725. | CH(MAINT.)-15/2022-23 | 10-09-2022 | 04-10-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Procurement of various Fasteners at Chibro Power Station |
|
726. | 25/EE(Pathri)/2022-23 | 04-09-2022 | 04-10-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Miscellaneous mechanical maintenance works of Machine no.1, 2 & 3. |
Corrigendum 1
|
727. | 07/EE(E&M)/DKPBRG/2022-23 | 13-09-2022 | 03-10-2022 | Dakpathar | Executive Engineer (E/M) | Electrical and Mechanical | Annual Trash rack cleaning and conducting flushing during Monsoon period at Dakpathar Barrage |
|
728. | 06/EE(E&M)/DKP BRG/2022-23 | 13-09-2022 | 03-10-2022 | Dakpathar | Executive Engineer (E/M) | Electrical and Mechanical | Protective Coating on both side surface of Head regulator gates no. 01 to 06 of Dakpathar barrage. |
|
729. | 07/EE(E&M-II)/VP/2022-23 | 10-09-2022 | 03-10-2022 | Dakpathar | Executive Engineer (E&M-II) | Electrical and Mechanical | Supply of Water Purifier for Vyasi Project, Hathiyari |
|
730. | NIT-01/EE(Gen)/Vyasi/22-23 | 30-08-2022 | 03-10-2022 | Dakpathar | Executive Engineer (Generation) | Electrical and Mechanical | Annual Contract for Operation and Routine Electrical Maintenance works at Vyasi Power Station |
Corrigendum 1
|
731. | 10/EE(CM)/DDN/2022-23 | 09-09-2022 | 01-10-2022 | Dehradun | Executive Engineer(Civil Maint.) | Civil | Supply & Installation of Godrej make furniture at Multi-storey Corporate Office Building at UJJWAL Campus, Dehradun |
|
732. | 10/EE(Civil)/MB-II/Chinyalisaur/2022-23 | 09-09-2022 | 01-10-2022 | Chinyalisaur | E.E (Civil) Chinyalisaur | Civil | Painting and Distempering work of Power House building and its associated structure at Dharasu Power House, MB-II HEP, Uttarkashi. |
|
733. | NCB/12/EE/PCM-DKP/TN/2022-23 | 08-08-2022 | 01-10-2022 | Dakpathar | Executive Engineer Project Civil Maintenance - Dakpathar | Civil | Replacement of wooden sleeper with chequered plates and strengthening of Patel Bridge. |
Corrigendum 1
|
734. | 12/2022-23/EE/PCM(GV)/Mayapur | 16-09-2022 | 30-09-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | Removal of silt from Forebays of Pathri Power House |
Corrigendum 1
|
735. | 03/EE(Generation)/Vyasi/2022-23 | 09-09-2022 | 30-09-2022 | Dakpathar | Executive Engineer (Generation) | Electrical and Mechanical | Purchase of 25 mbps internet leased line unlimited bandwith with static IP for Lakhwar Bhawan at Dakpathar for one year |
|
736. | 02/EE(Gen)/Vyasi/22-23 | 09-09-2022 | 30-09-2022 | Dakpathar | Executive Engineer (Generation) | Electrical and Mechanical | Annual contract for operation, routine maintenance and upkeeping of 33/11 KV Sub-Station at Hathiyari |
|
737. | 04/EE(Test) GV/2022-23 | 09-09-2022 | 30-09-2022 | Hardwar | Executive Engineer Test Ganga Velly Mayapur Haridwar | Electrical and Mechanical | Supply of spare parts for CCTV system of Chilla power house. |
|
738. | 33/EE(M)/MB-II/2022-23 | 08-09-2022 | 30-09-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Procurement of consumable items for Turbine units at Dharasu power House M.B -II, Uttarkashi. |
Corrigendum 1
|
739. | 32/EE(M)/MB-II/22-23 | 08-09-2022 | 30-09-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Procurement of Spares for TGB and Guide apparatus assembly for Dharasu Power House MB-II, Uttarkashi. |
|
740. | 05/EE(Maint.)/Khodri/2022-23 | 08-09-2022 | 29-09-2022 | Dakpathar | E.E.-Maintenance Khodri | Electrical and Mechanical | Modification of opening arrangement of Main Inlet Valve (MIV) ofunit no 2,3,4 of Khodri Power House. |
Corrigendum 1
|
741. | 23/EEM/2022-23 | 08-09-2022 | 29-09-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Supply and Application of Coating Material on different Underwater parts in two Units of Power House |
|
742. | PDD-09/2022-23 | 07-09-2022 | 28-09-2022 | Dakpathar | Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Electrical and Mechanical | Supply of earth/discharge rod (11-33kV) & 11kV Jaw. |
|
743. | 11/EE(C&M)/MB-II/Joshiyara/2022-23 | 06-09-2022 | 28-09-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Providing and fixing of Hand Railing in Sedimentation galleries, Drainage gallery and other associated works at Joshiyara barrage, MB-II, Uttarkashi. |
|
744. | 10/EE(C&M)/MB-II/Joshiyara/2022-23 | 06-09-2022 | 28-09-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Special Maintenance work of Joshiyara Barrage, MB-II, Uttarkashi. |
|
745. | 09/SPH/2022-23 | 05-09-2022 | 28-09-2022 | Lohiahead | Executive Engineer, Maint. & Generation | Electrical and Mechanical | In-situ annual maintenance of underwater parts of Kaplan turbine (Alstom/GE make) and accessories of Unit#1 along with sealing and shifting of draft tube gates and sealing of intake gates of Sharda Power House, Lohiahead as per technical specification |
|
746. | 08/SPH/2022-23 | 05-09-2022 | 28-09-2022 | Lohiahead | Executive Engineer, Maint. & Generation | Electrical and Mechanical | Annual electrical maintenance of Generator & Electrical auxiliaries of Unit #1,2& 3 at Sharda Power House, Lohiahead, Khatima |
|
747. | 19/EE/PCM/Dhalipur/ 2022-23 | 05-09-2022 | 27-09-2022 | Dhalipur | Executive Engineer (PCM ), Dhalipur | Electrical and Mechanical | M&R works of Dhakrani Power House Colony at Dhakrani (Dehradun) |
|
748. | 18/EE/PCM/Dhalipur/ 2022-23 | 05-09-2022 | 27-09-2022 | Dhalipur | Executive Engineer (PCM ), Dhalipur | Electrical and Mechanical | M&R works of Dhakrani Power House at Dhakrani (Dehradun) |
|
749. | 15/EE(Pathri)/2022-23 | 29-08-2022 | 27-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Providing services of Divers to carry out the underwater works of Pathri Power House |
Corrigendum 1
|
750. | 07/2022-23/EE/PCM(GV)/Mayapur | 05-09-2022 | 26-09-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | Epoxy Grouting in Draft Tubes of Chilla Power House at Chilla for the year 2022-23 |
|
751. | 06/2022-23/EE/PCM(GV)/Mayapur | 05-09-2022 | 26-09-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | Annual M&R Work of Type-II Residences at Chilla Colony for the Year 2022-23. |
|
752. | 01/2022-23/EE(HM-I)/CD&H,Rishikesh | 06-09-2022 | 26-09-2022 | Rishikesh | Executive Engineer (CD), Civil Design & Hydrology, UJVNL, Pashulok, Rishikesh | Electrical and Mechanical | Hiring of one no. light non AC diesel vehicle (M&M Bolero or equivalent) along with driver on rent basis for 12 months for use as pool vehicle by Executive Engineers, in GM (CDH&NP) office Rishikesh. |
|
753. | 14/EE(G)/CPH/2022-23 | 03-09-2022 | 26-09-2022 | Dakpathar | E.E.-Generation Chibhro | Electrical and Mechanical | SITC of Vapour Seal Assembly set for Unit No2&4 at Chibro power House |
|
754. | 05/EE(G)/TPH/2022-23 | 03-09-2022 | 26-09-2022 | Uttarkashi | EE-Generation Tiloth | Electrical and Mechanical | SITC of 33 kV wave trap & CVT for PLCC system between Tiloth Power Plant and Maneri Dam. |
Corrigendum 1
|
755. | CH(M)-14/2022-23 | 03-09-2022 | 26-09-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | छिबरो विद्युत गृह में पिट एवं वाटरटैंक की सफाई एवं अन्य विभिन्नकार्य। |
|
756. | 29/EE(Pathri)/2022-23 | 04-09-2022 | 26-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Cleaning of cable trenches & electrical panels and other miscellaneous works. |
|
757. | 28/EE(Pathri)/2022-23 | 04-09-2022 | 26-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Repairing & overhauling of Vacuum Circuit Breakers & Air Circuit Breakers and other miscellaneous works. |
|
758. | 27/EE(Pathri)/2022-23 | 04-09-2022 | 26-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Various electrical maintenance works of generators. |
|
759. | 26/EE(Pathri)/2022-23 | 04-09-2022 | 26-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Polypoxy protective coating works on Intake Gates of Machine no.3. |
|
760. | 24/EE(Pathri)/2022-23 | 04-09-2022 | 26-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Repairing, Servicing and Overhauling of 66KV Isolators & Earth Links. |
|
761. | 09/EE(C&M)/MB-II/Joshiyara/2022-23 | 03-09-2022 | 24-09-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Hiring of one number Non-AC Diesel Vehicle such as Mahindra Bolero or equivalent model 2020 and onwards with Driver for Office of Executive Engineer(C&M) MB-II, Joshiyara for the period of one year. |
|
762. | 23/EE(Pathri)/2022-23 | 02-09-2022 | 24-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Repairing & Rewinding of various motors of Pump House & Trash Rack Cleaning Machine |
|
763. | 22/EE(Pathri)/2022-23 | 02-09-2022 | 24-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Repairing & Maintenance of Trash Rack Screens. |
|
764. | 21/EE(Pathri)/2022-23 | 02-09-2022 | 24-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Replacement of Rubber Seal of Intake Gates of Machine no.1 & 2 and overhauling of gear boxes of lifting mechanism of all intake gates. |
|
765. | 20/EE(Pathri)/2022-23 | 02-09-2022 | 24-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Safety Audit of various equipment & T&P. |
|
766. | 10/2022-23/EE(C)/Pashulok Barrage | 02-09-2022 | 23-09-2022 | Rishikesh | Executive Engineer (Civil) Pashulok Barrage | Civil | Annual Maintenance & Repair Works of Maneri Bhali-II Colony at Rishikesh |
|
767. | 11/EE(Gen)/Khodri/2022-232 | 01-09-2022 | 22-09-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Procurement of Electrical Consumable at Khodri Power Stationof Khodri Power Station |
|
768. | 19/EE(Pathri)/2022-23 | 31-08-2022 | 22-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Repairing and overhauling of Bypass Water Conductor System 12” Gate Valves, Gate / Globe Valves of cooling water system and other miscellaneous works of Water Conducting System. |
|
769. | 18/EE(Pathri)/2022-23 | 31-08-2022 | 22-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Removal of Silt from Up-stream, Down-stream, By-pass gates galleries & Fore bays |
|
770. | 17/EE(Pathri)/2022-23 | 31-08-2022 | 22-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Repairing & Painting of Draft Tube Gantry Crane, Cooling Water Overhead Tank & water pipelines of Pump House. |
|
771. | 03/EE(E&M-SHP)/Kaliganga-I/2022-23 | 31-08-2022 | 22-09-2022 | Small Hydro Project | Executive Engineer, (E&M-SHP), UJVNL, Kund (Guptkashi) | Electrical and Mechanical | Annual Operation and Maintenance of Kaliganga-I SHP (2x2 MW+15% COL), located in Tehsil Ukhimath District-Rudraprayag. |
|
772. | 10/EE(Gen)/Khodri/2022-23 | 23-08-2022 | 22-09-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Overhauling work of 33 kV isolator/ control panel at Khodri Power Station. |
Corrigendum 1
|
773. | 06/Manager(A&S)/2022-23 | 23-08-2022 | 22-09-2022 | Dehradun | Manager (A & S), Ujjwal ,Dehradun | Electrical and Mechanical | Hiring of vehicles along with driver forcorporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun |
Corrigendum 1
|
774. | 10/EE(M&G)/MPH/2022-23 | 01-09-2022 | 21-09-2022 | Hardwar | Executive Engineer (M&G)Mohammadpur, Gurukul Narsan | Electrical and Mechanical | Supply and application of putty compounds on metallic/concrete surface of Unit no.2 at Mohammadpur Power House. |
|
775. | 03/UJVNL/IT/EE(EM-II)/2022-23 | 31-08-2022 | 21-09-2022 | Dehradun | Executive Engineer (E&M-II) | Electrical and Mechanical | Hiring of cloud services for UJVN Ltd. |
|
776. | 09/EE(E&M-I)/VP/2022-23 | 31-08-2022 | 21-09-2022 | Dakpathar | Executive Engineer (E&M-I), Vyasi Project, Dakpathar | Electrical and Mechanical | Supply of Electrical Items |
Corrigendum 1
|
777. | 01/EE(Civil-II)/Guptkashi/2022-23 | 04-08-2022 | 21-09-2022 | Small Hydro Project | Executive Engineer (Civil-II) | Civil | Providing, Laying & Fixing of water supply system at project affected Village Chunni Madhyamaheshwar SHP (3x5) MW in District-Rudraprayag. |
Corrigendum 1
|
778. | 03/EE(P&C)/2022-23 | 29-08-2022 | 20-09-2022 | Dehradun | Executive Engineer (P&C), Ganga Bhawan | Electrical and Mechanical | Procurement of different Luminaries with fixtures and accessories for various Power Houses of UJVN LTD |
|
779. | 12/EE(E&M)/MB-II/Barrage/2022-23 | 30-08-2022 | 20-09-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Procurements of miscellaneous items at Joshiyara Barrage, MB-II, Uttarkashi |
|
780. | NIT-30/EE(M)/MB-II/22-23 | 30-08-2022 | 20-09-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Servicing of Turbine Oil Centrifuging Machines at Dharasu Power House, MB-II, Uttarkashi. |
|
781. | NIT-29/EE(M)/MB-II/22-23 | 30-08-2022 | 20-09-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Servicing and Overhauling of High pressure, Low Pressure and General Purpose air compressor at Dharasu Power House, M.B.-II, Uttarkashi. |
|
782. | NIT-28/EE(M)/MB-II/22-23 | 30-08-2022 | 20-09-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Repairing and Overhauling of Centralized Greasing System and other works at Dharasu Power, MB-II, Uttarkashi |
|
783. | 04/EE(Civil-II)/SHP/Maneri/2022-23 | 26-08-2022 | 20-09-2022 | Uttarkashi | Executive Engineer-II (Civil), SHP, UJVN Ltd., Maneri, Uttarkashi | Civil | Construction of Covering Slab and Railing work in Pilangad-(2x1125 KW) Power Channel at Bhatwari, Distt. Uttarkashi. |
|
784. | e-04/EE/M&G/DLR/2022-23 | 22-07-2022 | 20-09-2022 | Dhalipur | E.E.-Maintenance & Generation | Electrical and Mechanical | Supply of one number 132/11 kV, 20 MVA Generator Transformer for (3x17 MW) Dhalipur Power Station, Dehradun. |
Corrigendum 1
Corrigendum 2
Corrigendum 3
|
785. | NCB/03/EE(E&M)/Dakpathar Barrage/2022-23 | 27-06-2022 | 20-09-2022 | Dakpathar | Executive Engineer (E/M) | Electrical and Mechanical | Refurbishment of the hoist mechanism and major overhauling of the Head regulator gates no. 1 to 6 at Dakpathar barrage in Distt- Dehradun. |
Corrigendum 1
Corrigendum 2
Corrigendum 3
|
786. | NCB/02/EE(E&M)/Dakpathar Barrage/2022-23 | 27-06-2022 | 20-09-2022 | Dakpathar | Executive Engineer (E/M) | Electrical and Mechanical | Refurbishment of the hoist mechanism and major overhauling of the Head regulator gates no. 1 to 6 at Dakpathar barrage in Distt- Dehradun. |
Corrigendum 1
Corrigendum 2
Corrigendum 3
|
787. | 07/EE(CM)/DDN/2022-23 | 29-08-2022 | 19-09-2022 | Dehradun | Executive Engineer(Civil Maint.) | Civil | Work of Varandah closing in staff quarters of UJVN Ltd. at Yamuna colony, Dehradun |
|
788. | 09/EE(E&M)/PB/2022-23 | 29-08-2022 | 19-09-2022 | Rishikesh | Executive Engineer (E&M) Pashulok Barrage | Electrical and Mechanical | Supply, laying & fixing of power & distribution cables at Virbhadra Barrage, Pashulok, Rishikesh. |
|
789. | 16/EE(Pathri)/2022-23 | 29-08-2022 | 19-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Supply of motors for various types of auxiliaries of Pathri Power House. |
|
790. | 06/EE(M)/2022-23 | 29-08-2022 | 19-09-2022 | Uttarkashi | EE-Maintenance Tiloth | Electrical and Mechanical | Refilling of fire extinguishers. |
|
791. | 13/EE(GEN)/MB-II/2022-23 | 28-08-2022 | 19-09-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Repairing of Power Convenience & Light Sub. Distribution Board at MB-II, Dharasu Power House. |
|
792. | 12/EE(GEN)/MB-II/2022-23 | 28-08-2022 | 19-09-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Painting of Generating Transformer and Associated Structure at MB-II, Dharasu Power House, Chinyalisaur, Uttarkashi. |
|
793. | 11/EE(GEN)/MB-II/2022-23 | 28-08-2022 | 19-09-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Supply & Fabrication of Different Types Dowel Pin & Other Items for Generator Maintenance at MB-II, Dharasu Power House. |
|
794. | 11/EE(E&M)/MB-II/Barrage/2022-23 | 29-08-2022 | 19-09-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Refilling of 29 Nos. Fire extinguishers at Joshiyara Barrage , MB-II, Uttarkashi |
|
795. | 10/EE(E&M)/MB-II/Barrage/2022-23 | 29-08-2022 | 19-09-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Fabrication of ladder , emergency exit cover and stop log gates cover as per site requirement at Joshiyara barrage, Uttarkashi |
|
796. | 09/EE(E&M)/MB-II/Barrage/2022-23 | 29-08-2022 | 19-09-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Replacement of CCTV surveillance system at Joshiyara barrage Uttarkashi |
|
797. | CH (Maint.)-13/2022-23 | 27-09-2022 | 17-09-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Procurement of various rubber items at Chibro Power Station |
|
798. | 07/EE(Civil)/Lohiahead/Khatima/2022-23 | 23-08-2022 | 17-09-2022 | Lohiahead | EE -Lohia head | Civil | Annual Operation, Cleaning & Upkeeping of Staying Facility and Office of Executive Engineer (Civil), UJVN Ltd. at Sharda Power House, Lohiahead Khatima for the year 2022-23 |
|
799. | 06/EE(Civil)/Lohiahead/Khatima/2022-23 | 23-08-2022 | 17-09-2022 | Lohiahead | EE -Lohia head | Civil | Annual Horticulture Maintenance, Development of Lawns and Clearing grass at Sharda Power House Lohiahead for the year 2022-23 |
|
800. | 05/EE(Civil)/Lohiahead/Khatima/2022-23 | 23-08-2022 | 17-09-2022 | Lohiahead | EE -Lohia head | Civil | Annual General Cleaning work of Lohiahead colony for the year 2022-23 |
|
801. | 16/EE(M)/RPSK/2022-23 | 25-08-2022 | 16-09-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Replacement of damaged DT drain pipe of Unit-1 and Unit-2 with associated works of Dewatering System. |
|
802. | 10/EE(GEN)/MB-II/2022-23 | 18-08-2022 | 16-09-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Procurement of various types T&P at MB-II, Dharasu Power House |
|
803. | 09/EE(GEN)/MB-II/2022-23 | 18-08-2022 | 16-09-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Maintenance of Garden and operation of canteen at Dharasu power house for the year 2022-23. |
|
804. | 01/EE(Civil)/AT/2022-23 | 29-07-2022 | 16-09-2022 | Dakpathar | Executive Engineer(Civil), Arakot-Tiuni, Dakpathar | Civil | Drilling & Drifting works for Geo-Technical investigation for Arakot-Tiuni HEP in District-Uttarkashi, Uttarakhand |
Corrigendum 1
Corrigendum 2
|
805. | 09/2022-23/EE(Civil)/UJVNL/Pashulok Barrage | 26-08-2022 | 15-09-2022 | Rishikesh | Executive Engineer (Civil) Pashulok Barrage | Civil | Annual Maintenance & Repair of Power Channel of Chilla Hydro Electric Project |
|
806. | 05/EE(E&M)/DKPBRG/2022-23 | 26-08-2022 | 15-09-2022 | Dakpathar | EM(E&M) Dakpathar Barrage | Electrical and Mechanical | Annual contract for caulking the leakage of under sluice and barrage way gates at Dakpathar Barrage. |
|
807. | 04/EE(E&M)/DKPBRG/2022-23 | 26-08-2022 | 15-09-2022 | Dakpathar | EM(E&M) Dakpathar Barrage | Electrical and Mechanical | Fabrication of tin shed near Head regulator gates along with minor repairing works at Pump house of Dakpathar barrage |
|
808. | 15/EE(M)/RPSK/2022-23 | 25-08-2022 | 15-09-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Supply of consumable items |
|
809. | 02/UJVNL/EE(C-SBR)/2022-23 | 25-08-2022 | 15-09-2022 | Pithoragarh | Executive Engineer (Civil), SBR Munsiyari, Pithoragarh | Civil | Running & Maintenance of Gauge & Discharge Site and Silt measurement at of Gori ganga river near Dam/Barrage axis of Sirkari Bhyol Rupsiabagar HEP (120 MW), Munsiyari, Pithoragarh |
|
810. | 04/EE(M)/2022-23 | 23-08-2022 | 15-09-2022 | Uttarkashi | EE-Maintenance Tiloth | Electrical and Mechanical | Hiring of 02 nos. non AC diesel vehicles. |
|
811. | 09/EE(Gen)/Khodri/2022-23 | 23-08-2022 | 15-09-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Supply of Stationary & Consumable items at Khodri Power Station. |
|
812. | 08/EE(Gen)/Khodri/2022-23 | 23-08-2022 | 15-09-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Servicing & Overhauling of 11 kV VCB at Khodri Power Station |
|
813. | 13/EE(G)/CPH/2022-23 | 23-08-2022 | 14-09-2022 | Dakpathar | E.E.-Generation Chibhro | Electrical and Mechanical | Annual contract for operation & miscellaneous work of 33/11kV Chibro substation & 11/0.44kV Koti Substations at Chibro Power House |
|
814. | NCB/14/EE/PCM-DKP/TN/2022-23 | 08-08-2022 | 14-09-2022 | Dakpathar | Executive Engineer Project Civil Maintenance - Dakpathar | Civil | Reaming/ Re drilling of existing drainage holes in the foundation Gallery of Ichari dam. |
|
815. | NCB/13/EE/PCM-DKP/TN/2022-23 | 08-08-2022 | 14-09-2022 | Dakpathar | Executive Engineer Project Civil Maintenance - Dakpathar | Civil | Hill Slope Protection Works on the upstream left bank of Ichari Dam. |
|
816. | 03/EE(Civil-I)/LMP/2022-23 | 30-08-2022 | 13-09-2022 | Dakpathar | Executive Engineer (Civil), Lakhwar Multipurpose Project | Civil | Carrying out Topographical Survey and other associated work of Lakhwar Multipurpose Project |
|
817. | 14/EE(Pathri)/2022-23 | 20-08-2022 | 13-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Supply and application of coating material on concrete surface of Spiral Casing of Machine No.2 of Pathri Power House. |
|
818. | 27/EE(M)/MB-II/22-23 | 20-08-2022 | 13-09-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Epoxy Painting of Turbine, MIV and other equipment at Dharasu Power House M.B -II Uttarkashi. |
|
819. | 08/EE(Civil-I)/Galogi/2022-23 | 17-08-2022 | 13-09-2022 | Small Hydro Project | Executive Engineer (Civil-I) Guptkashi, Rudraprayag | Civil | Annual Repair & Maintenance work of Civil structures at Galogi SHP 3.5 MW in Distt- Dehradun |
|
820. | 08/EE(G)/Chilla/2022-23 | 20-08-2022 | 12-09-2022 | Chilla | E.E.-Generation | Electrical and Mechanical | Removal of Sledge with the help of dredger machine from intake of Chilla Power House. |
|
821. | 01/EE(E&M)/Dharchula/2022-23 | 17-08-2022 | 12-09-2022 | Pithoragarh | Executive Engineer (E&M) Dharchula | Electrical and Mechanical | Hiring of one number diesel driven small vehicle (Bolero or equivalent, non AC) for 12 months along with driver for the office of Executive Engineer (E&M), Dharchula, Dist.- Pithoragarh (Uttarakhand) |
|
822. | 09/EE(Civil)/MB-II/Chinyalisaur/2022-23 | 17-08-2022 | 12-09-2022 | Chinyalisaur | E.E (Civil) Chinyalisaur | Civil | Annual Operation and Maintenance of water treatment plant pump house including pumps and electrical fitting&Nagungad water supply line headwork of Shaktipuram Colony at ChinyalisaurUttarkashi |
|
823. | 26/EE(M)/MB-II/22-23 | 18-08-2022 | 10-09-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Repair, Servicing and Overhauling of 5 Ton Motorized chain hoist at Dharasu Power House, MB-II |
|
824. | 25/EE(M)/MB-II/22-23 | 18-08-2022 | 10-09-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Procurement Of Coating Material For Turbine At Dharasu Power House |
|
825. | T-21/EEM/2022-23 | 17-08-2022 | 10-09-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Repair & Overhauling works of Lath, Hexa and Grinder machine at chilla power house. |
|
826. | 08/EE(E&M)/MB-II/Barrage/2022-23 | 16-08-2022 | 09-09-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Annual Routine Maintenance of Electrical work of colony and HT / LT Line at Joshiyara Colony |
|
827. | 11/EE(M)/RPSK/2022-23 | 18-07-2022 | 09-09-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Hiring of one no. diesel driven non AC light motor vehicle (LMV) for a period of twelve months for Dy. General Manager (E&M) Kalagarh. |
Corrigendum 1
Corrigendum 2
|
828. | 08/EE(C&M)/MB-II/Joshiyara/2022-23 | 16-08-2022 | 08-09-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Annual civil maintenance & repair of P-III,P-IV colony & non residential building at Joshiyara colony, Uttarkashi. |
|
829. | 07/EE(C&M)/MB-II/Joshiyara/2022-23 | 16-08-2022 | 08-09-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Annual civil maintenance & repair of P-II,T-III residential building at Joshiyara colony ,Uttarkashi. |
|
830. | 06/EE(C&M)/MB-II/Joshiyara/2022-23 | 16-08-2022 | 08-09-2022 | Uttarkashi | Executive Engineer (C&M), MB-II, Joshiyara, Uttarkashi | Civil | Annual civil maintenance & repair of T-II,P-I residential building at Joshiyara colony, Uttarkashi |
|
831. | 03/EE(E&M)/ICHARI/TN/2022-23 | 14-07-2022 | 08-09-2022 | Dakpathar | Executive Engineer (E&M)-Ichari Dam,C/O PCM-Dakpathar, Dakpathar | Electrical and Mechanical | SITC of LED lights and Solar LED street light at Dam inspection gallery and dam premises of Ichari Dam in District Dehradun |
Corrigendum 1
|
832. | 16/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 07-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Repair of foot track from Ramlila ground to Maneri Village Road at Maneri, Uttarkashi |
|
833. | 15/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 07-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Repair of C.C. Road from Maneri Dam Colony to water treatment plant (from Ch. O to 100m.) at Maneri, Uttarkashi |
|
834. | 14/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 07-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Annual operation & maintenance of Gauge and Discharge Site at Heena, Uttarkashi |
|
835. | 13/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 07-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Annual operation & maintenance of Water supply distribution system of Maneri Dam Colony, Maneri, Uttarkashi |
|
836. | 13/EE(Pathri)/2022-23 | 12-08-2022 | 06-09-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Supply of Submersible Dewatering Pumps at Pathri Power House |
|
837. | 12/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 06-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Annual sweeping, cleaning and repair & maintenance of septic tank, soak pit, sewer lines and drains in Tiloth Colony, Uttarkashi |
|
838. | 11/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 06-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Annual sweeping, cleaning and repair & maintenance of septic tank, soak pit, sewer lines and Drains in Kuteti Devi Colony, Uttarkashi |
|
839. | 10/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 06-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Civil Maintenance & repair of Various type of Residences at Tiloth Colony, Uttarkashi |
|
840. | 09/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 06-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Civil maintenance & repair of Tiloth Power House Complex, Uttarkashi |
|
841. | 08/EE(Civil)/MB-II/Chinyalisaur/2022-23 | 12-08-2022 | 06-09-2022 | Chinyalisaur | E.E (Civil) Chinyalisaur | Civil | Housekeeping, Upkeeping and Operation of officer field hostel at Shaktipruam colony, Chinyalisaur, Uttarkashi. |
|
842. | 07/EE(Civil-I)/Kaliganga-II/2022-23 | 10-08-2022 | 06-09-2022 | Small Hydro Project | Executive Engineer (Civil-I) Guptkashi, Rudraprayag | Civil | Hydro-mechanical and allied works at Forebay & Power House area at Kaliganga-II SHP (2x2.25) MW in District-Rudraprayag. |
|
843. | 09/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 10-08-2022 | 06-09-2022 | Kalagarh | Executive Engineer(Civil) Kalagarh | Civil | Annual M & R Work of Type - IIIrd & IVth Residences at Hydel Colony Kalagarh |
|
844. | 08/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 10-08-2022 | 06-09-2022 | Kalagarh | Executive Engineer(Civil) Kalagarh | Civil | Annual M & R Work of Type - Ist & A-Type Residences at Hydel Colony Kalagarh |
|
845. | 07/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 10-08-2022 | 06-09-2022 | Kalagarh | Executive Engineer(Civil) Kalagarh | Civil | Annual M & R Work of Kalagarh Power House for the year 2022-23 |
|
846. | 05/EE(E&M)/(SHP)/Rishikesh/2022-23 | 02-07-2022 | 06-09-2022 | Small Hydro Project | Executive Engineer (E&M)(SHP) Rishikesh | Electrical and Mechanical | Design, Manufacturing, Supply, Transportation and Repair of turbine and associated items of Pilangad SHP (2x1125 KW), in District Uttarkashi |
Corrigendum 1
Corrigendum 2
Corrigendum 3
|
847. | 08/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 05-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Annual operation & maintenance of Mulsifyre water line & cooling water line of Tiloth power house, Uttarkashi |
|
848. | 07/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 05-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Annual operation & maintenance of Water supply distribution system of Kuteti Devi Colony, Uttarkashi |
|
849. | 06/EE(Civil)/MB-I/TN/2022-23 | 12-08-2022 | 05-09-2022 | Uttarkashi | Executive Engineer (Civil), M.B-I, Maneri, Uttrakashi | Civil | Annual operation & maintenance of Water supply distribution system of Tiloth Colony, Uttarkashi, |
|
850. | 07/EE(Gen)/Khodri/2022-23 | 12-08-2022 | 03-09-2022 | Dakpathar | E.E.-Generation Khodri | Electrical and Mechanical | Refilling of Water Mist, ABC and BC type Fire Extinguisher Cylinders |
Corrigendum 1
|
851. | 17/EE/PCM/Dhalipur/2022-23 | 06-08-2022 | 03-09-2022 | Dhalipur | Executive Engineer (PCM ), Dhalipur | Civil | General cleaning of Asan Barrage and Power Channel Stage IV and up keeping park at Asan Barrage (Dehradun) |
|
852. | 02/EE(P&C)/2022-23 | 10-08-2022 | 02-09-2022 | Dehradun | Executive Engineer (P&C), Ganga Bhawan | Electrical and Mechanical | Procurement of CANON Make cartridges for various office of UJVN Ltd. located at Dehradun |
|
853. | 06/SPH/2022-23 | 17-08-2022 | 01-09-2022 | Lohiahead | Executive Engineer, Maint. & Generation | Electrical and Mechanical | PProviding and fixing of chain link fencing and electrical fencing at 132KV switchyard of Sharda Power House, Lohiahead. |
|
854. | 11/EE/PCM-DKP/TN/2022-23 | 08-08-2022 | 01-09-2022 | Dakpathar | Executive Engineer Project Civil Maintenance - Dakpathar | Civil | Upkeep and Gardening works related to Ichari Dam. |
|
855. | 10/EE/PCM-DKP/TN/2022-23 | 08-08-2022 | 01-09-2022 | Dakpathar | Executive Engineer Project Civil Maintenance - Dakpathar | Civil | Civil Maintenance & Repair works of Ichari Dam & it's associated structures. |
|
856. | 09/EE/PCM-DKP/TN/2022-23 | 08-08-2022 | 01-09-2022 | Dakpathar | Executive Engineer Project Civil Maintenance - Dakpathar | Civil | Civil Maintenance & Repair of C-Type Residences of Tons Colony at Dakpathar, Dehradun. |
|
857. | 08/EE/PCM-DKP/TN/2022-23 | 08-08-2022 | 01-09-2022 | Dakpathar | Executive Engineer Project Civil Maintenance - Dakpathar | Civil | Civil Maintenance & Repair of B-Type Residences of Old & New Yamuna Colony at Dakpathar, Dehradun. |
|
858. | 07/EE(G)/2022-23 | 10-08-2022 | 31-08-2022 | Chilla | E.E.-Generation | Electrical and Mechanical | Supply and Installation of Heavy Duty Exhaust Fans at Chilla Power House. |
|
859. | 06/EE(Civil-II)/Vyasi HEP/2022-23 | 06-08-2022 | 30-08-2022 | Dakpathar | EE(Civil-II)Vyasi Project | Civil | Hiring of one number Non AC diesel Vehicle (mahindra make bolero or equivalent) along with driver for pool vehicle for Present site work at Power House/HRT of Vyasi Project at Dakpathar (Dehradun) for the period of 12 Month. |
|
860. | 05/EE(Civil-II)/Vyasi HEP/2022-23 | 06-08-2022 | 30-08-2022 | Dakpathar | EE(Civil-II)Vyasi Project | Civil | Hiring of one number diesel Vehicle (mahindra make bolero or equivalent) along with driver for Executive Engineer (Civil-II) Vyasi HE Project for Vyasi Project related works at Dakpathar (Dehradun) for the period of 12 Month. |
|
861. | 04/EE(Civil-II)/Vyasi HEP/2022-23 | 06-08-2022 | 30-08-2022 | Dakpathar | EE(Civil-II)Vyasi Project | Civil | Hiring of one number diesel Vehicle (mahindra make bolero or equivalent) along with driver for Dy. General Manager (Civil-I) Vyasi HE Project for Vyasi Project related works at Dakpathar (Dehradun) for the period of 12 Month |
|
862. | 05/2022-23/EE/PCM(GV)/Mayapur | 08-08-2022 | 29-08-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | Works Related to Roof Leakage Treatment of Type-IInd Qtrs. located at DGM Office side at Chilla. |
|
863. | 04/2022-23/EE/PCM(GV)/Mayapur | 08-08-2022 | 29-08-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | M&R Work of Mohammadpur Power House Colony at Mohammadpur for the year 2022-23. |
|
864. | 03/2022-23/EE/PCM(GV)/Mayapur | 08-08-2022 | 29-08-2022 | Hardwar | Executive Engineer Project Civil Maintenance(GV), Mayapur | Civil | M&R Work of Mohammadpur Power House at Mohammadpur for the year 2022-23. |
|
865. | 9/EE(M&G)/MPH/2022-23 | 08-08-2022 | 29-08-2022 | Hardwar | Executive Engineer (M&G)Mohammadpur, Gurukul Narsan | Electrical and Mechanical | Supply of various safety items at MPH |
|
866. | 8/EE(M&G)/MPH/2022-23 | 08-08-2022 | 29-08-2022 | Hardwar | Executive Engineer (M&G)Mohammadpur, Gurukul Narsan | Electrical and Mechanical | Annual Maintenance of Machine no 1& 3. |
|
867. | 7/EE(M&G)/MPH/2022-23 | 08-08-2022 | 29-08-2022 | Hardwar | Executive Engineer (M&G)Mohammadpur, Gurukul Narsan | Electrical and Mechanical | Supply of 1 No TGB Shell. |
|
868. | 16/EE/PCM/Dhalipur/2022-23 | 05-08-2022 | 29-08-2022 | Dhalipur | Executive Engineer (PCM ), Dhalipur | Electrical and Mechanical | General cleaning and up keeping of Power House Colony at Kulhal (Dehradun) |
|
869. | 15/EE/PCM/Dhalipur/2022-23 | 05-08-2022 | 29-08-2022 | Dhalipur | Executive Engineer (PCM ), Dhalipur | Electrical and Mechanical | Maintenance & repair of Power House Colony at Kulhal (Dehradun) |
|
870. | 08/EE(GEN)/MB-II/2022-23 | 22-07-2022 | 29-08-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Procurement of Electrical Items for MB-II, Dharasu Power House. |
Corrigendum 1
|
871. | 14/EE(M)/RPSK/2022-23 | 06-08-2022 | 27-08-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Repair of draft tube window of Unit-1 and Unit-3 |
|
872. | 13/EE(M)/RPSK/2022-23 | 04-08-2022 | 27-08-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Supply of miscellaneous electrical items. |
|
873. | 01/UJVNL/03/D(P)/EE(C-BNP)/2022-23 | 22-07-2022 | 27-08-2022 | Chamoli | Executive Engineer (BNP) | Electrical and Mechanical | Supply and installation of Godrej make furniture in transit camp of UJVNL at Dhunarghat (Gairsain) Chamoli |
Corrigendum 1
|
874. | CH(MAINT.)-12/2022-23 | 03-08-2022 | 26-08-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Hiring of Non AC vehicle for Executive Engineer (Maint.) of Chibro Power Station |
|
875. | T-20/EEM/2022-23 | 02-08-2022 | 26-08-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Repairing work of 10 nos thrust coolers of generating units of chilla power house. |
Corrigendum 1
|
876. | T-19/EEM/2022-23 | 02-08-2022 | 26-08-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Procurement of 04 nos S.S. rotating shaft sleeve for the generating units of chilla power house. |
|
877. | 11/UJVNL/EE(M&G)/KPS/2022-23 | 04-08-2022 | 25-08-2022 | Kulhal | E.E.-Maintenance - Generation | Electrical and Mechanical | Design, Fabrication, Integration, Testing & Commissioning of Low Voltage Switchgear & Control gear at Kulhal Power Station. |
Corrigendum 1
Corrigendum 2
|
878. | 04/EE(E&M-II, LWR)VP/2022-23 | 01-08-2022 | 25-08-2022 | Dakpathar | Executive Engineer (E&M-II, LWR) Vyasi Project | Electrical and Mechanical | Supply Installation Flexi banner and supply of consumable material at Vyasi Project, Dam site Juddo, Vikas Nagar |
Corrigendum 1
|
879. | 07/EE(Civil)/MB-II/Chinyalisaur/2022-23 | 02-08-2022 | 25-08-2022 | Uttarkashi | Executive Engineer, (Civil), MB-II UJVNL Chinyalisaur, Uttarkashi (Uttarakhand) | Civil | Distempering and painting work of CP Type Block/Quarters at Shaktipruam colony MB-II, Chinyalisaur Uttarkashi. |
|
880. | NCB/08/EE(E&M)/PB/2022-23 | 18-07-2022 | 25-08-2022 | Rishikesh | Executive Engineer (E&M) Pashulok Barrage | Electrical and Mechanical | Design Engineering, Supply, Installation, Testing & commissioning of early warning system in downstream of Virbhadra Barrage, Rishikesh under DRIP, Phase-II. |
Corrigendum 1
|
881. | PDD-08/2022-23 | 02-08-2022 | 23-08-2022 | Dakpathar | Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Electrical and Mechanical | Annual Contract for Operation of 11 /0.4 KV Substation No-03, New Yamuna Colony Dakpathar. |
|
882. | 03/EE(Civil-II)/Vyasi HEP/2022-23 | 01-08-2022 | 23-08-2022 | Dakpathar | EE(Civil-II)Vyasi Project | Civil | Annual Cleaning, upkeeping, gardening and other miscellaneous work of Field Hostel Building and officer’s sport complex of Vyasi Project at Dakpathar, Dehradun (Year 2022-23). |
|
883. | 06/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 28-07-2022 | 23-08-2022 | Kalagarh | Executive Engineer(Civil) Kalagarh | Civil | Annual M & R Work of Type - IInd Residences at Hydel Colony Kalagarh |
|
884. | 05/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 28-07-2022 | 23-08-2022 | Kalagarh | Executive Engineer(Civil) Kalagarh | Civil | Annual Horticulture Maintenance, Development of Parks and misc. works at Ramganga Power House, Kalagarh |
|
885. | 04/EE(Civil)/Kalagarh/Pauri Garhwal/2022-23 | 28-07-2021 | 23-08-2022 | Kalagarh | Executive Engineer(Civil) Kalagarh | Civil | Annual General cleaning work of Hydel Colony Kalagarh |
|
886. | 06/EE(M&G)/MPH/2022-23 | 21-07-2022 | 23-08-2022 | Hardwar | Executive Engineer (M&G)Mohammadpur, Gurukul Narsan | Electrical and Mechanical | Supply of logbooks & cartridge at MPH |
Corrigendum 1
|
887. | 08/EE(E&M-I)/VP/2022-23 | 03-08-2022 | 22-08-2022 | Dakpathar | Executive Engineer (E&M-I), Vyasi Project, Dakpathar | Electrical and Mechanical | Comprehensive Annual Maintenance Contract (CAMC) of Network CCTV Camera system of Vyasi HEP at Power House site at Hathiyari & Dam site at Juddo. |
|
888. | 07/EE(E&M-I)/VP/2022-23 | 03-08-2022 | 22-08-2022 | Dakpathar | Executive Engineer (E&M-I), Vyasi Project, Dakpathar | Electrical and Mechanical | Annual Operation & Maintenance Contract for Electrical Installations & DG sets at Office & Residence |
|
889. | 06/EE(Test)/DKN/2022-23 | 02-08-2022 | 22-08-2022 | Dhakrani | EE (Test),Dhakrani | Electrical and Mechanical | SITC of numerical relays and annunciation panels |
|
890. | 01/UJVNL/IT/EE(IT)/2022-23 | 01-08-2022 | 22-08-2022 | Dehradun | EE (IT), UJVNL | Computers and Software | Operations, Maintenance & Hosting of UJVN Ltd. Website |
|
891. | 05/EE(IC&CM)/2022-23 | 01-08-2022 | 22-08-2022 | Dehradun | Executive Engineer (IC&CM), UJVN Ltd, Ganga Bhawan, Yamuna Colony, Dehradun | Electrical and Mechanical | Supply of cable of different specifications for different power Houses/Sites of UJVN LTD. |
|
892. | 06/EE/M&G/DLR/2022-23 | 30-07-2022 | 22-08-2022 | Dhalipur | E.E.-Maintenance & Generation | Electrical and Mechanical | Rewiring of various buildings at Dhalipur Power Station |
|
893. | 05/EE/M&G/DLR/2022-23 | 30-07-2022 | 22-08-2022 | Dhalipur | E.E.-Maintenance & Generation | Electrical and Mechanical | Fabrication & Erection of plate-form at colony T/ well of Dhalipur Power Station |
|
894. | 03/2022-23/EETest(GV)/Mayapur | 01-07-2022 | 22-08-2022 | Hardwar | Executive Engineer Test Ganga Velly Mayapur Haridwar | Electrical and Mechanical | Routine maintenance & testing related activities for Chilla, Pathri & Mohammadpur power houses under E.E (Test) Ganga Valley Haridwar |
Corrigendum 1
Corrigendum 2
Corrigendum 3
|
895. | 12/EE(M)/RPSK/2022-23 | 30-07-2022 | 20-08-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Supply and application of coating material on draft tube chamber of Unit-1 |
|
896. | 06/EE(E&M)/MB-II/Barrage/2022-23 | 15-07-2022 | 20-08-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Annual Routine Maintenance of Electro Mechanical and Hydro Mechanical Equipment’s of barrage including sweeping and cleaning for the year 2022-23 |
Corrigendum 1
|
897. | NCB-14/EE/PCM/Dhalipur/ 2022-23 | 12-07-2022 | 20-08-2022 | Dhalipur | Executive Engineer (PCM ), Dhalipur | Electrical and Mechanical | Providing fencing and caution /warning sign board along the reservoir & barrage. |
|
898. | 07/EE(GEN)/MB-II/2022-23 | 22-07-2022 | 19-08-2022 | Chinyalisaur | EE-Generation | Electrical and Mechanical | Procurement of Lightning Arrester (220KV) at MB-II, Dharasu Power House |
|
899. | 01/DGM (SHP-Civil)/2022-23 | 21-07-2022 | 19-08-2022 | Small Hydro Project | DGM-SHP Garhwal Srinagar | Civil | Finishing work at Powerhouse building and other Miscellaneous works at Madhyamaheshwar SHP (3x5) MW in District-Rudraprayag. |
|
900. | 06/EE(Civil-I)/ Urgam/2022-23 | 22-07-2022 | 18-08-2022 | Small Hydro Project | Executive Engineer (Civil-I) Guptkashi, Rudraprayag | Civil | Annual Repair & Maintenance work of Civil structures at Urgam SHP (2X1.5) MW in Distt- Chamoli |
|
901. | 10/EE(M)/RPSK/2022-23 | 06-07-2022 | 17-08-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Major overhauling of Unit-1 |
Corrigendum 1
|
902. | 09/EE(M)/RPSK/2022-23 | 06-07-2022 | 17-08-2022 | Kalagarh | E.E.-Maintenance | Electrical and Mechanical | Major repairing works of Main Inlet Valve (MIV) and bearing oil coolers of Unit-1 |
Corrigendum 1
|
903. | 04/EE(SOLAR)/2022-23 | 26-07-2022 | 16-08-2022 | Dehradun | EE(SOLAR) | Electrical and Mechanical | supply, Installation, Testing, Commissioning &Net metering work of proposed 15 kW grid connected roof top Solar Power Plant on SHP office, Near THDC Colony, Rishikesh, Dehradun. |
|
904. | T-18/EEM/2022-23 | 23-07-2022 | 16-08-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Miscellaneous works on pump section of chilla power house |
|
905. | T-16/EEM/2022-23 | 23-07-2022 | 16-08-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Supply & Fixing work of 63 Amp MCCB Supply unit at chilla Power House. |
|
906. | 12/EE(Pathri)/2022-23 | 22-07-2022 | 16-08-2022 | Hardwar | EE-M&G UGC-Projects Pathari | Electrical and Mechanical | Refilling & Repairing of various types of Fire Extinguishers and Procurement of different types of new Fire Extinguishers for Pathri Power House. |
|
907. | PDD-07/2022-23 | 21-07-2022 | 16-08-2022 | Dakpathar | Executive Engineer, Project Distribution Division, Dakpathar (Dehradun) | Electrical and Mechanical | Supply of LT XLPE& LT XLPE AB Cable of different sizes. |
|
908. | 10/UJVNL/EE(M&G)/KPS/2022-23 | 18-07-2022 | 16-08-2022 | Kulhal | E.E.-Maintenance - Generation | Electrical and Mechanical | Supply and fixing of various valves and pump at Kulhal Power Station |
Corrigendum 1
|
909. | NCB/07/EE(E&M)/PB/2022-23 | 14-07-2022 | 16-08-2022 | Rishikesh | Executive Engineer (E&M) Pashulok Barrage | Electrical and Mechanical | Providing & Fixing of New Prefabricated Cabin above hoisting equipment of under sluice gate, other way gates and head regulator at Virbhadra Barrage, Pashulok, Rishikesh” under DRIP, Phase-II |
|
910. | 10/EE(M&G)/DKN/2022-23 | 14-07-2022 | 16-08-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Hiring of vehicles for school going children of employees posted at Dhakrani Power Station |
Corrigendum 1
|
911. | 09/EE(G)/CPH/2022-23 | 13-07-2022 | 16-08-2022 | Dakpathar | E.E.-Generation Chibhro | Civil | Rebabbitting of Guide Bearing Pads (18 Nos.) of 60 MW Generator at Chibro Power House. |
Corrigendum 1
|
912. | 22/EE(M)/MB-II/22-23 | 07-07-2022 | 16-08-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Annual/Capital Maintenance of Machine No-1,2,3,4, of Dharasu Power House for the year 2022-23. |
Corrigendum 1
|
913. | 05/SPH/2022-23 | 07-07-2022 | 16-08-2022 | Lohiahead | Executive Engineer, Maint. & Generation | Electrical and Mechanical | General cleaning of power houses and other places at Sharda Power House, Lohiahead for one year. |
Corrigendum 1
Corrigendum 2
|
914. | 01/2022-23/DGM(CD-II)/CD&H,Rishikesh | 06-07-2022 | 16-08-2022 | Rishikesh | DGM Civil Design-II | Works Contract | Hiring of one no. Light diesel vehicle (M&M Bolero or equivalent) with driver for One Year (12 months ) For Dy.G.M. (CD-II) in CD&H Office, Pashulok, Rishikesh, Dehradun. |
Corrigendum 1
|
915. | T-17/EEM/2022-23 | 23-07-2022 | 13-08-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Supply & Fixing works of 4 no.Dowel Pin in TGB housing at chilla power house. |
|
916. | 05/EE(M&G)/MPH/2022-23 | 21-07-2022 | 11-08-2022 | Hardwar | Executive Engineer (M&G)Mohammadpur, Gurukul Narsan | Electrical and Mechanical | Procurement & refilling of various Fire extinguishers installed at Mohammadpur Power House |
|
917. | e-03/EE/M&G/DLR/2022-23 | 19-07-2022 | 10-08-2022 | Dhalipur | E.E.-Maintenance & Generation | Electrical and Mechanical | Supply of one number 132/11 kV, 20 MVA Generator Transformer for (3x17 MW) Dhalipur Power Station, Dehradun. |
Corrigendum 1
|
918. | T-14/EEM/2022-23 | 18-07-2022 | 10-08-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Sand cleaning of strainer floor works at chilla power house |
|
919. | T-13/EEM/2022-23 | 18-07-2022 | 10-08-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Repair and Rewinding of ceiling fans at Chilla Power House |
|
920. | NIT-24/EE(M)/MB-II/22-23 | 19-07-2022 | 09-08-2022 | Chinyalisaur | EE-Maintenance | Electrical and Mechanical | Repair and Rewinding of 90kw Flygt Make Cooling Water Pumps of Dharasu Power House. |
|
921. | T-15/EEM/2022-23 | 18-07-2022 | 09-08-2022 | Chilla | E.E.-Maintenance | Electrical and Mechanical | Supply of consumable items for chilla power house. |
|
922. | CH(Maint.)-10/2022-23 | 08-07-2022 | 09-08-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Replacement of Sill plate of Roller track guide of DT Gate of Unit # 2&3 at Chibro Power Station. |
Corrigendum 1
|
923. | 07/EE(E&M)/MB-II/Barrage/2022-23 | 15-07-2022 | 08-08-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Hiring of Non-AC diesel vehicles at Joshiyara Barrage, Uttarkashi for the period of one year |
|
924. | 05/EE(E&M)/MB-II/Barrage/2022-23 | 11-07-2022 | 08-08-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Procurements of miscellaneous items at Joshiyara Barrage, MB-II, Uttarkashi |
Corrigendum 1
|
925. | NCB/05/EE(E&M)/Asan Barrage/2022-23 | 05-07-2022 | 08-08-2022 | Dhakrani | Executive Engineer (E&M), Asan Barrage | Electrical and Mechanical | P&F of chequered plates at Hoist Bridges & miscellaneous fabrication works. |
|
926. | NCB/04/EE(E&M)/Asan Barrage/2022-23 | 05-07-2022 | 08-08-2022 | Dhakrani | Executive Engineer (E&M), Asan Barrage | Electrical and Mechanical | SITC of discharge measurement system at Asan River. |
|
927. | NCB/03/EE(E&M)/Asan Barrage/2022-23 | 05-07-2022 | 08-08-2022 | Dhakrani | Executive Engineer (E&M), Asan Barrage | Electrical and Mechanical | Protective coating on spillway gates & HR gates. |
|
928. | 01/EE(Test.)/MB-II/2022-23 | 28-06-2022 | 08-08-2022 | Chinyalisaur | Executive Engineer (Test) | Electrical and Mechanical | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 220V DC 1395AH Battery SET NO1 AT DHARASU POWER HOUSE |
Corrigendum 1
|
929. | 04/EE(E&M-II,LWR)VP/2022-23 | 22-07-2022 | 06-08-2022 | Dakpathar | Executive Engineer (E&M-II, LWR) Vyasi Project | Electrical and Mechanical | Supply, Installation of M.S Warning board at Vyasi Project. |
|
930. | CH(Maint.)-11/2022-23 | 15-07-2022 | 06-08-2022 | Dakpathar | E.E.-Maintenance Chibhro | Electrical and Mechanical | Supply of Self Lubricating Guide vane Bushes and lip seal of 60 MW Machines at Chibro |
|
931. | 10/EE(G)/CPH/2022-23 | 13-07-2022 | 06-08-2022 | Dakpathar | E.E.-Generation Chibhro | Civil | Replacement of Air Filter Assembly of 4*60 MW Generator at Chibro Power Station. |
|
932. | 02/UJVNL/IT/EE(EM)/2022-23 | 28-06-2022 | 06-08-2022 | Dehradun | Executive Engineer (E&M-II) | Electrical and Mechanical | Establishment of Local Area Network (LAN) at New Corporate Building of UJVN Ltd., Dehradun |
Corrigendum 1
Corrigendum 2
|
933. | 02/EE/M&G/DLR/2022-23 | 14-07-2022 | 05-08-2022 | Dhalipur | E.E.-Maintenance & Generation | Electrical and Mechanical | Hiring of 27 seater bus model 2020 or later for school going children of employees posted at Dhalipur Power Station for academic year 2022-23 & 2023-24. |
|
934. | 12/EE(M&G)/DKN/2022-23 | 14-07-2022 | 05-08-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Overhauling of 132 KV Bus Isolators of Generator at Dhakrani Power Station |
|
935. | 11/EE(M&G)/DKN/2022-23 | 14-07-2022 | 05-08-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Annual Maintenance Contract for Grass Cutting & Gardening activities at Dhakrani |
|
936. | 08/EE(M&G)/DKN/2022-23 | 14-07-2022 | 05-08-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | Refiling of various types of fire extinguisher at Dhakrani Power Station |
|
937. | 03/EE(Civil-II)/SHP/Maneri/2022-23 | 12-07-2022 | 05-08-2022 | Uttarkashi | Executive Engineer-II (Civil), SHP, UJVN Ltd., Maneri, Uttarkashi | Civil | Repair and Maintenance of Pilangad colony Internal road and other miscellaneous works at SHP Pilangd Uttarkashi. |
|
938. | 09/EE(M&G)/DKN/2022-23 | 14-07-2022 | 04-08-2022 | Dhakrani | E.E.-Maintenance& Generation | Electrical and Mechanical | AMC for trash rack cleaning & other O&M activities at Dhakrani Power Station |
|
939. | 06/EE(G)/Klg/2022-23 | 14-07-2022 | 04-08-2022 | Kalagarh | E.E.-Generation | Electrical and Mechanical | Refilling of fire extinguishers including supply of accessories. |
|
940. | 03/EE(M)/2022-23 | 12-07-2022 | 04-08-2022 | Uttarkashi | EE-Maintenance Tiloth | Electrical and Mechanical | Reconstruction of damaged 33 KV line from Heena substation to Maneri dam |
|
941. | 02/EE(M)/2022-23 | 12-07-2022 | 04-08-2022 | Uttarkashi | EE-Maintenance Tiloth | Electrical and Mechanical | Annual repairing and rewinding of different induction motors (ii) Reconstruction of damaged 33 KV line from Heena substation to Maneri dam |
|
942. | 08/EE(G)/CPH/2022-23 | 12-07-2022 | 04-08-2022 | Dakpathar | E.E.-Generation Chibhro | Electrical and Mechanical | Supply of spare parts & AMC of 11kV lines from Chibro Power House to Inchari Dam |
|
943. | 07/EE(G)/CPH/2022-23 | 12-07-2022 | 04-08-2022 | Dakpathar | E.E.-Generation Chibhro | Electrical and Mechanical | Supply of spare parts & overhauling of 33/11kV, 1.5 MVA Transformers with associated equipment at Chibro Sub Station. |
|
944. | 06/EE(Civil)/MB-II/Chinyalisaur/2022-23 | 04-07-2022 | 04-08-2022 | Uttarkashi | Executive Engineer, (Civil), MB-II UJVNL Chinyalisaur, Uttarkashi (Uttarakhand) | Civil | Carrying out Geophysical tests regarding Remedial measures for controlling/stopping of Leakage/Seepage water over alignment of HRT of MB-II HEP (4X76MW) at Gamri Gad. |
Corrigendum 1
|
945. | 04/EE(Maint.)/Khodri/2022-23 | 28-06-2022 | 03-08-2022 | Dakpathar | E.E.-Maintenance Khodri | Electrical and Mechanical | Modification of opening arrangement of Main Inlet Valve (MIV) ofunit no 2,3,4 of Khodri Power House. |
Corrigendum 1
|
946. | 04/EE(E&M)/MB-II/Barrage/2022-23 | 11-07-2022 | 01-08-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Overhauling and repairing of different capacity distribution transformers at Joshiyara Barrage, Uttarkashi |
|
947. | 03/EE(E&M)/MB-II/Barrage/2022-23 | 11-07-2022 | 01-08-2022 | Uttarkashi | Executive Engineer (E&M) Joshiyara Barrage | Electrical and Mechanical | Annual Routine Maintenance of Electrical work of colony and HT / LT Line at Joshiyara Colony |
|
948. | 05/Manager(A&S)/2022-23 | 08-07-2022 | 01-08-2022 | Dehradun | Manager (A & S), Ujjwal ,Dehradun | Administrative Works and Purchases | Miscellaneous civil maintenance work at corporate office, UJJWAL, Maharani Bagh, G.M.S. Road, Dehradun |
|